| 2020-08-11 13:47:57 | 1. PER PUBLIC UTILITIES AND ENGINEERING, THERE IS A 12 |
| | INCH WATER MAIN ALONG THE WEST SIDE OF S FLAGLER RIGHT |
| | OF WAY. ONCE THE ACTUAL LINE IS LOCATED, THERE IS A |
| | REQUIREMENT FOR ROOT BARRIER 5 FEET FROM THE PIPE |
| | BEFORE ANY TREES OR PALMS COULD BE PLANTED. THIS DOES |
| | NOT APPEAR POSSIBLE WITH THE SPACE AVAILABLE BETWEEN |
| | THE CURB AND SIDEWALK. |
| | |
| | 2. THERE ARE FOUR EXISTING BLACK OLIVE STREET TREES IN |
| | THE PARKWAY ON FOREST HILL BLVD. IF THE INTENT IS TO |
| | REMOVE THEM, SHOW DIAMETER OF EACH TREE CANOPY ON THE |
| | PLAN AND CALCULATE THE CANOPY SQUARE FOOTAGE. SHOW |
| | REPLACEMENT CATEGORY 1 SHADE TREES CONSISTENT WITH THE |
| | OTHER SHADE TREES ON THE STREET. |
| | |
| | 3. PROVIDE A SEPARATE PLANT LIST FOR THE RIGHT OF WAY |
| | LANDSCAPING. |
| | |
| | 4. SHOW THE SAFE SIGHT TRIANGLE ON THE PLAN WITHIN THE |
| | PROPERTY LINE AND CONTINUE THE LINES OUT INTO THE RIGHT |
| | OF WAY TO THE CURB. SECTION 94-305 (E) VISIBILITY AT |
| | INTERSECTIONS APPLIES. |
| | |
| | 5. SUPPLY DETAILS FOR THE PAVED AREAS SHOWN ON THE PLAN |
| | BETWEEN THE SIDEWALK AND THE CURB, INCLUDE MATERIALS |
| | AND CONSTRUCTION. THIS MAY NEED TO BE SUBMITTED AS A |
| | REVISION TO THE DRIVEWAY PERMIT FOR RIGHT OF WAY |
| | CONSTRUCTION. |
| | |
| | 6. ANY LANDSCAPING BESIDES GROUNDCOVER MUST BE |
| | MAINTAINED BY THE ADJACENT PROPERTY OWNER AND WILL |
| | REQUIRE A SIGNED MAINTENANCE AGREEMENT. THIS IS A ONE |
| | PAGE SIMPLIFIED FORM. |
| 2020-08-06 14:28:43 | SENT TO ENGINEERING FOR UTILITY CONFLICT REVIEW. |