| Plan Review Notes For Permit 20090421 |
| Permit Number |
20090421 |
|
| Review Stop |
SIGNATURE |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-10-05 12:45:02 | ELECTRONICALLY SUBMITTED DRAWINGS ARE REQUIRED TO HAVE | | | THE ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS | | | REQUIRED TO BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER | | | FACSIMILES OF THE SIGNATURE ARE ACCEPTABLE. FS 471 & | | | 61G15 | | | VERIFIED CONTRACTORS SIGNATURE ON LOAD CALC'S AND | | | ELECTRIC RISER. CT |
|