| Date |
Text |
| 2020-07-24 10:15:24 | PLAN REVIEW GENERATOR - BUILDING |
| | |
| | CHRISTOPHER S. THROOP, C.B.O. |
| | PLANS EXAMINER BUILDING - PX3169 |
| | PLANS EXAMINER 1&2 FAMILY - SFP306 |
| | CONSTRUCTION SERVICES DIVISION |
| | TEL: 561-805-6726 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2017 FLORIDA BUILDING CODE, 6TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | |
| | 1ST REVIEW |
| | |
| | RESULTS: DENIED |
| | |
| | YOUR SUBMITTAL IS DEFICIENT FOR THE REASONS LISTED |
| | BELOW. |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | 1) CITY OF WPB CHPT. 1 ?VALUE |
| | 109.3 BUILDING PERMIT VALUATIONS. |
| | |
| | 1A) THE STATED VALUE APPEARS LOW FOR THE PROPOSED SCOPE |
| | OF WORK. |
| | 1B) THE PERMIT VALUATION AND PERMIT FEE MUST BE |
| | COMMENSURATE WITH THE VALUATION AND FEE THAT A LICENSED |
| | CONTRACTOR WOULD PROVIDE. THIS INCLUDES ALL LABOR, |
| | MATERIALS AND RENTALS OF EQUIPMENT TO PERFORM THE SCOPE |
| | OF WORK. |
| | 1C) YOU MAY PROVIDE A COPY OF THE CONTRACT SIGNED BY |
| | THE OWNER OR A LIST OF LABOR, MATERIALS AND EQUIPMENT |
| | RENTAL TO VERIFY VALUE. |
| | 1D) FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL. |
| | PLEASE INCREASE THE VALUATION ACCORDINGLY. |
| | |
| | 2) GENERATOR PAD |
| | |
| | 2A) PROVIDE STRUCTURAL DETAILS OF CAST-IN-PLACE PAD. |
| | PROVIDE FASTENER SCHEDULE. DESIGNER SHALL PRINT NAME |
| | AND SIGN PLAN. |
| | OR |
| | 2B) PROVIDE PRE-CAST SLAB WITH STRUCTURAL DETAILS AND |
| | ENGINEERING. |
| | 2C) PROVIDE WIND DESIGN WIND LOADS FOR THE GENERATOR |
| | PER FBC 107.3.5.3 AND R301.2 AS REQUIRED FOR THE |
| | GENERATOR PAD ENGINEERING. |
| | 2D) STRUCTURAL DETAILS OF PAD AND DESIGN WIND LOADS |
| | SHALL BE SIGNED AND SEALED BY A DESIGN PROFESSIONAL. |
| | |
| | 3) PROVIDE A SURVEY OR SITE PLAN.SHOW LOCATION OF |
| | PROPOSED GENERATOR. PROVIDE SETBACKS TO STRUCTURE, |
| | BUILDING OPENINGS AND PROPERTY LINES PER 107.2 |
| | CONSTRUCTION DOCUMENTS |
| | |
| | 4) A SEPERATE GAS PERMIT IS REQUIRED PE CHPTR 1 SECTION |
| | 105.1 AND 107.3.5.1.5 |
| | |
| | |
| | |
| | |