Date Text
2021-03-24 16:42:4703/24/21 3RD PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. PERMIT Z20010014, REFER TO EMAIL SENT TO ARCHITECT
 FROM MRS. S, HILL.
  
 2. DONE.
  
 3. DONE.
  
 4. DONE.
  
 5. DONE.
  
 6. DONE.
  
 7. DONE.
  
 8. DONE.
  
 9. DONE.
  
 10. DONE.
  
 11. DONE.
  
 12. DONE.
  
 13. DONE.
  
 14. DONE.
  
 15. DONE.
  
 A. DONE.
  
 B. DONE.
  
 C. DONE.
  
 D. DONE.
  
 16. DONE
  
 17. DONE
  
 18. ON SHEET A422,
 A. DONE.
  
 B. ON DETAIL 13 AND 15, THE GRAB BARS SHALL BE MEASURED
 TO THE TOP OF THE GRIPPING SURFACE PER THE 2017 FBC ACC
 SEC. 609.4. ON DETAIL 13 AND 18, PLEASE SHOW THE TOILET
 PAPER DISPENSERS 7? INCHES MINIMUM AND 9? INCHES
 MAXIMUM IN FRONT OF THE WATER CLOSET MEASURED TO THE
 CENTERLINE OF DISPENSER PER THE 2017 FBC ACC SEC.
 604.7.
  
 C. DONE.
  
 19. DONE.
  
 NOTE, PLEASE CORRECT ALL ACCESSIBILITIES PAGES TO
 COINCIDE WITH EACH OTHER, TOO MANY TO ITEMIZE. THANK
 YOU.
  
 20. DONE.
  
 21. DONE.
  
 22. DONE ALL.
  
 A. DONE.
  
 B. DONE.
  
 C. DONE.
  
 D. DONE.
  
 E. DONE.
  
 23. DONE.
  
 24. DONE.
  
 25. DONE.
  
 26. DONE.
  
 27. DONE.
  
 28. ON SHEET P201,
  
 A. ALL TAGS ARE NOTED. PLEASE REMOVE CLOUDS FOR CLARITY
 PER THE WPB FBC 107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS.
  
 B. DONE.
  
 C. DONE.
  
 D. DONE.
  
 E. THE ELEVATORS MUST BE ON AN INDIRECT WASTE NOT TO
 THE SANITARY, SO PLEASE PROVIDE A DETAIL THAT SHOWS THE
 INDIRECT CONNECTION PER THE 2017 FBC SEC. P 1113.
  
 F. THE LINE IN THE STORAGE ROOM MUST HAVE A TRAP PRIMER
 AND A FUNNEL FOR THE INDIRECT WASTE FROM THE PUMP, AND
 IT NEEDS TO BE LOCATED AT THE STORAGE ROOM AND SHOW ON
 P801 AND SHOW ON P201 PER THE WPB FBC 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 29. ON SHEET P805;
  
 A. PLEASE PROVIDE THE GPM AND ROOF AREA IN FEET OF
 COVERED AREA FOR EACH RAIN LEADER STORMWATER RISER
 DIAGRAM FOR THE 2017 FBC SEC CALCULATIONS. P1106.
  
 B. PLEASE SHOW THE SLOPE OF ALL HORIZONTAL PIPES PER
 THE WPB FBC 107.2.1 INFORMATION ON CONSTRUCTION
 DOCUMENTS. SHOW THE HORIZONTAL PIPE SLOPE ON THE PLAN.
  
 30. DONE.
  
 31. DONE.
  
 PLEASE NOTE THAT A SHEET FOR THE CIVIL DRAWING IS
 REQUIRED ON THIS SET OF PLANS SUBMITTED IN COMMENT ONE.
  
 32. DONE.
  
 33. DONE.
  
 34. DONE.
  
 35. DONE.
  
 36. DONE.
  
 37. DONE.
  
 38. DONE.
  
 39. DONE.
  
 40. DONE.
  
 41. ON SHEET P801,
  
 A. DONE, PLEASE PROVIDE THIS VERBIAGE ON THIS PAGE FOR
 YOUR RESPONSE
  
 B. DONE, PLEASE REMOVE ALL CLOUDS ON THIS PAGE AND ALL
 OTHER PAGES ON THE PREVIOUS REVIEW THAT HAVE BEEN
 ADDRESSED FOR CLARITY PER THE WPB FBC 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 C. DONE.
  
 D. DONE.
  
 42. ON SHEETS P802,
  
 A. DONE.
  
 B. DONE.
  
 C. DONE.
  
 D. NOT TO CLEAR ON THIS TASK P201 WE COULD NOT FIND THE
 RESPONSE MADE, PLEASE CLARIFY PER THE WPB FBC 107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 E. CONTINUATION POINTS ON P801 AND P502 ARE NOT CLEAR
 AND POINTING TO THE WRONG PIPES IN SOME CASES. PLEASE
 CORRECT TO REFECTION CONNECTION POINTS PER THE WPB FBC
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 43. DONE
  
 44. PLEASE REMOVE THE CLOUDS ON THE PLANS AS THESE ARE
 CONFUSING IN THE FIELD. THIS IS FOR FIELD CLARITY PER
 WPB FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 SUGGESTION TO PUT 801E AND 802W TO REFER RISER BETTER.
  
 45. DONE.
  
 46. DONE.
  
 47. DONE.
  
 48. DONE.
  
 49. DONE.
  
 50. DONE.
  
 51. DONE AS A NOTE.
  
 52. ON P601, ON THE INDIRECT CONNECTION FOR THE SUMP
 DETAIL, THREE IS SAID TO SANITARY, AND NO DIRECT DETAIL
 OR REFERENCE IS NOTED. PLEASE CORRECT PER THE WPB FBC
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 53. DONE.
  
 54. THE CIVIL PLANS ARE NOT PART OF THIS SUBMITTED SET
 PLANS AND ARE NOT AN ELECTRIC VERSION AS THEY ARE A
 PAPER PLAN. THOSE PLANS ARE FOR REVIEW AND ARE
 SUBMITTED FOR A DIFFERENT DEPARTMENT, AND WE WOULD NEED
 CIVIL SUBMITTED WITH THESE SETS. THE CHIEF PLAN
 EXAMINER WILL BE SENT OUT AN EMAIL CLARIFYING THIS
 REQUEST TO THE ARCHITECTURAL FIRM ON FILE.
 THE INFORMATION FOR THE GREASER INTERCEPTOR IS A ZONING
 REVIEW, AND AS REQUESTED IN THE PREVIOUS COMMENT, A
 CIVIL PLAN WAS ASKED FOR A REVIEW. CONTACT THE CITY'S
 ENGINEERING DEPT, AT 561-494-1040 FOR FURTHER
 INFORMATION ON STANDARD DRAWING GC-7.
  
 55. DONE.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved