Plan Review Notes
Plan Review Notes For Permit 20090622
Permit Number 20090622
Review Stop P
Sequence Number 1
Notes
Date Text
2020-10-05 10:54:511) THE PLANS SHOW NEW WALLS FOR THE TOILET ROOM.SINCE
 NEW WALLS WILL BE CONSTRUCTED THE GRAB BARS WILL HAVE
 TO MEET THE REQUIREMENTS FORNEWCONSTRUCTION.
 2) THE HEIGHT OF TE GRAB BARS SHALL BE LOCATED 33-36
 INCHES ABOVE THE FINISH FLOOR MEASURED TO THE TOP OF
 THE GRIPPING SURFAE PER FBC-ACCESSIBILITY SEC. 609.4.
 3) MIRRORS SHALL BE LOCATED WITH THE BOTTOM EDGE OF THE
 REFLECTING SURFACE 40 INCHES MAXIMUM ABOVE THE FINISH
 FLOOR. FBC-ACCESS. SEC.603.3.
 4) THE LOCATION OF THE GRAB BARS SHALL COMPLY WITH
 FBC-ACCESS. SECS.604.5.1, 604.5.2.
 5) THE LOCATION OF THE TOILET PAPER DISPNSER SHALL
 COMPLY WITH FBC-ACCESS. SEC. 604.7.
 6) SHOW THE FLUSH CONTROLS FOR THE WATER CLOSET. THE
 FLUSH CONTROLS SHALL COMPLY WITH FBC-ACCESS. SEC.
 604.6.
 7) THE FAUCET SHALL COMPLY WITH FBC-ACCESS. SEC.606.4,
 309.
 8) THE FLOOR DRAIN IN THE TOILET ROOM CANNOT DISHARGE
 TO THE GREASE INTERCEPTOR.FBC-PLUMBING SEC. 1003.2.
 9) SUBMIT MANUFACTURER'S SPECIFICATIONS AND SIZING
 CALCULATIONS FOR THE GREASE INTERCEPTOR. FBC-PLUMBING
 SEC. 1003.2.
 10) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE YOGURT
 MACHINES.WPB AMEND. TO FBC SEC. 107.2.1.
 11) THE TRAP SEAL IN THE FLOOR DRAINS SHALL BE
 PROTECTED PER FBC-PLUMBING SEC.1002.4.1.
 12) THE GREASE INTERCEPTOR SHALLL HAVE A SAMPLING PORT
 ON THE DISCHARGE SIDE OF THE INTERCEPTOR. A 4-INCH
 TWO-WAY CLEANOUT WILL SUFFICE. SHOW THIS ON THE RISER
 DIAGRAM.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR