| 2020-10-01 10:38:11 | 010/01/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. A SUB PLUMBING PERMIT IS REQUIRED BY A LICENSED |
| | CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS |
| | TO THE FBC SEC. 105.1. |
| | |
| | 2. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM |
| | ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN |
| | DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER |
| | ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 |
| | EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE |
| | (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE |
| | DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE |
| | SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH |
| | CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS |
| | INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES, |
| | HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS |
| | EXCEPT THE PUMP. |
| | |
| | 3. SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. |
| | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC |
| | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS |
| | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH |
| | CALCULATIONS PER THE ANSI/APSP/ICC 7 - 2013 SECS. |
| | 4.4.9, 4.4.9.1. |
| | |
| | 4. HEATED SWIMMING POOLS AND INGROUND PERMANENTLY |
| | INSTALLED SPAS SHALL BE EQUIPPED WITH A VAPOR-RETARDANT |
| | COVER ON OR AT THE WATER SURFACE OR A LIQUID COVER OR |
| | OTHER MEANS PROVEN TO REDUCE HEAT LOSS PER THE 2017 |
| | FBC- ENERGY- SEC. R 403.10.3. |
| | |
| | 5. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE POOL |
| | HEATER, FOR THE CARTRIDGE FILTER AND THE PUMP PER THE |
| | WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | 6. THE POOL HEATER SHALL HAVE A MINIMUM THERMAL |
| | EFFICIENCY OF 82% PER THE 2017 FBC-ENERGY SEC. |
| | R403.10.4. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |