| Date |
Text |
| 2020-10-01 09:42:14 | 1) SHT.P-001 - FUEL GAS DISTRIBUTION SYSTEM NOTES - |
| | NOTE #1 (C) - GAS PIPING SHALL BE INSTALLED PER |
| | FBC-FUEL GAS 2017. REVISE THE NOTE. |
| | 2) THE GAS VALVE FOR THE RANGE SHALL BE PROVIDED WITH |
| | ACCESS.IF THE VALVE IS LOCATED BEHIND THE RANGE, THIS |
| | DOES NOT MEET THE DEFINITION OF "ACESS" OR "READY |
| | ACCESS" PER THE GAS CODE. CLARIFY THE LOCATION OF THE |
| | GAS VALVE ON THE PLANS. |
| | 3) SHT. P-242 - DETAIL #1- ENLARGED MECHANICAL ROOM - |
| | THE GAS LINE TO THE BOILER IS SHOWN AS 2 PSI AND THE |
| | GAS LINE TO GWH-2 IS SHOWN AS 1 PSI. HOW IS THE |
| | PRESSURE BEING REDUCED WHEN HERE IS NO REGULATOR SHOWN |
| | ON THE SYSTEM STEPPING THE PRESSURE DOWN TO 1 PSI. |
| | CLARIFY. |
| | 4) PROVIDE DETAILS AS TO HOW THE STEEL PIPING BELOW |
| | GROUND WILL BE PROTECCTED AGAINST CORROSION. PROTECTION |
| | SHALL BE PROVIDED IN ACCORDANCE WITH FBC -FUEL GAS |
| | SEC.404.11 -404.11.2. |
| | 5) SHT. P-505 - THERE IS A NOTE AT THE BASE OF EACH GAS |
| | RISER FOR THE RANGES THAT REFERS TO AN "R.C.V." CLARIFY |
| | THIS ACRONYMN. IF THIS NOTE IS REFERRING TO A REMOTE |
| | CONTROL VALVE, A REMOTE CONTROL VALVE IS NOT CONSIDERED |
| | A "POINT OF DELIVERY" PER THE GAS CODE AND THE SIZING |
| | OF THE GAS PIPING SYSTEM SHALL BE DETERMINED USING THE |
| | LONGEST LENGTH OF PIPING FROM THE "POINT OF DELIVERY" |
| | TO THE MOST REMOTE OUTLET AND THE LOAD OF THE SECTION |
| | PER FBC-FUEL GAS SEC.402.4.1. THE DISTANCE TO BE USED |
| | IS 582.5 FT. AND THE 600 FT. ROW FOR SIZING THE GAS |
| | SYSTEM. |
| | 6) SHT.P-505 - GAS RISER G-4 & G-1 - THE 2 INCH RISER |
| | WILL BE UNDERSIZED USING A DISTANCE OF 600 FT.FROM THE |
| | POINT OF DELIVERY AND TABLE 402.4 (3) FROM THE FBC- |
| | FUEL GAS. |
| | 7) SHT. P505 - SIZE RISER G-1 AT THE CONNECTION POINT |
| | TO THE 4 INCH GAS MAIN AND SIZE RISER G-1. |
| | 8) SHT. P-505 - RISER G-5 - THE 3/4 INCH RISER WILL BE |
| | UNDERSIZED USING A DISTANCE OF 600 FT. FROM THE POINT |
| | OF DELIVERY AND TABLLE 402.4 (3) FROM FBC-FUEL GAS. |
| | 9) THERE ARE TWO GAS DRAWINGS IN THE SET THAT ARE |
| | LABELED AS P-505. CLARIFY. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |