Plan Review Notes
Plan Review Notes For Permit 20090711
Permit Number 20090711
Review Stop P
Sequence Number 1
Notes
Date Text
2020-10-14 10:57:211) SHT. P200 - THE HOSE BIBB ON THE EXTERIOR REQUIRES
 AN INDIVIDUAL SHUTOFF VVALVE PER FBC-PLUMBING SEC.
 606.2.
 2) SHT. P200 - THE ICE MAKER ON THE REFRIGERATORR SHALL
 BE EQUIPPED WITH AND AIR ARRESTOR ANND A BACKFLOW
 DEVICE PER 604.9 & 608..3.
 3) SUBMIT MANUFACTURER'S SPECIFICATIOONS FOR THE SUMP &
 PUMP FOR THE BREAK ROOM SINK. WPB AMEND. TO FBC SEC.
 107.2.1.
 4) SUBMIT MANUFACTURER'S SPECS FOR THE SEP CABINET. A
 BACKFLOW PREVENTION DEVICE MAY BE REQUIRED FOR THE
 WATER CONNECTION.FBC-PLUMBING SEC. 608..3.
 5) SUBMIT MANUFACTURER'S SPECIICATIONS/ INSTALLATION
 DOCUMENTS FOR THE SIEMANS CHILLED WATER EQUIPMENT.WPB
 AMEND. TO FBC SEC. 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved