Plan Review Notes
Plan Review Notes For Permit 20090889
Permit Number 20090889
Review Stop P
Sequence Number 1
Notes
Date Text
2020-10-21 14:48:09CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2017 6TH
 EDITION; LEVEL 2
 FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION
 FBC FG = FLORIDA FUEL GAS CODE 2017 6TH EDITION
 NFPA 58 = LIQUIFIED PETROLEUM GAS CODE
 NFPA 54 = NATIONAL FUEL GAS CODE
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
 1ST REVIEW
 PLUMBING COMMENTS: DENIED
  
 1.RE: P01.01 NOTE WITH REFERENCE TO P04.01/DETAIL 6.
 A) NOTE CALLS FOR 1-1/4 INCH COPPER DRAINS/VENTS.
 DETAIL CALLS FOR CPVC 1-1/2 INCH DRAINS/VENTS. PER WPB
 FBC 107.2.1, CLARIFY.
 B) NOTE DIRECTS INSTALLER TO CONNECT TO THE NEAREST HUB
 DRAIN. NEITHER EXISTING (DEMO) OR NEW PLAN SHOWS A HUB
 DRAIN IN THE VICINITY OF THE EQUIPMENT. PER WPB FBC
 107.2.1, CLARIFY.
 C) PER WPB FBC 107.2.1, PROVIDE MANUFACTURER'S
 SPECIFICATION/INSTALLATION MANUAL FOR NEW ALTO SHAAM
 CTP720 E AND FOR EXISTING /RELOCATED CTP 10-10 E
 D) PER WPB FBC 107.2.1, PROVIDE MANUFACTURER'S
 SPECIFICATION FOR FLEXIBLE WATER CONNECTORS FOR
 FILTERED AND UNFILTERED WATER.
  
 2. P04.01/DETAIL 3 AND SPECIFICATION PM07.01, SECTION
 3.4.1.1 CONTRADICT EACH OTHER. PER WPB FBC 107.2.1,
 CLARIFY.
  
 3.PER WPB FBC 107.2.1, PROVIDE NOTE UNDER SPECIFICATION
 PM07.01, SECTION 3.5.1 STATING "PER FBC PL 705.6.3,
 SOLDER JOINTS SHALL BE MADE IN ACCORDANCE WITH THE
 METHODS OF ASTM B828. CUT TUBE ENDS SHALL BE REAMED TO
 THE FULL INSIDE DIAMETER OF THE TUBE END. ALL JOINT
 SURFACES SHALL BE CLEANED. A FLUX CONFORMING TO ASTM
 B813 SHALL BE APPLIED. THE JOINT SHALL BE SOLDERED WITH
 A SOLDER CONFORMING TO ASTM B32."
  
 4.PER WPB FBC 107.2.1, PROVIDE NOTE REFERENCING
 SPECIFICATION SHEETS PM06.01 AND PM07.01, SECTION 22 40
 00 PLUMBING FOR ADDITIONAL SPECIFICATIONS
  
 5.REGARDING THE ADDED HUB DRAIN FOR CD-1 CONNECTED TO
 THE GREASY WASTE, PER WPB FBC 107.2.1, PLEASE CLARIFY
 WHAT IS TO DISCHARGE INTO THE HUB DRAIN AND FROM WHAT
 EQUIPMENT. BASED UPON P04.01/DETAIL 3, IT APPEARS THAT
 THE HUB DRAIN IS TO RECEIVE CONDENSATION FROM A
 REFRIGERATED CASE; PLEASE NOTE PER FBC PL 1003.3.1
 GREASE INTERCEPTORS AND AUTOMATIC GREASE REMOVAL
 DEVICES SHALL RECEIVE WASTE ONLY FROM FIXTURES AND
 EQUIPMENT THAT ALLOW FATS, OILS OR GREASE TO BE
 DISCHARGED. PER WPB FBC 107.2.1, CLARIFY WHAT KIND OF
 WASTE IS TO BE DISCHARGED INTO THE REFERENCED HUB DRAIN
 AND IF SAID WASTE DOES NOT SATISFY THE REQUIREMENTS OF
 FBC PL 1003.3.1, THEN CONNECT TO SANITARY.
  
  
 END OF COMMENTS.
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
 ALL PLANS TO BE SIGNED AND SEALED OR DIGITALLY SIGNED
 AND SEALED BY THE DESIGNER IN ACCORDANCE WITH FAC AND
 FS.
  
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 PHONE 561-246-0882 MOBILE
  
 20090889 375 S ROSEMARY AVE


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved