| Date |
Text |
| 2020-09-10 14:38:23 | 09/10/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. ON GENERAL NOTES PLEASE DELETE ANYTHING THAT DOES |
| | NOT PERTAIN TO THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | 2. ON GENERAL NOTES IT REFERS TO THE 2014 PLUMBING CODE |
| | A 5TH EDITION, PLEASE CHANGE TO CURRENT CODE OF THE |
| | 2017 FBC PLUMBING 6TH EDITION PER THE WPB AMENDMENTS TO |
| | THE FBC SEC.107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | 3. ON GENERAL NOTES PLEASE NOTE THAT SHOWER VALVE SHALL |
| | COMPLY WITH THE 2017 FBC SEC. P 424.3. INDIVIDUAL |
| | SHOWER VALVES SHALL BE BALANCED-PRESSURE, THERMOSTATIC |
| | OR COMBINATION BALANCED-PRESSURE/THERMOSTATIC VALVES |
| | THAT CONFORM TO THE REQUIREMENTS OF ASSE 1016/ASME |
| | A112.1016/CSA B125.16 OR ASME A112.18.1/CSA B125.1. |
| | |
| | 4. ALL INFORMATION, DRAWINGS, SPECIFICATIONS, AND |
| | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF |
| | THE PERSON RESPONSIBLE FOR THE DESIGN PER THE WPB |
| | AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |