| 2020-10-23 11:00:24 | 1) THE DESIGN PROFESSIONAL IS REQUIRED TO DESIGNATE TO |
| | WHICH DESIGN SPECIFICATION ( A OR B) OF THE FAIR |
| | HOUSING ACT THE UNIT BATHROOMS WERE DESIGNED. IF |
| | SPECIFICATION A IS SELECTED AS THE BASIS FOR DESIGNING |
| | A BATHROOM, ALL BATHROOMS IN THE DWELLING UNIT ALSO |
| | MUST COMPLY WITH THE A SPECIFICATION. IF SPECIFICATION |
| | B IS SELECTED, ONLY ONE BATHROOM IN THE DWELLING UNIT |
| | MUST MEET THOSE REQUIREMENTS. I COULD NOT FIND THIS |
| | INFORMATION ANYWHERE ON THE ARCHITECTURAL OR PLUMBING |
| | SHEETS. 2ND REQUEST. |
| | 2) INDICATE ON THE PLANS WHICH DESIGN STANDARD IS BEING |
| | USED FOR FAIR HOUSING ACT DESIGN COMPLIANCE. SHT. |
| | A-6.09 REFERS TO THE FAIR HOUSING ACT DESIGN MANUAL |
| | 1998 BUT SHTS. A-6.10 AND A-8.00B REFER TO THE 1991 |
| | FAIR HOUSING ACCESSIBILITY GUIDELINES. WHICH IS IT? |
| | CLARIFY. |
| | 3) THE MEP RESPONSE NARRATIVE REFERS TO SHT. P-4.00. |
| | THERE IS NO SUCH DRAWING IN THE PLANS. IT APPEARS TO |
| | HAVE BEEN CHANGED TO P4.01. CLARIIFY. |
| | 4) THE RESPONSE NARRATIVE PLAN REVIEW COMMENT #11 |
| | REFERS TO DETAIL #3 FOR SINK/COUNTER ELEVATION FOR SINK |
| | AT THE POOL DECK. THERE IS NO DETAIL #3 ON SHT. A-5.07. |
| | CLARIFY. |
| | 5) THE RESPONSE NARRATIVE FOR PLAN REVIEW COMMENT #13 |
| | REFERS TO ELEVATIONS #13 & #14 ON SHT. A-5.05. THERE |
| | ARE NO SUCH ELEVVATIONS ON THIS SHEET. CLARIFY. |
| | 6) SHT. A-2.00 - CLARIFY HOW PEOPLE IN THE GYM WILL |
| | HAVE UNRESTRICTED ACESS TO DRINKING FOUNTAINS IN THE |
| | YOGA AREA IN THE EVENT OF YOGA CLASSES. |
| | 7)SHT.A-5.03 - DETAIL #4 - THERE SHALL BE A MINIMUM |
| | REQUIRED DEPTH OF 8 INCHES FOR KNEE CLEARANCE UNDER THE |
| | SINK AT 27 INCHES ABOVE THE FINISH FLOOR. ANSI |
| | A117.1-1986. |
| | 8) SHT. A-5.04 - DETAILS #1 & #3 - LAVATORIES SHALL BE |
| | MOUNTED WITH A CLEARANCE OF AT LEAST 29 INCHES FROM THE |
| | FLOOR TO THE BOTTOM OF OF THE APRON PER ANSI |
| | A117.1-1986 . KNEE AND TOE CLEARANCES SHALL COMPLY WITH |
| | FIGURE 31 OF THE STANDARD. |
| | 9) SHT. A-5.04 - DETAILS #2 & #3 - THE GRAB BARS ARE |
| | STILLL SHOWING THE MEASUREMENT TO THE CENTERLINE OF THE |
| | BAR AND NOT TO THE TOP OF THE GRIPPING SURFACE. |
| | CLARIFY.. |
| | 10) SHT. A-5.05 - DETAILS #1, 2,3,4,5,8,9,10,11, &12 - |
| | THE GRAB BARS ARE ALL SHOWN MESURED TO THE CENTERLINE |
| | OF THE BAR AND NOT TO THE TOP OF THE GRIPPING SURFACE. |
| | CLARIFY. |
| | 11) SHT. A-5.06 - DETAIL #8 - THERE SHALL BE A MINIMUM |
| | REQUIRED DEPTH OF 8 INCHES FOR KNEE CLEARANCE UNDER THE |
| | SINK AT 27 INCHES ABOVE THE FINISH FLOOR. ANSI |
| | A117.1-1986. |
| | 12) SHT. A-6.04 - DETAIL C - SHOW THE REQUIRED 30 |
| | INCHES WIDE BY 48 INCHES DEEP CLEAR FLOOR SPACE OUTSIDE |
| | THE SWING OF THE DOOR PERR THE FAIR HOUSING ACT |
| | GUIDELINES/ DESIGN MANUAL. |
| | 13) SHT. A-8.00A - COMMON AREAS FINISH SCHEDULE - SHOWS |
| | THE WALLS IN THE 3RD FLOOR RESTROOMS TO BE GYPSUM BOARD |
| | WITH WALL PAPER FINISH.WALLS AND PARTITIONS WITHIN TWO |
| | FEET OF WATER CLOSETS SHALL HAVE A SMOOTH, HARD, |
| | NONABSORBENT SURFACE, TO A HEIGHT OF NOT LES THAN 4 |
| | FEET ABOVE THE FLOOR AND THE MATERIALS USED IN SUCH |
| | WALLS SHALLL BE OF A TYPE THAT IS NOT ADVERSELY |
| | AFFECTED BY MOISTURE. EPOXY PAINT DOES NOT MEET THIS |
| | REQUIREMENT.FBC-BUILDING SEC. 1210.2.2. |
| | 14) - SHT. A-9.02 - DETAIL #9 REFERS TO DETAIL |
| | #12/A-9.02 - THERE IS NO DETAIL #12 ON THIS SHEET. |
| | CLARIFY. |
| | 15) PLACE A NOTE ON THE PLANS THAT THE WASHING MACHINE |
| | SHUTOFF VALVES ARE ACCESSIBLE THROUGH A REMOVABLE PANEL |
| | ON THE WASHER/DRYER APPLIANCE . FBC-PLUMBING SEC. |
| | P606.3. |
| | 16) SHT. P-1.00 - SHOW THE CONTINUATION POINT/ |
| | ORIGINATION POINT OF THE FUTURE 1 1/4 INCH CONDENSATE |
| | DRAIN STUB OUT AT THE FUTURE RETAIL SPACE. THERE IS |
| | ANOTHER LINE NEXT TO THIS CONDENSATE LIINE THAT IS NOT |
| | IDENTIFIED OR SHOWS A PIPE SIZE. REFER TO COLUMN LINES |
| | A-B/3-4. |
| | 17) SHT. P-1.00 - SHOW THE ONTINUATION POINT/ |
| | ORIGINATION POINT OF THE 3 INCH CONDENSATE LINE |
| | DISCHARGING TO THE MANHOLE LOCATED AT COLUMN G//2-3.. |
| | 18) SHT. P-1.00 - SHOW THE CONTINUATION POINT OF THE 10 |
| | INCH STORM DRAIN AND THE 1 1/4 INCH CONDENSATE LINE AT |
| | GRID LINE D-E/15. |
| | 19) SHT.P-1.00- SIZE THE STORM, SANITARY, WATER LINES |
| | ON THE PLANS. PIPE SIZES ARE MISSING IN QUITE A FEW |
| | AREAS. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 20) SHT. P-1.01 - THERE ARE SANITARY RISER TAGS LOCATED |
| | AT COLUMNS D/2 WITH NO RISERS IDENTIED OR LOCATION |
| | ARROWS. REFER TO RISERS S/2, S/4, &S/6. CLARIFY. |
| | 21) SHT. P-1.01 - THERE ARE RAINWATER AND OVERFLOW |
| | DRAIN RISER TAGS AT COLUMN LINES D/3-4 WITH NO RISERS |
| | SHOWN AND NO LOCATION ARROWS.ALSO, REFER TO COLUMN LINE |
| | C-D/5-6, C-D/9-10, C-D/7-8 FOR THE SAME ISSUE. CLARIFY. |
| | 22) SHT. P-1.04 - THERE IS A RISER TAG OF RWL/5 LOCATED |
| | IN THE CORRIDOR AT COLUMNS D/7-8 BUT NO RISER IS SHOWN. |
| | THIS ALSO OCCURS IN UNIT C-2 IN THE HALL FOR RISER |
| | ODL/2. THE RWL/5 ISSUE ALSO OCCURS ON SHT.P-1.06. |
| | CLARIFY. |
| | 23) P2.00 - UNIT B-1A - THERE IS A RISER TAG S/1C SHOWN |
| | AT THE STOVE AND THERE IS NO RISER. CLARIFY. |
| | 24) SHT.P-1.03 - RISER TAGS ODL/3, RWL/3, S/2, ARE |
| | SHOWN IN THE CORRIDOR BUT THERE ARE NO CORRELATING |
| | RISERS SHOWN. CLARIFY. |
| | 25) SHT. P-1.04 - RISER TAG RWL/5 IS SHOWN IN THE |
| | CORRIDOR BUT THERE IS NO CORRELATING RISER SHOWN. |
| | CLARIFY. |
| | 26) SHT. P-1.05 - UNIT C-1A ACC. - RISER TAG RWL/1 IS |
| | SHOWN IN CORRIDOR BUT THERE IS NO CORRELATING RISER. |
| | CLARIFY. |
| | 27) SHT.P-1.07 - THERE IS A RISER TAG OF RWL/5 LOCATED |
| | IN THE CORRIDOR AT COLUMNS D/7-8 BUT NO RISER IS SHOWN. |
| | CLARIFY. |
| | 28) SHT.P-3.01 - UNIT B-1 - A SHUTOFF VALVE IS REQUIRED |
| | ON THE WATEER SUPPLY TO THE UNIT PER FBC-PLUMBING |
| | SEC.606.1.6. |
| | 29) SHT. P-3.01- UNIT B-1A - A SHUTOFF VALVE IS |
| | REQUIRED ON THE WATEER SUPPLY TO THE UNIT PER |
| | FBC-PLUMBING SEC.606.1.6. |
| | 30) SHT.P-3.02 - IDENTIFY THE PARTIAL GROUND FLOOR |
| | SANITARY PLAN AS THE OFFICE/ LOBBY AREA TO CORRELATE |
| | WITH SHT. P-2.02. WPB AMEND. O FBC SEC. 107.2.1. |
| | 31) SHT. P-3.02 - THE BACKFLOW PREVENTION DEVICE AT THE |
| | POOL COLLECTOR TANK SHALL BE A REDUCED PRESSURE ZONE |
| | VALVE AND BE LEAD FREE. THE UNIT YOU HAVE SPECIFIED ON |
| | THE DRAWING IS A DOUBLE CHECK ASSEMBLY AND IS |
| | UNACCEPTABLE.FBC-PLUMBING TABLE 608.1.THE DEVICE SHALL |
| | COMPLY WITH ASSE 1013. |
| | 32) SHT.P-3.04 - PLACE THE SLOPE OF THE HORIZONTAL |
| | STORM DRAIN PIPING ON THE PLAN. COMPLY WITH |
| | FBC-PLUMBING ABLE 1106.2. |
| | 33) SHT. P-3.06 - SIZE ALL SECTIONS OF THE SANITARY |
| | COLLECTION SYSTEM. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 34) SHT. P-4.01 - FIXTURE CONNECTION SCHEDULE NOTE #1 |
| | REFERS TO MIAMI-DADE CODE SECTION 8-31. DELETE THIS |
| | REFERENCE FROM THE NOTE. |
| | 35) SHT. P-4.01- WATER HEATER DETAIL - SHOW THE SIZE OF |
| | THE EXPANSION TANK ON THE PLAN. |
| | 36) SHT. P-4.01- TRASH CHUTE DETAIL- THE BACKFLOW |
| | DEVICE MUST BE LEAD FREE AND SHALL BE RELOCATED |
| | UPSTREAM OF THE SANITATION UNIT. AS PRESENTLY LOCATED, |
| | IT DOES NOT PROTECT THE BUILDING'S WATER SYSTEM. |
| | 37) SUBMIT A COMPLETE WATER RISER FOR THE BUILDING. WPB |
| | AMEND. TO FBC SEC. 107.3.5.1.3. |
| | 38) THE SUBMETERS SHALL BE NON COMBUSTIBLE IF LOCATED |
| | IN A RETURN AIR CLOSET AS IT APPEARS THEY ARE. THE |
| | SUBMITTED SPECS FOR THE METER DOES NOT SHOW THIS. HESE |
| | METERS ARE COMPOSED OF A POLYMER MATERIAL. RAPPING THE |
| | SUBMETERS WITH A FIRE WRAP IS NOT AN OPTION. |
| | 39) SUBMIT ADDITIONAL INFORMATION/DETAILS ON THE |
| | BOOSTER PUMP. THE DETAIL ON SHT. P-4.01 IS VERY |
| | MINIMAL. WPB AMEND. TO FBC SEC. 107.2.1.2ND REQUEST. |
| | 40) THE BACKFLOW PREVENTER FOR THE REFRIGERATOR DOES |
| | NOT COMPLY WITH THE ASSE 1022 STANDARD. ALL BACKFLOWS |
| | SHALL BE LEAD FREE. FBC-PLUMBING SEC.605.21. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |