| Date |
Text |
| 2020-10-02 08:19:30 | 010/02/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | |
| | 2. A SITE PLAN DEPICTING THE GENERAL LOCATION OF THE |
| | PROPOSED BACKFLOW PREVENTION DEVICE, THIS CAN BE DONE |
| | BY GOING TO THE PROPERTY APPRAISER WEBSITE AND PRINT |
| | OUT A STRUCTURAL LAYOUT OF THE BUILDING AND HAND DRAW |
| | THE METER LOCATION WITH THE BACKFLOW. |
| | |
| | 3. TWO COPIES OF THE MANUFACTURER'S SPECIFICATIONS FOR |
| | THE BACKFLOW PREVENTER. THE MAKE, MODEL, AND SIZE OF |
| | THE DEVICE SHALL BE LISTED IN THE DESCRIPTION OF THE |
| | WORK SECTION ON THE PERMIT APPLICATION. |
| | |
| | 4. DOCUMENTATION THAT THE PROPOSED DEVICE IS LEAD-FREE |
| | WHICH CONTAINS NOT MORE THAN 0.2-PERCENT LEAD. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |