| 2020-08-07 10:42:40 | THE PROPOSED DEMOLITION IS TO COMPLY WITH THE |
| | SAFEGAURDS OUTLINNED IN NFPA 241, TO INCLUDE, BUT IS |
| | NOT LIMITED TO: |
| | |
| | 5.1 HOT WORK. |
| | 5.1.1* RESPONSIBILITY FOR HOT WORK OPERATIONS AND FIRE |
| | PREVENTION |
| | PRECAUTIONS, INCLUDING PERMITS AND FIRE WATCHES, SHALL |
| | BE |
| | IN ACCORDANCE WITH NFPA 51B, STANDARD FOR FIRE |
| | PREVENTION DURING |
| | WELDING, CUTTING, AND OTHER HOT WORK, EXCEPT AS |
| | MODIFIED IN |
| | CHAPTER 9. |
| | 5.1.2 GAS-OPERATED CUTTING AND WELDING EQUIPMENT USING |
| | MULTIPLE OXYGEN AND FUEL GAS CYLINDERS SHALL BE IN |
| | ACCORDANCE |
| | WITH NFPA 51, STANDARD FOR THE DESIGN AND INSTALLATION |
| | OF OXYGEN? |
| | FUEL GAS SYSTEMS FOR WELDING, CUTTING, AND ALLIED |
| | PROCESSES. |
| | |
| | 5.1.3.2 A FIRE WATCH SHALL BE POSTED FOR THE DURATION |
| | OF THE |
| | WORK AND FOR 2 HOURS THEREAFTER FOR TORCH-APPLIED |
| | ROOFING OPERATIONS |
| | (SEE 9.3.9). |
| | |
| | 6.1 ELECTRICAL. |
| | 6.1.1 ALL CONSTRUCTION-OPERATION ELECTRICAL WIRING AND |
| | EQUIPMENT |
| | FOR LIGHT, HEAT, OR POWER PURPOSES SHALL BE IN |
| | ACCORDANCE |
| | WITH THE APPLICABLE PROVISIONS OF NFPA 70, NATIONAL |
| | ELECTRICAL CODE. |
| | |
| | 6.1.1.3 DAMAGED EQUIPMENT AND CORDS SHALL BE REMOVED |
| | FROM SERVICE UNTIL RENDERED SAFE. |
| | |
| | 7.2 OWNER?S RESPONSIBILITY FOR FIRE PROTECTION. |
| | 7.2.1* THE OWNER SHALL DESIGNATE A PERSON WHO SHALL BE |
| | RESPONSIBLE |
| | FOR THE FIRE PREVENTION PROGRAM AND WHO SHALL ENSURE |
| | THAT IT IS CARRIED OUT TO COMPLETION. |
| | 7.2.1.1 THE FIRE PREVENTION PROGRAM MANAGER SHALL HAVE |
| | THE |
| | AUTHORITY TO ENFORCE THE PROVISIONS OF THIS AND OTHER |
| | APPLICABLE |
| | FIRE PROTECTION STANDARDS. |
| | |
| | 7.5.8 HYDRANTS. |
| | 7.5.8.1 FREE ACCESS FROM THE STREET TO FIRE HYDRANTS |
| | AND TO |
| | OUTSIDE CONNECTIONS FOR STANDPIPES, SPRINKLERS, OR |
| | OTHER FIRE |
| | EXTINGUISHING EQUIPMENT, WHETHER PERMANENT OR |
| | TEMPORARY, |
| | SHALL BE PROVIDED AND MAINTAINED AT ALL TIMES. |
| | 7.5.8.2 PROTECTIVE PEDESTRIAN WALKWAYS SHALL NOT BE |
| | CONSTRUCTED |
| | SO THAT THEY IMPEDE ACCESS TO HYDRANTS. |
| | 7.5.8.3 NO MATERIAL OR CONSTRUCTION SHALL INTERFERE |
| | WITH ACCESS TO |
| | HYDRANTS, SIAMESE CONNECTIONS, OR FIRE EXTINGUISHING |
| | EQUIPMENT. |
| | |
| | 7.5.5.2 ACCESS FOR USE OF FIRE DEPARTMENT APPARATUS |
| | SHALL BE |
| | PROVIDED TO THE IMMEDIATE JOB SITE AT THE START OF THE |
| | PROJECT |
| | AND MAINTAINED UNTIL COMPLETION. |
| | |
| | CHAPTER 10 SAFEGUARDING DEMOLITION OPERATIONS |
| | 10.1 GENERAL. IN ADDITION TO THE SPECIFIC REQUIREMENTS |
| | OF THIS |
| | CHAPTER, THE PROVISIONS OF CHAPTER 1 AND CHAPTERS 3 |
| | THROUGH 7 |
| | SHALL BE FOLLOWED, AS APPLICABLE, FOR ALL DEMOLITION |
| | OPERATIONS |
| | |
| | 10.6 UTILITIES. |
| | 10.6.1 ELECTRICAL SERVICE. ELECTRICAL SERVICE SHALL BE |
| | REDUCED TO |
| | A MINIMUM, AND THE IDENTITY OF ENERGIZED CIRCUITS SHALL |
| | BE |
| | ENSURED TO AVOID ANY UNCERTAINTY. |
| | 10.6.2 GAS. |
| | 10.6.2.1 PRIOR TO DEMOLITION, GAS SUPPLIES SHALL BE |
| | TURNED OFF |
| | AND CAPPED AT A POINT OUTSIDE THE BUILDING. |
| | 10.6.2.2 GAS LINES WITHIN THE BUILDING SHALL BE PURGED |
| | AFTER |
| | CAPPING UNLESS OTHERWISE PERMITTED BY THE AUTHORITY |
| | HAVING |
| | JURISDICTION. |
| | |
| | PLEASE ENSURE FIRE AND LIFE SAFETY WITH COMPLIANCE OF |
| | THE CODE |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |