| Date |
Text |
| 2020-09-21 13:29:41 | |
| | 2ND REVIEW FBC-2017 PLUMBING |
| | PERMIT- 2008054 |
| | 9/21/2020 |
| | |
| | CODES IN EFFECT: |
| | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017 |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | COMMENTS LISTED BELOW FROM THE IST REVIEW HAVE NOT BEEN |
| | COMPLETELY ADDRESSED. COMMENT NOTES IN CAP LETTERS HAVE |
| | BEEN ADDED. |
| | |
| | 1) SHEET G-002: THE PLUMBING FIXTURE CALCULATION IS NOT |
| | IN COMPLIANCE WITH TABLE 403.3 FBC P. PLEASE REVISE THE |
| | CALCULATIONS IN ACCORDANCE WITH THE TABLE AND NOTE THAT |
| | THE CALCULATIONS ARE "NOT FOR REFERENCE ONLY", THEY |
| | SHALL BE SPECIFIC TO THE NEW TENANT OCCUPANCY AND SHALL |
| | CORRELATE WITH THE TOTAL OCCUPANT LOAD OF THE SPACE, |
| | AND INCLUDE THE OUTDOOR SEATING LOAD. A) MISSING FROM |
| | THE CALCULATION FOR A2 OCCUPANCIES ARE THE REQUIRED |
| | SERVICE SINK AND DRINKING FOUNTAINS. A MINIMUM OF TWO |
| | DRINKING FOUNTAINS ARE REQUIRED- ONE HIGH AND ONE LOW- |
| | PER SECTION 410.3 WITH THE EXCEPTION OF RESTAURANTS |
| | THAT PROVIDE DRINKING WATER IN CONTAINERS FREE OF |
| | CHARGE- SECTION 410.4. NO NOTE OR STATEMENT HAS BEEN |
| | PROVIDED ON THE PLAN TO SHOW COMPLIANCE WITH THE |
| | EXCEPTION. PLEASE PROVIDE CORRECTIONS. 2ND REQUEST TO |
| | REVISE THE FIXTURE CALCULATION SCHEDULE, AND TO PROVIDE |
| | ACKNOWLEDGEMENT OR STATEMENT CONCERNING THE |
| | SUBSTITUTION OF DRINKING WATER IN CONTAINERS FREE OF |
| | CHARGE FOR THE REQUIRED DRINKING FOUNTAINS. |
| | |
| | 9) P-001: PIPING MATERIALS NOT IDENTIFIED- SECTION |
| | 303.1 FBC P. HOT WATER PIPING INSULATION MATERIAL, |
| | THICKNESS AND R-VALUE NOT IDENTIFIED- SECTION 607.5. |
| | REFER TO TABLE 605.4 AND PROVIDE IN THE PLAN NOTES THE |
| | TYPES OF POTABLE AND FILTERED WATER PIPING TO BE |
| | INSTALLED. REFER TO TABLE 702 & 702.1 AND PROVIDE IN |
| | THE PLAN NOTES THE TYPES AF DWV PIPINGS TO BE INSTALLED |
| | ABOVE AND BELOW THE SLAB. REFER TO SECTION C404.4 AND |
| | TABLE C403.3.10 FBC EC AND PROVIDE THE PIPING |
| | INSULATION INFO ON THE PLAN |
| | |
| | 10) P-112: ACKNOWLEDGED THAT THE GREASE INTERCEPTOR IS |
| | UNDER SEPARATE PERMIT BY LANDLORD, HOWEVER GREASE WASTE |
| | CALCULATIONS FOR THE NEW TENANT SPACE ARE REQUIRED PER |
| | SECTION 1003.3.1. INDICATE THE TYPE OF GREASE OF |
| | INTERCEPTOR TO BE INSTALLED- HYDROMECHANICAL OR GRAVITY |
| | TYPE- AND THE MAKE AND MODEL AND TESTING APPROVAL |
| | STANDARD OF THE INTERCEPTOR ON THE PLAN. REFER TO |
| | SECTION 1003.3.4 FOR HYDROMECHANICAL FOR APPROVED |
| | SIZING AND STANDARDS, AND 1003.3.6 FOR GRAVITY SIZING |
| | AND STANDARDS. PLEASE NOTE THAT A SOLIDS INTERCEPTOR IS |
| | REQUIRED IF A FOOD WASTE DISPOSER IS INSTALLED- SECTION |
| | 1003.3.2 FBC P. NO PERMIT OR PLANS HAVE BEEN SUBMITTED |
| | FOR THE GREASE INTERCEPTOR BY THE LANDLORD, AND IT WAS |
| | NOT PERMITTED UNDER THE MASTER #20050025. SHEET PS-901 |
| | OF THE MASTER PLAN INDICATES SIZING BY FUTURE TENANT. |
| | THE SIZING CALULATIONS ON SHEET P112 ARE NOT ACCEPTABLE |
| | PER SECTION 1003.3.6 WHICH REQUIRES SIZING IN |
| | ACCORDANCE WITH THE IAMPMO/ANSI Z1001 STANDARD. THE |
| | CALCULATIONS ARE ALSO INDICATED TO BE PER THE 2015 |
| | FLORIDA PLUMBING CODE WHICH DOES NOT EXIST. THE CURRENT |
| | PLANS SHALL BE DESIGNED IN ACCORDANCE WITH THE 2017 |
| | FLORIDA PLUMBING CODE. I HAVE INCLUDED THE ENTIRE CODE |
| | SECTION BELOW- PLEASE PROVIDE REVISED CALCULATIONS. |
| | COMPLETE PLANS AND SPECIFICATIONS FOR THE GREASE |
| | INTERCEPTIOR SHALL BE PROVIDED UNDER SEPARATE PERMIT- |
| | SECTIONS 105.1 & 107.2.1 WPB. |
| | |
| | 1003.3.6 GRAVITY GREASE INTERCEPTORS AND GRAVITY GREASE |
| | INTERCEPTORS WITH FATS, OILS, AND GREASES DISPOSAL |
| | SYSTEMS. |
| | THE REQUIRED CAPACITY OF GRAVITY GREASE INTERCEPTORS |
| | AND GRAVITY GREASE INTERCEPTORS WITH FATS, OILS, AND |
| | GREASES DISPOSAL SYSTEMS SHALL BE DETERMINED BY |
| | MULTIPLYING THE PEAK DRAIN FLOW INTO THE INTERCEPTOR IN |
| | GALLONS PER MINUTE BY A RETENTION TIME OF 30 MINUTES. |
| | GRAVITY GREASE INTERCEPTORS SHALL BE DESIGNED AND |
| | TESTED IN ACCORDANCE WITH IAPMO/ANSI Z1001. GRAVITY |
| | GREASE INTERCEPTORS WITH FATS, OILS, AND GREASES |
| | DISPOSAL SYSTEMS SHALL BE DESIGNED AND TESTED IN |
| | ACCORDANCE WITH ASME A112.14.6 AND IAPMO/ANSI Z1001. |
| | GRAVITY GREASE INTERCEPTORS AND GRAVITY GREASE |
| | INTERCEPTORS WITH FATS, OILS, AND GREASES DISPOSAL |
| | SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH |
| | MANUFACTURER'S INSTRUCTIONS. WHERE MANUFACTURER'S |
| | INSTRUCTIONS ARE NOT PROVIDED, GRAVITY GREASE |
| | INTERCEPTORS AND GRAVITY GREASE INTERCEPTORS WITH FATS, |
| | OILS, AND GREASES DISPOSAL SYSTEMS SHALL BE INSTALLED |
| | IN COMPLIANCE WITH ASME A112.14.6 AND IAPMO/ANSI Z1001. |
| | |
| | 12) P-601: PROVIDE A DEVICE SCHEDULE THAT INCLUDES THE |
| | MAKES, MODELS AND LISTING NUMBERS OF THE WATER HAMMER |
| | ARRESTORS, MIXING VALVES, AND BACKFLOW PREVENTERS- |
| | SECTIONS 604.9, 607.1.2, AND TABLE 608.1. NOT PROVIDED- |
| | 2ND REQUEST FOR THE INFORMATION TO BE PROVIDED ON THE |
| | PLANS. PLEASE ADD A PIPING DIAGRAM FOR THE MIXING |
| | VALVES AT THE LAVATORIES. |
| | |
| | 13) P-111 & P-501: THE DRAWINGS DO NOT SHOW THE |
| | FILTERED WATER SUPPLY LINE RUN TO THE ESPRESSO MACHINES |
| | AND HOW THE PIPE WILL BE PROTECTED FROM DAMAGE- SECTION |
| | 305.1 FBC P. PLEASE IDENTIFY THE TYPE OF FILTERED WATER |
| | PIPING- SECTION 303.1 FBC P. THE SECTION DRAWING ON |
| | P-501 SHOWS ONLY FILTERED WATER PIPING PENETRATING THE |
| | FLOOR SLAB, HOWEVER THE ISOMETRIC SHOWS BOTH FILTERED |
| | AND COLD WATER RUNNING UNDERSLAB TO THE ESPRESSO |
| | MACHINES. AS PREVIOUSLY REQUESTED, SHOW HOW THE PIPING |
| | IS BEING PROTECTED, AND REVISE THE FLAT LINE DRAWING ON |
| | P-111 TO SHOW THE WATER PIPING RUNS. |
| | |
| | SHEET P-501, DETAIL 5: THE ASSE 1024 STANDARD IS NOT |
| | APPLICABLE TO THE DOUBLE CHECK VALVE SPECIFIED FOR THE |
| | ESPRESSO MACHINES. IS THE INTENTION TO INSTALL A DUAL |
| | CHECK VALVE? SEE TABLE 608.1 FBC P. |
| | |
| | SHEET P-501, DETAIL 8: THERE IS A NOTE FOR A TEMPERED |
| | WATER LINE TO SINKS HOWEVER THERE IS ONLY A CW |
| | CONNECTION TO THE SYSTEM- PLEASE CLARIFY OR REMOVE THE |
| | NOTE. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |
| | |
| | |