| 2020-08-10 16:53:54 | 08/10/20 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | |
| | 1. THE OVERALL VALUE IS LOW PER THE WPB AMENDMENTS TO |
| | THE FBC 109.3 BUILDING PERMITS VALUATIONS. IF IN THE |
| | OPINION OF THE BUILDING OFFICIAL, THE CLAIMED VALUATION |
| | OF BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED UNLESS THE APPLICANT CAN SHOW DETAILED, QUANTITY |
| | ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS (EXCLUDING |
| | LAND VALUE) TO MEET THE APPROVAL OF THE BUILDING |
| | OFFICIAL. FOR PERMITTING PURPOSES, THE VALUATION OF |
| | BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE |
| | TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, |
| | INTERIOR FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND |
| | DESIGN FEES, MARKETING COSTS, OVERHEAD AND PROFIT; |
| | EXCLUDING ONLY LAND VALUE. VALUATION REFERENCES MAY |
| | INCLUDE THE LATEST PUBLISHED DATA OF NATIONAL |
| | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, |
| | MEANS, ETC.), AS PUBLISHED BY INTERNATIONAL CODE |
| | CONGRESS. FINAL BUILDING PERMIT VALUATION SHALL BE SET |
| | BY THE BUILDING OFFICIAL. |
| | |
| | 2. PLUMBING RISER DIAGRAM REQUIRED PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.3.5.3 (11) RESIDENTIAL |
| | PLUMBING. |
| | |
| | 3. CLEAN OUT REQUIRED EVERY TIME YOU ENTER THE BUILDING |
| | PLEASE SHOW A CLEAN OUT ON THE WASHING MACHINE DRAIN |
| | LINE PER THE 2017 FBC SEC. R3005.2.3. |
| | |
| | 4. WASHING MACHINE DRAINAGE LINE PER MOST MANUFACTURES |
| | SPECIFICATION SHALL BE 3" DUE TO THE PUMP DISCHARGE |
| | VOLUME, PLEASE SHOW AS SO ON ISOMETRIC PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.3.5.3 (11) RESIDENTIAL |
| | PLUMBING. |
| | |
| | 5. WATER LINE OUTSIDE CONDITION SPACE SHALL BE |
| | INSULATED WITH AN R-3 MINIMUM PER THE 2017 FBC RE SEC. |
| | 403.5.3. |
| | |
| | 6. WATER IS NOT IDENTIFIED AS TYPE I.E., ELECTRIC, GAS, |
| | TANK OR TANKLESS, PLEASE SUBMIT SPECIFICATION TO |
| | DETERMINE IF DRAINAGE TO THE OUTSIDE, THERMAL EXPANSION |
| | OR RELIEF LINE IS REQUIRED PER THE WPB AMENDMENTS TO |
| | THE FBC SEC. 107.2.1 INFORMATION ON CONSTRUCTION |
| | DOCUMENTS. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |