| Date |
Text |
| 2020-08-26 11:03:07 | 08/26/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | |
| | 1. ON SHEET A-6 PLEASE PROVIDE A SOURCE AND LOCATION OF |
| | HOT WATER PER THE 2017 RES R 2722.2 HOT WATER. |
| | |
| | 2. ON SHEET A-6 PLUMBING ISOMETRIC BETWEEN THE SHOWER |
| | AND TOILET NEED TO HAVE VENT AND YOU MAY USE THE LAV |
| | PER THE 2017 FBC SEC. REC R 3101.2. |
| | |
| | 3. ON SHEET A-6 THERE IS AN ARROW FOR DIRECTION OF |
| | FLOW, AND IT IS SHOWING A 2" LINE BETWEEN TWO 3" |
| | CONNECTIONS, PLEASE SHOW THE FLOW TO CITY LATERAL AND |
| | SHOW CLEAN OUT OUTSIDE BUILDING ALONG WITH DESTINATION |
| | OF PIPE FORM OR TO SEWER. IF YOU HAVE THE MAIN HOUSE IN |
| | FRONT, PLEASE LABEL ACCORDINGLY PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 107.2.1.4 QUALITY OF BUILDING PLANS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |