Plan Review Notes
Plan Review Notes For Permit 20090500
Permit Number 20090500
Review Stop P
Sequence Number 1
Notes
Date Text
2020-10-06 15:55:14CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2017 6TH EDITION
 WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017
 6TH ED, CHAPTER 1.
 WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL
 MANUAL REVISED 2017
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2017
 6TH EDITION
 FBC ACC = FLORIDA ACCESSIBILITY CODE 2017 6TH EDITION
 FBC EX = FLORIDA EXISTING BUILDING CODE 2017 6TH
 EDITION
 FBC PL = FLORIDA PLUMBING CODE 2017 6TH EDITION
 NFPA 99 = HEALTH CARE FACILITIES CODE
 FAC= FLORIDA ADMINISTRATIVE CODE
 FS = FLORIDA STATUTES
  
  
 1ST REVIEW
 PLUMBING COMMENTS: DENIED
 A REVIEW OF MINIMUM PLUMBING FIXTURE REQUIREMENTS AS
 REQUIRED BY FBC ACC IS PART OF THE PLUMBING REVIEW
 PROCESS BUT IS TYPICALLY ADDRESSED ON THE ARCHITECTURAL
 PLANS. ANY COMMENTS CONCERNING THESE REQUIREMENTS MUST
 BE SATISFACTORILY ADDRESSED PRIOR TO A PLUMBING REVIEW
 APPROVAL.
  
 1.IS THERE A STORM PIPING SYSTEM IN THE BUILDING OR IS
 THE BUILDING BEING DRAINED BY SCUPPERS AND A GUTTER
 SYSTEM. PER WPB FBC 107.2.1, INDICATE ON THE ROOF PLAN
 HOW THE REQUIREMENTS OF FBC PL CHAPTER 11 ARE BEING
 MET. SHOW EXISTING ROOF DRAINS, OVERFLOW DRAINS AND/OR
 EXISTING GUTTERS. IF THERE IS AN EXISTING STORM PIPING
 SYSTEM, THEN PROVIDE FOR REFERENCE A COPY OF RECORD
 DRAWINGS FOR THE INSTALLATION.
  
 2.HORIZONTAL SANITARY DRAINAGE PIPING IS SUSPENDED IN
 THE CEILING OF THE SECOND FLOOR. PER WPB FBC 107.2.1,
 PROVIDE SECOND FLOOR PLAN SHOWING ALL RATED WALLS THAT
 SAID PIPING WILL PENETRATE.
  
 3.PER WPB FBC 107.2.1, PROVIDE FIXTURE SCHEDULE SHOWING
 MINIMUM REQUIRED PLUMBING FIXTURES AND QUANTITIES AND
 ACTUAL TO SHOW COMPLIANCE WITH FBC PL 403.1 AND TABLE
 403.1.
  
 4.RE: PLAN G4.01, ADA STANDARDS; IT IS NOTED THAT THIS
 SHEET IS PROVIDED FOR GUIDANCE ONLY AS STATED ON THE
 PLAN. PLEASE NOTE THAT FIGURE 10; TYPICAL TOILET
 LAYOUTS, DOES NOT APPLY TO ANY OF THE CONFIGURATION IN
 THE CONSTRUCTION DOCUMENTS. ACCESSIBILITY REQUIREMENTS
 SHALL COMPLY WITH 2017 FLORIDA BUILDING CODE:
 ACCESSIBILITY AS STATED ON PLAN SHEET G.001. PER WPB
 FBC 107.2.1 AND FBC PL 404.1, PROVIDE FLOOR PLAN
 DETAILS AND ELEVATION DETAILS OF ACCESSIBLE
 TOILET/BATHING ROOMS, SHOWERS, DRINKING FOUNTAINS, AND
 SINKS (SUBMITTED PLAN SHEETS A8.01 AND A8.51 PROVIDE
 ADEQUATE ELEVATIONS FOR SINKS IN CASEWORK) AND SHOWING
 COMPLIANCE WITH FBC ACC CHAPTERS 2, 3 AND 6. PLAN SHEET
 A2.01 PROVIDES ENLARGED PLAN VIEWS OF TOILET/BATHING
 ROOMS BUT SIZED CLEAR FLOOR SPACES ARE NOT EASILY
 IDENTIFIED, TURNING SPACES ARE NOT SHOWN AND ELEVATIONS
 OF THESE ROOMS SHOWING THE ACCESSIBILITY REQUIREMENTS
 ARE NON-EXISTENT. LOCKER ROOM SHOWERS SHALL COMPLY WITH
 FBC ACC 608.2.1, 608.3.1 AND 608.5.1. GRAB BARS SHALL
 BE INSTALLED IN A HORIZONTAL POSITION, 33 INCHES
 MINIMUM AND 36 INCHES MAXIMUM ABOVE THE FINISH FLOOR
 MEASURED TO THE TOP OF THE GRIPPING SURFACE, NOT
 CENTERLINE PER FBC ACC 609.4.
  
 5.PROVIDE ON THE ARCHITECTURAL OR LIFE SAFETY THIRD
 FLOOR PLAN ALL FORWARD AND/OR PARALLEL APPROACH CLEAR
 FLOOR SPACES FOR ACCESSIBLE SINKS IN CASEWORK AND THE
 DRINKING FOUNTAIN(S).
  
 6.PER WPB FBC 107.2.1 AND 107.3.5.1.3, PROVIDE SIZED
 DOMESTIC WATER, SANITARY, COMPRESSED AIR AND CLEAR
 WASTE WATER RISER DIAGRAMS.
 A.WATER RISER DIAGRAM SHALL SHOW ALL VALVES, BACKFLOW
 DEVICES, IN-LINE EQUIPMENT (I.E. RECIRCULATING PUMP,
 THERMAL MIXING VALVE), WATER HEATER, POINTS OF
 CONNECTION TO FIXTURES/EQUIPMENT AND OWNER SUPPLIED
 EQUIPMENT AND TO EXISTING SOURCE OF COLD WATER.
 B.SANITARY RISER DIAGRAM SHALL SHOW ALL TRAPS, FLOOR
 DRAINS, HUB DRAINS, TRAP PRIMER CONNECTIONS, CLEANOUTS,
 VENTS, POINTS OF CONNECTION TO FIXTURES/EQUIPMENT AND
 OWNER SUPPLIED EQUIPMENT AND TO EXISTING SANITARY
 RISER. IF AN EQUIPMENT ITEM SUCH AS AN ICE MACHINE
 REQUIRES A DRAIN, THEN A WASTE RECEPTACLE AND INDIRECT
 WASTE AND AIR GAP SHALL BE PROVIDED TO COMPLY WITH THE
 PROVISIONS OF FBC PL CHAPTER 8.
 C.COMPRESSED AIR TO SHOW PIPE, VALVES, REGULATORS,
 FILTERS AND FITTINGS, SOURCE COMPRESSOR AND POINT OF
 CONNECTION TO EQUIPMENT BEING SERVICED.
 D.CLEAR WASTEWATER RISER DIAGRAM SHALL SHOW ALL
 EQUIPMENT POINTS OF CONNECTION, TRAPS, VENTS AND POINT
 OF DISPOSAL.
  
 7. PER WPB FBC 107.2.1, PROVIDE DETAIL(S) FOR CLEAR
 WASTEWATER EQUIPMENT CONNECTIONS AND POINT OF DISPOSAL.
 REGARDING THE A/C CONDENSATE DISCHARGING TO THE
 JANITOR?S SINK; PER NFPA 99-15 SECTION 8.3.11.4, EXCESS
 CLEAR WASTEWATER SHALL BE DISCHARGED TO A STORM SEWER
 OR RECHARGED INTO THE WATER TABLE AS PERMITTED BY
 APPLICABLE PLUMBING CODES. DEPENDING ON FUTURE
 EQUIPMENT SUBMITTALS (I.E. STERILIZERS, ICE MACHINES,
 ETC.) THIS MAY APPLY TO OTHER EQUIPMENT DRAINS AS WELL
 AS THE AIR HANDLING UNIT CONDENSATE DRAINS.
 ADDITIONALLY, WPB UTILITIES DEPARTMENT PROHIBITS
 DISCHARGE OF CONDENSATE WASTE TO THE CITY SEWERS. PER
 WPB FBC 107.2.1, PROVIDE POINT OF DISPOSAL OF THE CLEAR
 WASTEWATER EITHER TO STORM OR GROUND. PROVIDE ROUTING
 AND DETAIL FOR POINT OF DISPOSAL.
  
 8.PER WPB FBC 107.2.1, PROVIDE A TRAP PRIMER DETAIL.
  
 9.PER WPB FBC 107.2.1, PROVIDE A FULL SCHEDULE OF OWNER
 PROVIDED EQUIPMENT. INDICATE ON THE SCHEDULE ALL
 UTILITY SERVICE CONNECTION REQUIREMENTS INCLUDING BUT
 NOT LIMITED TO WATER AND WASTE. PROVIDE MANUFACTURER?S
 SPECIFICATIONS/INSTALLATION MANUAL FOR ALL OWNER
 SUPPLIED EQUIPMENT. SAID DOCUMENTS MAY BE SUBMITTED AS
 A DEFERRED SUBMITTAL IN ACCORDANCE WITH WPB FBC 107.2.1
 AND 107.3.4.1. SEE WPB FBC 107.3.4.2 DEFERRED
 SUBMITTALS; FOR THE PURPOSES OF THIS SECTION, DEFERRED
 SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN
 THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION
 AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL
 WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL
 ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING
 OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS
 ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE
 BUILDING OFFICIAL. THIS MAY BE DONE BY NOTING SUCH IN
 THE RESPONSE LETTER TO THIS REVIEW.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 10.RE: PLAN F1.1, ALL TOILET ROOMS, ROOMS 3032, 3041,
 3042 AND 3047 (JANITOR SERVICE SINKS AND CLINICAL
 SERVICE SINK); WALLS AND PARTITIONS WITHIN 2 FEET (610
 MM) OF SERVICE SINKS, URINALS AND WATER CLOSETS SHALL
 HAVE A SMOOTH, HARD, NONABSORBENT SURFACE, TO A HEIGHT
 OF NOT LESS THAN 4 FEET (1219 MM) ABOVE THE FLOOR, AND
 EXCEPT FOR STRUCTURAL ELEMENTS, THE MATERIALS USED IN
 SUCH WALLS SHALL BE OF A TYPE THAT IS NOT ADVERSELY
 AFFECTED BY MOISTURE PER FBC 1210.2.2. EPOXY AND PAINT
 FINISHES DO NOT COMPLY WITH THE REQUIREMENTS OF THIS
 SECTION.
  
 11.RE: P0.01/ DETAIL H3, WATER HEATER SCHEMATIC;
 A.REGARDING THE GALVANIZED NIPPLE, PER FBC PL 605.24.1,
 JOINTS BETWEEN COPPER OR COPPER-ALLOY TUBING AND
 GALVANIZED STEEL PIPE SHALL BE MADE WITH A BRASS
 FITTING OR DIELECTRIC FITTING OR A DIELECTRIC UNION
 CONFORMING TO ASSE 1079. THE COPPER TUBING SHALL BE
 SOLDERED TO THE FITTING IN AN APPROVED MANNER, AND THE
 FITTING SHALL BE SCREWED TO THE THREADED PIPE.
 B.NOTE PERTAINING TO ASME RELIEF VALVE DISCHARGE PIPE
 SHALL HAVE THE WORDS THROUGH AN AIR GAP ADDED AT THE
 END OF THE SENTENCE
 C.PER WPB FBC 107.2.1, SHOW TEMPERATURE OF HOT WATER
 FEED FROM WATER HEATER AS 140 DEGREES F AND SHOW
 DESIGNATED BRANCH TO MIXING VALVE (DETAIL H10).
 D.PER FBC PL 504.7, PROVIDE A PAN FOR THE WATER HEATER.
 COMPLY WITH FBC PL 504.7, 504.7.1 AND 504.7.2. PROVIDE
 A HOUSEKEEPING PAD IF REQUIRED TO PROVIDE AMPLE
 ELEVATION FOR DRAIN DISCHARGE TO FLOOR DRAIN.
 E. PER WPB FBC 107.2.1, PROVIDE NOTE STATING
 "WATER-HEATING EQUIPMENT NOT SUPPLIED WITH INTEGRAL
 HEAT TRAPS AND SERVING NONCIRCULATING SYSTEMS SHALL BE
 PROVIDED WITH HEAT TRAPS ON THE SUPPLY AND DISCHARGE
 PIPING ASSOCIATED WITH THE EQUIPMENT" TO SHOW
 COMPLIANCE WITH FBC EC C404.3.
  
 12.RE: P0.01 PLUMBING FIXTURE SCHEDULE; P-7 RECESSED
 BOX. WHAT KIND OF EQUIPMENT IS BEING SERVICED? A COFFEE
 MAKER OR ICE MACHINE REQUIRES A BACKFLOW PREVENTION
 DEVICE TO COMPLY WITH THE REQUIREMENTS OF FBC PL 608
 AND IN INSTANCES WHERE QUICK CLOSING VALVES ARE
 UTILIZED, A WATER HAMMER ARRESTOR CONFORMING TO ASSE
 1010 SHALL BE INSTALLED. PER WPB FBC 107.2.1, ANY
 REQUIRED BACKFLOW DEVICE AND/OR WATER HAMMER ARRESTOR
 SHALL BE SPECIFIED AND SCHEDULED.
  
 13. PROVIDE NOTE REQUIRING INSULATION OF HOT WATER PER
 FBC EC C404.4. REFER TO 20032 PALM BEACH INTERNATIONAL
 SC SPECS SECTION 22-07-00 FOR INSULATION SPECIFICATIONS
 (PROVIDED IN SUPPORTING DOCUMENTS)
  
 14. PROVIDE NOTE: "REFER TO 20032 PALM BEACH
 INTERNATIONAL SC SPECS DIVISION 22-PLUMBING FOR
 PLUMBING SPECIFICATIONS" (PROVIDED IN SUPPORTING
 DOCUMENTS)
  
 15.PER WPB FBC 107.2.1, SHOW (PLAN VIEW AND RISER
 DIAGRAM) HOW DISPOSAL OF WASTEWATER FROM THE MEDICAL
 GAS VACUUM PUMP RECEIVER TANK ON THE FIRST FLOOR WILL
 BE ACHIEVED; PROVIDE DETAIL. COMPLY WITH FBC PL
 CHAPTERS 7,8 AND 9. IF CONCRETE SLAB IS TO BE CUT AND
 REMOVED THEN PROVIDE A SLAB REPAIR DETAIL ON THE PLANS.
 SHOW THE WIDTH OF THE REPAIR, THE MINIMUM THICKNESS AND
 PSI OF THE CONCRETE TO BE REPLACED. SHOW SIZE, LENGTH,
 SPACING (ON CENTER), MINIMUM EMBEDMENT AND
 ANCHORING/ADHESIVE MATERIAL FOR DOWELS. THE REPAIR
 SHALL ALSO INCLUDE TERMITE TREATMENT OF THE SOIL AS
 WELL AS THE REQUIRED VAPOR BARRIER OVER WELL COMPACTED
 SOIL. A COPY OF THE TERMITE CERTIFICATE SHALL BE ONSITE
 FOR FINAL INSPECTION.
  
 16. REFER TO 20032 PALM BEACH INTERNATIONAL SC SPECS
 DIVISION 22-PLUMBING SECTION 22-11-16 (B) ALLOWS WATER
 PIPE ABOVE GRADE TO BE ASTM A53 GALVANIZED PIPE WITH
 GROOVED COUPLINGS OR COPPER PRESS FITTINGS BY VIEGA. A)
 IS IT YOUR INTENT TO ALLOW GALVANIZED PIPE AND FITTINGS
 IN THE POTABLE WATER SYSTEM? B) PLEASE CLARIFY THE
 OPTION FOR COPPER PRESS FITTINGS IN A GALVANIZED
 SYSTEM.
  
 17.PER WPB FBC 107.2.1, PROVIDE MATERIAL SPECIFICATION
 FOR CLEAR WASTEWATER AND FOR THE COMPRESSED AIR SYSTEM.
  
  
  
 END OF COMMENTS.
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
 ALL PLANS TO BE SIGNED AND SEALED/DIGITALLY SIGNED AND
 SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS.
  
  
 JERALD SMITH
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
 EMAIL [email protected]
 PHONE 561-246-0882 MOBILE
  
 20090500 5325 GREENWOOD AVE
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved