| 2020-07-17 11:30:18 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) SUBMIT THE REQUIRED SPECIAL INSPECTOR DOCUMENTS. A |
| | SPECIAL INSPECTOR IS REQUIRED FOR THIS PROJECT AS |
| | INDICATED ON SHEET G003 OF THE PLANS. CITY AMENDMENTS |
| | FBC 110.3.9 OTHER INSPECTIONS SERVICES. THE BUILDING |
| | OFFICIAL MAY MAKE, OR CAUSE TO BE MADE BY OTHERS, THE |
| | INSPECTIONS REQUIRED BY SECTION 110. HE/SHE MAY ACCEPT |
| | REPORTS OF INSPECTORS OF RECOGNIZED INSPECTION |
| | SERVICES, PROVIDED THAT AFTER INVESTIGATION HE/SHE IS |
| | SATISFIED AS TO THEIR QUALIFICATIONS AND RELIABILITY. A |
| | CERTIFICATE CALLED FOR BY ANY PROVISION OF THE |
| | TECHNICAL CODES SHALL NOT BE BASED ON SUCH REPORTS |
| | UNLESS THE SAME ARE IN WRITING AND CERTIFIED BY A |
| | RESPONSIBLE OFFICER OF SUCH SERVICE. THE BUILDING |
| | OFFICIAL MAY REQUIRE THE |
| | OWNER TO EMPLOY AN INSPECTION SERVICE IN THE FOLLOWING |
| | INSTANCES: CITY OF WEST PALM BEACH AMENDMENTS TO THE |
| | FLORIDA BUILDING CODE, 6TH EDITION (2017) |
| | 1. FOR BUILDINGS OR ADDITIONS OF TYPE I OR II |
| | CONSTRUCTION |
| | 2. FOR ALL MAJOR STRUCTURAL ALTERATIONS |
| | 3. WHERE THE CONCRETE DESIGN IS BASED ON COMPRESSIVE |
| | STRENGTH (F 'C) IN EXCESS OF 3000 |
| | POUNDS PER SQUARE INCH |
| | 4. FOR PILE DRIVING |
| | 5. FOR BUILDINGS WITH AREA GREATER THAN 20,000 SQUARE |
| | FOOT |
| | 6. FOR BUILDINGS MORE THAN 2 STORIES IN HEIGHT |
| | 7. FOR BUILDINGS AND STRUCTURES OF UNUSUAL DESIGN OR |
| | METHODS OF CONSTRUCTION |
| | SUCH INSPECTORS SHALL BE ADEQUATELY PRESENT AT TIMES |
| | WORK IS UNDERWAY ON THE STRUCTURAL ELEMENTS OF THE |
| | BUILDING. SUCH INSPECTORS SHALL BE A REGISTERED |
| | ARCHITECT, OR ENGINEER, OR A PERSON LICENSED UNDER |
| | CHAPTER 468, PART XII, FLORIDA STATUTES. SUCH |
| | INSPECTORS SHALL SUBMIT WEEKLY PROGRESS REPORTS |
| | INCLUDING THE DAILY INSPECTIONS TO THE BUILDING |
| | OFFICIAL, AND INCLUDING A CODE COMPLIANCE OPINION OF |
| | THE RESIDENT INSPECTOR. AT THE COMPLETION OF THE |
| | CONSTRUCTION WORK OR PROJECT, SUCH INSPECTORS SHALL |
| | SUBMIT A CERTIFICATE OF COMPLIANCE TO THE BUILDING |
| | OFFICIAL, STATING THAT THE WORK WAS DONE IN COMPLIANCE |
| | WITH THIS CODE AND IN ACCORDANCE WITH THE PERMITTED |
| | DRAWING. FINAL INSPECTION SHALL BE MADE BY THE BUILDING |
| | OFFICIAL BEFORE A CERTIFICATE OF OCCUPANCY OR |
| | CERTIFICATE OF COMPLETION IS ISSUED; AND CONFIRMATION |
| | INSPECTIONS MAY BE MADE AT ANY TIME TO MONITOR |
| | ACTIVITIES AND RESIDENT INSPECTORS. |
| | |
| | 2) PLEASE CONTACT ME WITH AN EMAIL ADDRESS AND I WILL |
| | BE HAPPY TO SEND YOU A COPY OF THE CURRENT (OCTOBER |
| | 2018) GUIDELINES AND POLICIES FOR PROJECTS CONCERNING |
| | THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS. |