2020-12-16 08:58:461) SHT. G-10 - 010.20180831 - PLUMBING FIXTURE SCHEDULE
 - TAG #F25 REFERS TO A KOHLER WALL-MOUNT BATHROOM SINK
 & FAUCET WITH CROSS HANDLES. THESE HANDLES DO NOT MEET
 THE INTENT OF ANSI A117.1-1986 SECS.4.19.5 & 4.25.4.
 SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THIS ITEM.
 NOTE: BLADE HANDLES ARE AVAILABLLE FROM THE
 MANUFACTURER FOR THIS ITEM. THE RESPONSE NARRATIVE
 REFERS TO A CUT-SHEET FROM KOHLER. THERE IS NO ATTACHED
 CUT SHEET. THE HANDLES SHALL BE CHANGED TO BLADE
 HANDLES TO COMPLY WITH THE FLORIDA ACCESSIBILITY
 CODE.INDICATE THIS ON THE IXTURE SCHEDULE. 2ND REQUEST.
 2) SHT. A-224A - UNIT "E" - DETAIL #2 STILL REFERS TO
 DETAIL #12 ON SHT.A-772. SHT. A-772 IS NOT INCLUDED IN
 THIS SUBMITTAL.THE DETAIL # AND REFERENCED PLAN NEEDS
 TO BE CORRECTED. 2ND REQUEST.
 3) SHT. A-227A & A-771A - THE WALL NEXT TO THE WATER
 CLOSET CANNOT EXCEED 24 INCHES PER THE FAIR HOUSING ACT
 DESIGN MANUAL PAGE 7.43. THIS LAYOUT WITH THE SHOWER
 NEXT TO THE WATER CLOSET WILL NOT COMPLY
 4) SHT. A-243A - THE MEN'S AND WOMEN'S ADA SHOWER - THE
 SHOWER STALL SIZE AND CLEAR FLOOR SPACE SHALL COMPLY
 WITH ANSI A117.1-1986 SECS.4.21.1, 4.21.2, 4.21.4,
 4.21.5,4.21.6, & 4.21.8. AS DESIGNED, THESE SHOWERS DO
 NOT COMPLY WITH THE SIZE REQUIREMENTSAS STATED IN THE
 ANSI DOCUMENT.
 5) SUBMIT A DETAIL AND SIZING CALCULATIONS FOR THE
 SAND/OIL INTERCEPTOR. THE INTERCEPTOR SHALL COMPLY WITH
 FBC-PLUMBING SECS.1003.4.2, 1003.4.2.1. DETAIL #9 IS
 FOR THE STORM SUMPS, NOT A SAND/OIL INTERCEPTOR. 2ND
 REQUEST.
 6) SHT.A-626 - DETAILS #1 & #2 - PROVIDE THE DIMENSIONS
 OF THE ALUMINUM TUBE SCUPPER DRAINS FOR THE
 BALCONY.THERE ARE NO DIMENSIONS SHOWN ON THE PLANS. 2ND
 REQUEST.
 7) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE HAIR
 INTERCEPTOR. THE SPECIFICATIONS SHALL SHOW THE LISTING
 ORGANIZATION APPROVAL FOR THE UNIT. THE MODEL NUMBER
 HAS BEEN SUBMITTED BUT NOT THE SPECIFICATIONS AS
 PREVIOUSLY REQUESTED. 2ND REQUEST.FBC-PLUMBING
 SEC.1003.2, WPB AMEND. TO FBC SEC. 107.2.1.
 8) DOCUMENTATION FROM MANNY GONZALEZ REGARDING THE
 DISCHARGE OF THE POOL WATER TO THE SANITARY SYTEM SHALL
 BE SUBMITTED AND ALSO REGARDING THE DISCHARGE OF THE
 POOL NON-CONTAMINATED WATER TO THE STORM SYSTEM.
 9) THE CONDENSATE LINE SHOWN ON SHT.P-100B IS NOT SHOWN
 ON SHT. P-503B. REFER TO GRIDLINE GQ BETWEEN G18-G21.
 10) SUBMIT A REVISED CONDENSATE RISER FOR THE ADDED
 CONDENSATE DRAINS AND TAG THESE RISERS. WPB AMEND. TO
 FBC SEC. 107.2.1.
 11) SUBMIT A STORM RISER DIAGRAM FOR THE ADDED TERRACE
 DRAINS FOR THE AFFECTED UNITS. REFER TO SHTS. P-107,
 P-108 & P-109.
 12) SHT. P-100B - SANITARY PIPING ISOMETRIC - THE
 LAYOUT OF RISERS S/2, S/3, S/4 & S/5 DOES NOT CORRELATE
 WITH THE LAYOUT ON SHT. P-506. CLARIFY.
 13) SHT. P-100B - SHOWS A SANITARY RISER LABELED S/A
 BUT THIS RISER IS NOT SHOWN ON SHT. P-506. CLARIFY.
 WHAT DOES THIS RISER SERVE?
 14) SHT. P-100B - RISERS S/9, S/18, S/15, S/16 ARE
 SHOWN ON THE SANITARY RISER ON SHT. P-506 BUT NOT ON
 SHT. P-100B. CLARIFY.
 15) SHT. P-100B - THE LAYOUT OF THE SANITARY RISERS ON
 THE FLOOR PLAN DOES NOT CORRELATE WITH THE LAYOUT ON
 THE SANITARY RISER ON P- 506.
 16) SHT. P-100B - THE PIPING FROM THE SANITARY EJECTOR
 BY COL. G10 BETWEEN GF-GH IS NOT SHOWN ON THE SANITARY
 RISER ON SHT. P-502G OR P-506. CLARIFY.
 17) SHT. P-102B - THERE IS A CLOUDED NOTE ON THE PLAN
 THAT READS " PIPES CONTINUE ON SHEET P-102B." THIS NOTE
 APPEARS TO BE A TYPO BECAUSE THE NOTE IS ON P-102B. AND
 THE MATCH LINE NOTE REFERS TO SHT. 102A.
 18) SHT. P-109 - THE 3 INCH DD (255 SF) IS NOT SHOWN ON
 ANY O THE STORM RISERS ON SHT.P-503A. CLARIFY. IF THIS
 DRAIN IS LOCATED ON ANOTHER RISER ON ANOTHER PAGE,
 PLACE A NOTE ON THE FLOOR PLAN WITH THE INFORMATION.
 WPB AMEND. TO FBC SEC. 107.2.1.
 19) SHTS. P-107, P-108 & P-109 - PLACE A NOTE ON THESE
 PLANS WITH THE SHEET INFORMATION AS TO WHERE THE STORM
 RISERS FOR THE TERRACE DRAINS CAN BE FOUND. WPB AMEND.
 TO FBC SEC. 107.2.1.
 20) THE SANITARY ISOMETRICS FOR THE ENLARGED UNIT PLANS
 (A,B, C, D, E, F, G) SHOW TWO WASHING MACHINES
 DISCHARGING INTO A DOUBLE PATTERN FITTING. DOUBLE
 PATTERN SANITARY TEE PATTERN FITTINGS SHALL NOT RECEIVE
 THE DISCHARGE OF FIXTURES OR APPLIANCES WITH PUMPING
 ACTION DISCHARGE PER FBC-PLUMBING SEC.706.3. REFER TO
 SHTS. P-220, P-221, P-222, P-223, P-224.
 21) SHT. P-223 - SANITARY PIPING ISOMETRICS - TWO
 WASHING MACHINES ARE SHOWN DISCHARGING INTO THE SAME
 FIXTURE DRAIN. THE WASHING MACHINES SHALL CONNECT
 SEPARATELY TO THE STACK AND NOT THROUGH A DOUBLE
 PATTERN FITTING.FBC-PLUMBING SEC.706.3.
 22) SHT. P-224 - THERE ARE TWO WASHING MACHINES SHOWN
 ON THE SANITARY RISER BUT ONLY ONE SHOWN ON THE WATER
 RISER. CLARIFY. 2ND REQUEST.
 23) THE ISLAND VENT FOR THE KITCHEN SINK ON THE THE
 ENLARGED PLUMBING FLOOR PLANS (A,B, C, D, E, F, G)
 SHALL BE INSTALLED IN ACCORDANCE WITH FBC-PLUMBING
 SECS. 916.1 - 916.3.IN ADDITION, CLEANOUTS SHALL BE
 PROVIDED IN THE ISLAND FIXTURE VENT TO PERMIT RODDING
 OF ALL VENT PIPING LOCATED BELOW THE FLOOD LEVEL RIM OF
 THE FIXTURES. AS DRAWN, THE ISLAND VENT DOES NOT COMPLY
 WITH THE NOTED CODE SECTIONS.REFER TO SHTS. P-220,
 P-221, P-222, P-223, P-224.
 24) SHT. P-241 - SANITARY PIPING ISOMETRIC DINING AREA
 - THE VENTING FOR THE GREASE TRAP DOES NOT APPEAR TO
 COMPLY WITH FBC-PLUMBING SEC.905.4. CLARIFY.
 25) SHT. P-242 - DETAIL #3 - NOTE THE TYPE OF BACKFLOW
 PREVENTION DEVICE TO BE INSTALLED ON THE DUPLEX AND
 TRIPLEX WATER TREATMENT SYSTEMS. COMPLY WITH
 FBC-PLUMBING TABLE 608.1.
 26) SHT.P-242 - DETAIL 31 - A REDUCED PRESURE ZONE
 VALVE BACKFLOW PREVENTION DEVICE SHALL BE INSTALLED ON
 THE COOLING TOWER MAKE-UP WATER AND ALSO ON THE 1 1/2
 INCH CW FOR HVAC USE.
 27) THE WATER SHUTOFF VALVES LOCATED IN THE WASHING
 MACHINE DRAIN BOX SHALL BE PROVIDED WITH ACCESS PER
 FBC-PLUMBING SEC.606.3. THE SHUTOFF VALVES SHALL BE
 ABLE TO BE OPERATED WITHIN REACH WITHOUT MOVING THE
 APPLIANCE.
 28) SHT. P-501B - A PARTIAL DOMESTIC WATER RISER
 DIAGRAM HAS BEEN SUBMITTED. CLARIFY. IT APPEARS THAT
 THE WATER DISTRIBUTION SYSTEM IS A DOWNFEED SYSTEM. A
 FULLL OPEN SHUTOFF VALVE IS REQUIRED ON THE TOP OF
 EVERY WATERDOWNFEED PIPE PER FBC-PLUMBING SEC.606..1
 (5). SUBMIT A COMPLETE WATER RISER FOR REVIEW.
 29) SHT. P-501B - THE BACKFLOW DEVICE FOR THE SWIMMING
 POOL AND THE COOLING TOWER AND IRRIGATION SYSTEM SHALL
 BE REDUCED PRESSURE ZONE BACKFLOWS AND SHALL BE LEAD
 FREE PER THE CITY OF WPB CROSS-CONNECTION CONTROL
 MANUAL.
 30) SHT. P-502G - RISER TAGS ARE MISSING FROM THE
 SANITARY RISERS. WPB AMEND. TO FBC SEC. 107.2.1.THERE
 ARE PIPE SIZES AND VENT SIZES MISSING, VENTS HAVE NO
 RISER TAGS, THE SLOPE OF THE PIPE IS MISSING AND THE
 CONTINUATION POINTS OF VENTS ARE NOT SHOWN/IDENTIFIED.
 31) SHTS. P-503A, P-503B & P-503C - PLACE A NOTE ON
 THESE DRAWINGS & RISER DIAGRAMS IDENTIFYING THE PLAN
 VIEW SHEETS THAT ARE APPLICABLE TO THESE RISES. I COULD
 NOT FIND A PLAN VIEW LABELED "PODIUM EAST" OR "PODIUM
 WEST". WPB AMEND. TO FBC SEC. 107.2.1.
 32) SHTS. P-503A, P-503B & P-503C - SHOW THE SLOPE OF
 THE HORIZONTAL STORM DRAIN PIPING. THE SLOPE IS ONLY
 SHOWN AT SEVERAL SECTIONS OF THE RISER DIAGRAMS. IF THE
 INTENT IS TO HAVE ALL PIPING SLOPED AT 1/8 INCH PER
 FOOT, PLACE A NOTE TO THIS EFFECT ON ALL THREE SHEETS.
 WPB AMEND TO FBC SEC.107.2.1.
 33)SHT. P-502G - RISER TAGS ARE MISSING FROM THE
 SANITARY RISERS. WPB AMEND. TO FBC SEC. 107.2.1.THERE
 ARE PIPE SIZES AND VENT SIZIES MISSING, VENTS HAVE NO
 RISER TAGS, THE SLOPE OF THE PIPE IS MISSIN AND THE
 CONTINUATION POINTS OF VENTS ARE NOT SHOWN/IDENTIFIED.
 34) SHT. P-503B - IDENTIFY THE CONDENSATE DRAINS ON THE
 RISER AND SIZE THE CONDENSATE DRAINS.WPB AMEND. TO FBC
 SEC. 107.2.1.
 35) SHT. P503B - PLACE A NOTE ON THE DRAWING "SEE
 DRAWING P-100B FOR PLAN VIEW." WPB AMEND. TO FBC SEC.
 107.2.1.
 36) SHT. P-503B - A 4 INCH STORM LINE IS MISSING FROM
 THE RISER DIAGRAM. REFER TO COL. LINE G9 BETWEEN COLS.
 GJ- GR. THERE ARE ALSO PLANTER DRAINS CALLED OUT ON TH
 RISER BUT PIPING IS NOT SHOWN. CLARIFY.
 37) SHT. P-503B - SIZE THE HORIZONTAL STORM DRAIN THAT
 IS DISCHARGING INTO THE SAND INTERCEPTOR AND THE TOTAL
 GPM'S.
 38) SHT. P-503B - THERE ARE NUMEROUS SECTIONS OF PIPING
 WITH NO PIPE SIZES. THERE IS ALSO A SECTION OF STORM
 PIPING ON THE RIGHT SIDE OF THE SHEET THAT SHOWS A 4
 INCH GD THAT IS NOT CONNECTED TO THE SYSTEM AND OTHER
 SECTIONS IN THE SAME AREA AND LOWER CENTER WITH NO
 CONTINUATION POINTS.
 39) SHTS.P-503B & P-503C - THE PLANS NOTE " REFER TO
 CIVIL DRAWINGS FOR CONTINUATION." PLACE THE SPECIFIC
 CIVIL DRAWING NUMBER ON THE RISERS WHERE THE STORM
 DRAIN CAN BE FOUND. WPB AMEND. TO FBC SEC. 107.2.1.
 40) SHT. P-506 - THERE ARE ADDITIONAL RISERS ( 4" W UP,
 3" W UP, ) SHOWN ON SHT. P-100B BETWEEN COLS.G8-G11 AND
 GA-GB THAT ARE NOT SHOWN ON THE SANITARY PIPING
 ISOMETRIC ON SHT. P-506. CLARIFY.
 41) SHT. P-506 - THERE ARE THREE STORM DRAINAGE PIPING
 ISOMETRICS WITH NO RISER TAGS. TAG ALL THE RISERS FOR
 IDENTIFICATION. WPB AMEND. TO FBC SEC. 107.2.1. DO THE
 SAME FOR THE DOWNSPOUT ISOMETRIC AND SHOW THE GPM'S
 DISCHARGING INTO EACH RISER & DOWNSPOUT. COMPLY WITH
 FBC-PLUMBING TABLES 1106.2 & 1106..3.
 42) SHT. P-506 - IDENTIFY THE SPECIFIC PLAN SHEET THAT
 EACH RISER CORRESPONDS WITH. IT IS EXTREMELY DIFFICULT
 TO LOCATE THESE RISERS ON THE PLAN SHEETS IN ORDER TO
 SCHECK THE LAYOUT AND LOCATION.WPB AMEND. TO FBC SEC.
 107.2.1.
 43) SHT. P-506 - SANITARY ISOMETRIC - SHOW THE SLOPE OF
 THE PIP ON THE RISER. COMPLY WITH FBC-PLUMBING SEC.
 704.1 & TABLE 704.1.
 44) SHT. P-506 - STORM DRAINAGE PIPING ISOMETRIC WITH
 RISER TAGS - THE LAYOUT OF THE STORM PIPING ON THE
 RISER DIAGRAM DOES NOT CORRRELATE WITH THE PLAN VIEW
 LAYOUT ON SHT. P-100B.
 45) SHT. P-506 - IDENTIFY/ LABEL EACH RISER WITH EITHER
 LETTER OR NUMERICAL CHARACTERS . WPB AMEND. TO FBC SEC.
 107.2.1.
 46) BACKFLOW PREVENTION DEVICES OTHER THAN THE DUAL
 CHECK VALVES SHALL BE PERMITTED UNDER A SEPARATE PERMIT
 PER THE CITY OF WPB CROSS- CONNECTION CONTROL MANUAL
 SEC. (B) (5).
 47) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION
 INSTRUCTIONS FOR THE STEAM GENERATOR. REFER TO WATER
 ISOMETRIC FOR THE SPA AND CHANGING AREA ON SHT. P-240.
 48) SHT.P- 601 - THERMOSTATIC MIXING VALVE SCHEDULE
 SHOWS THE VALVES COMPLYING WITH ASSE 1017. THE
 FBC-PLUMBING SEC.607.1.2 REQUIRES TEMPERED WATER TO BE
 SUPPLIED THROUGH A WATER TEMPERATURE LIMITING DEVICE
 THAT CONFORMS TO ASSE 1070 AND SHALL LIMIT THE TEMPERED
 WATER TO A MAXIMUM OF 110 DEGREES.
 49) SHT. P-707 - SUBMIT MANUFACTURER'S SPECIFICATIONS
 AND SIZING CALCULATIONS FOR THE GREASE INTERCEPPTOR.
 THE SUBMITTED SIZING CALCULATIONS ARE VAGUE AND
 INCOMPLETE.
 A) WHAT FIXTURES ARE DISCHARGNG INTO THE INTERCEPTOR
 AND HOW MANY? THE PLANS SHOW 2 SINKS AND 2 DISHWASHERS.
 B) WHAT STANDARD IS BEING USED FOR THE SIZING OF THE
 INTERCEPTOR?
 C) A SAMPLING PORT IS REQUIRED ON THE OUTLET OF THE
 INTERCEPTOR PER CITY OF WEST PALM BEACH UUTILITIES
 DEPARTMENT.
 D) SINKS AND DISHWASHERS SHALL DISCHARGE INDIRECTLY
 THROUGH AN AIR GAP OR AN AIR BREAK TO THE DRAINAGE
 SYSTEM PER FBC-PLUMBING SEC.802.1.6, 802.1.8, 802.2.
 50) SHT. P-707 - DETAIL #5 - RIGID SSUPPORT SWAY
 BRACING SHALL BE PROVIDED AT CHANGES IN DIRECTION
 GREATER THAN 45 DEGREESFOR PIPE SSIZES 4 INHES AND
 LARGER. THE DETAIL REFERS TO PIPE 6 INCHES AND
 GREATER.ANCHORAGE SHALL BE PROVIDDED PER FBC-PLUMBING
 SECS.308.7 & 308.7.1.
  
 FUEL TANK/ FUEL PIPING
  
 51) SUBMIT A COPY OF THE UL 142 CERTIFICATION FOR THE
 FUEL TANK PER NFPA 30 SEC. 2.3.9, 21.4.2.
 52) INDICATE THE TYPE OF FUEL AND THE CLASS OF
 COMBUSTIBLE LIQUID ( CLASS II, CLASS IIA, CLASS III A
 OR CLASS III B) OF THE FUEL ON THE PLANS PER NFPA 330
 SEC.4.3.2.
 53) SUBMIT COPIES OF THE SAFETY DATA SHEETS FOR THE
 FUEL.
 54) SUBMIT SPECIFICATIONS FOR THE FUEL TANK SHOWING
 COMPLIANCE WITH NFPA 30.
 55) SUBMIT PIPING DETAILS/ RISER DIAGRAM FOR THE NORMAL
 VENTING AND EMERGENCY VENTING OF THE FUEL TANK. VENT
 PIPING SHALL COMPLY WITH NFPA 30 SEC.27.8.
 56) THE FUEL TANK VENTS SHALL BE LOCATED 5 FEET FROM
 ANY BUILDING OPENINGS, A MINIMUM OF 12 FEET ABOVE THE
 ADJACENT GROUND LEVEL AND 15 FEET FROM POWERED
 VENTILATION AIR INTAKES PER NFPA 30 SEC. 27.8.1.1,
 27.8.1.3.
 57) SUBMIT A FUEL PIPING RISER DIAGRAM FOR THE SUPPLY &
 RETURN FUEL PIPING FOR THE 2,000 GALLLON FUEL TANK
 INCLUDING THE PIPING TO THE FUEL POLISHING SYSTEM AND
 ALSO FROM THE FUEL FILL PORT TO THE TANK. WPB AMEND. TO
 FBC SEC. 107.2.1.
 58) SUBMIT SPECIFICATIONS/ INFORMATION ON THE FUEL
 POLISHING SYSTEM. WPB AMEND. TO FBC SEC. 107.2.1.
 59) SUBMIT A LEGEND FOR THE LETTERS SHOWN ON THE 2,000
 FUEL TANK ON SHT. P-242.
 60) PROVIDE DETAILS ON PROVISIONS FOR THE PROMPT AND
 SAFE MIITIGATION AND DISPOSAL OF LEAKAGE OR SPILLS PER
 NFPA 30 SEC. 18.4.2.
 61) TANK FILL PIPES THAT ENTER THE TOP OF A TANK SHALL
 TERMINATE WITHIN 6 INCHES OF THE BOTTOM OF THE TANK.
 NFPA 30 SEC. 21.4.4.
 62) EACH CONNECTION TO AN ABOVEGROUND TANK THROUGH
 WHICH LIQUID CAN NORMALLY FLOW SHALL BE PROVIDED WITH
 AN INTERNAL OR AN EXTERNAL VALVE LOCATED AS CLOSE AS
 PRACTICAL TO THE SHELL OF THE TANK.NFPA 30 SEC.
 22.13.1. REFER TO THE SUPPLY AND RETURN LINES TO THE
 GENERATOR.
 63) SHT.P-242 - THE SUPPLY AND RETURN LINES TO THE
 GENERATOR APPEAR TO BE MISLABELED AS TO THE FLOW.
 CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW