| 2020-09-14 17:15:58 | 1ST REVIEW FBC-2017 RES. FUEL GAS |
| | PERMIT- 20090061 |
| | 9/14/2020 |
| | |
| | CODES IN EFFECT: |
| | FBC RES- FLORIDA RESIDENTIAL BUILDING CODE SIXTH |
| | EDITION 2017 |
| | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) THE GAS RISER DRAWING AND SURVEY INDICATE AN |
| | EXISTING 500-GALLON LP TANK. I HAVE RESEARCHED THE |
| | BUILDING DEPARTMENT RECORDS AND I CANNOT LOCATE A |
| | PERMIT OR PLANS FOR THE TANK. AT THIS TIME THE TANK |
| | WILL BE REVIEWED AS A NEW INSTALLATION PENDING EVIDENCE |
| | IS PROVIDED TO INDICATE IT WAS PERMITTED AND INSPECTED |
| | BY THE WPB BUILDING DEPARTMENT- SECTION 1005.1 & |
| | 107.2.1 WPB AMENDMENTS TO THE FBC-17. |
| | |
| | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE LP TANK |
| | SHOWING THE TANK MEETS THE CURRENT TESTING, LISTING AND |
| | COMPLIANCE STANDARDS IN ACCORDANCE WITH SECTION 5.2.1.1 |
| | NFPA 58. |
| | |
| | 3) PROVIDE A SURVEY DRAWING MARKED UP TO SHOW THE |
| | REQUIRED 10 FT. UG TANK CLEARANCE DISTANCES TO THE |
| | HOUSE AND ADJACENT PROPERTY LINES- TABLE 6.3.1.1 NFPA |
| | 58. PLEASE NOTE THAT IF THE TANK IS LESS THAN 10 FT. |
| | FROM THE DRIVEWAY, THE SHELL FOR THE TANK SHALL BE 18 |
| | IN. BELOW GRADE OR VEHICULAR BARRIER PROTECTION WILL BE |
| | REQUIRED- SECTIONS 6.6.6.1 (A). (PLEASE NOTE THE |
| | SUBMITTED SURVEY COPY FOR A RESIDENCE ON SOUTHWICK WAY |
| | APPEARS TO BE SUBMITTED IN ERROR.) |
| | |
| | 4) THE GAS RISER DRAWING SHOWS AN INCOMPLETE ANCHORING |
| | DETAIL FOR THE TANK. PLEASE PROVIDE ENGINEERING FOR |
| | ANCHORING THE TANK TO PREVENT FLOTATION, COLLAPSE, OR |
| | LATERAL MOVEMENT- SECTION 6.6.1.6 NFPA 58. INCLUDE A |
| | FRONT AND SIDE ELEVATION VIEW THAT SHOWS THE BURIAL |
| | DEPTH, TYPES, SIZES, AND NUMBERS OF ANCHORS, CABLES OR |
| | STRAPS. |
| | |
| | 5) THE TANK SHALL BE PROTECTED AGAINST CORROSION BY |
| | INSTALLATION OF A CATHODIC PROTECTION SYSTEM CONSISTING |
| | OF A SACRIFICIAL ANODE OR AN IMPRESSED CURRENT ANODE |
| | PER SECTIONS 5.2.1.11 & 6.6.6.1(I) NFPA 58. INDICATE |
| | THE TYPE OF PROTECTION AND HOW IT WILL BE TESTED- |
| | SECTION 6.17.1 NFPA 58. |
| | |
| | 6) GAS ISOMETRIC DRAWING: |
| | A) INDICATE THE PE PIPE SIZING TABLE ON THE DRAWING- |
| | SEE TABLES G2413.4(1)- G2413.4(8) FBC RES. |
| | B) INDICATE THE MAKES AND MODELS OF THE REGULATORS ON |
| | THE DRAWING AND SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | MARKED UP TO SHOW THE INLET AND OUTLET SIZES AND |
| | PRESSURES, AND ORIFICE SIZES- SECTION G2421.1 & G2421.2 |
| | FBC RES. |
| | C) SHOW THE SHUTOFF VALVE FOR THE GAS SUPPLY TO THE |
| | GENERATOR, AND THE REQUIRED PIPE UNION AT THE |
| | REGULATOR- SECTIONS G2420.4, G2420.5, AND G2421.2(7). |
| | D) SUBMIT MANUFACTURER'S SPECS FOR THE GENERATOR FLEX |
| | CONNECTOR THAT INDICATE MANUFACTURER AND MODEL, LISTING |
| | STANDARDS, AND INSTALLATION GUIDELINES- SECTION |
| | G2415.1. |
| | E) INDICATE A TRACER WIRE WILL BE INSTALLED ADJACENT TO |
| | THE UG PE PIPING- SECTION G2415.17.3 |
| | F) INDICATE HOW THE PE PIPING RISER WILL CONNECT TO THE |
| | FLEX CONNECTOR OR METALLIC PIPE PER SECTIONS G2415.17.1 |
| | & G2415.17.2. PLEASE NOTE THAT SPECS FOR ANODELESS |
| | RISERS AND PE/METALLIC PIPE CONNECTORS SHALL BE LISTED |
| | AND LABELED. |
| | G) SHOW THE LOCATION OF THE DRIP LEG- SECTION G2419.2 |
| | FBC RES. |
| | |
| | 7) AS NOTED ABOVE AN INCORRECT SURVEY DRAWING HAS BEEN |
| | SUBMITTED. PLEASE PROVIDE THE LOCATION OF THE GENERATOR |
| | ON THE RE-SUBMITTED SURVEY WITH CLEARANCE DISTANCES TO |
| | THE BUILDING, OPERABLE OPENINGS INTO THE BUILDING, AND |
| | THE ADJACENT PROPERTY LINES- SECTION 107.2.1 WPB. |
| | PLEASE ALSO SUBMIT INSTALLATION GUIDELINES FROM GENERAC |
| | TO VERIFY THE LOCATION CLEARANCES FOR THE GENERATOR AS |
| | SHOWN ON THE SURVEY. |
| | |
| | 8) PLEASE PROVIDE A TITLE BLOCK WITH THE SIGNATURE ON |
| | THE DRAWING TO CLEARLY INDICATE THE LICENSED CONTRACTOR |
| | OR QUALIFIERS NAME AND LICENSE NUMBER- SECTION 107.2.1 |
| | WPB. |
| | |
| | 9) A SUB-PERMIT FOR THE LP TANK AND GAS PIPING |
| | INSTALLATIONS IS REQUIRED- SECTION 105.1 WPB. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |