| Date |
Text |
| 2020-07-28 13:03:47 | 07/28/2019 1ST PLUMBING/POOL REVIEW **DENIED** WITH |
| | COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS |
| | SPECIFIC TO THE PUMP BEING INSTALLED ON THIS POOL. THIS |
| | IS NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE |
| | TDH CALCULATIONS PER THE WPB AMENDMENTS TO THE FBC SEC. |
| | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | |
| | 2. A BACKFLOW (PVB) IS REQUIRED ON THE AUTOFILL PER THE |
| | 2017 FBC-PLUMBING SEC.608.1 AND A REDUCE PRESSURE ZONE |
| | VACUUM BREAKER ASSEMBLY IS REQUIRED AT METER PER THE |
| | CITY OF WEST PALM BEACH CROSS CONNECTION PROGRAM. |
| | |
| | 3. PLANS SHOW A POOL HEATER PLEASE CLARIFY IS IT GAS OR |
| | IS IT ELECTRIC, AS A GAS AND SPA HEATERS SHALL HAVE A |
| | MINIMUM THERMAL EFFICIENCY OF 82 % AND AS A HEAT PUMP |
| | POOL HEATERS SHALL HAVE A MINIMUM COP OF 4.0 WHEN |
| | TESTED IN ACCORDANCE WITH AHRI 1160 PER THE WPB |
| | AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON |
| | CONSTRUCTION DOCUMENTS. |
| | |
| | 4. IF THERE IS A POOL HEATER, PLEASE PROVIDE |
| | SPECIFICATIONS PER THE WPB AMENDMENTS TO FBC SEC. |
| | 107.2.1. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING INSPECTOR / |
| | PLUMBING PLAN REVIEW |
| | AVAILABLE FROM 1:00 PM TO 4:00 PM |
| | [email protected] |
| | 561-805-6720 |
| | |
| | |