| Date |
Text |
| 2020-10-09 17:18:06 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. |
| | |
| | FLORIDA BUILDING CODE 2017 6TH EDITION |
| | FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED |
| | NFPA 70 2014 EDITION |
| | |
| | JAKE LEAHY BN, BU, PX |
| | ELECTRICAL PLANS EXAMINER II |
| | 561-805-6713 |
| | [email protected] |
| | |
| | 1) VALUE OF PERMIT IS TO REFLECT ALL MATERIALS, |
| | EQUIPMENT AND LABOR FOR A COMPLETE SYSTEM (3100) |
| | |
| | 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF |
| | THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF |
| | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED, |
| | QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS |
| | (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE |
| | BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION |
| | OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT |
| | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, |
| | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, |
| | ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 2) ATS ARE THEY SERVICE ENTRANCE RATED? |
| | |
| | 3) 10 X 10 GUUTER AT SERVICE HOW MANY CONDUCTORS ARE |
| | GOING TO BE IN THIS GUTTER? |
| | |
| | 4) FEEDER TAP OFF GENERATOR WHICH SECTION DOES IT |
| | COMPLY WITH IN 240.21? |
| | |
| | 5) GROUNDING ELECTRODE SHOWN DOES NOT MEET THE CODE IT |
| | IS EITHER DONE IN THE LINE GITTER AT THE TOP OR IN EACH |
| | INDIVIDUAL DISCONNECT UNDER THE GUTTER. 250.64(D) |
| | |
| | 6) SHOW LOCATION OF THE GUTTER AT THE SERVICE IN |
| | RELATION TOO THE GENERATOR (DISTANCE) |
| | |
| | 7) FEEDER OF 400A TRANSFER SWICH ONLY 4/0 CONDUCTORS? |
| | |
| | 8) LOADS BEING FED BY GERNERATOR? LOAD CALCULATION |
| | REQUIRED. |
| | |
| | 9) IS THIS LEGALLY REQUIRED SYSTEM? PER 702. |
| | |
| | |