| Plan Review Notes For Permit 20061444 |
| Permit Number |
20061444 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-07-07 08:18:57 | APPROVED WITH EXCEPTIONS. BUILDING PROVISO. | | | | | | 1) A SEPARATE PERMIT APPLICATION, PLANS AND REVIEW IS | | | REQUIRED FOR THE FABRIC AND ITS ATTACHMENT TO THE THE | | | METAL FRAMES. FBC 107 | | | | | | 2) WORKING CLEARANCES SHALL BE MAINTAINED AROUND THE | | | EQUIPMENT THAT IS BEING SCREENED. FBCM 303.12 & FBC 107 | | | | | | WELDING COMMENTS | | | | | | AWS D1.1 CLAUSE 3.1: AT TIME OF INSPECTION PLEASE | | | PROVIDE A WELD PROCEDURE SPECIFICATION; THE W.P.S. | | | SPECIFIES THE REQUIRED ESSENTIAL VARIABLES INCLUDING: | | | BASE MATERIALS, JOINTS, PROCESS, AND FILLER METALS TO | | | BE USED. | | | | | | AWS D1.1 CLAUSE 4.15: AT TIME OF INSPECTION PLEASE | | | PROVIDE A WELDER PERFORMANCE QUALIFICATION RECORD; THE | | | W.P.Q.R. PROVIDES INFORMATION WHICH CAN BE USED TO | | | VERIFY THE WELDER?S QUALIFICATION AND CERTIFICATION AS | | | IT RELATES TO THE WELDING REQUIREMENTS OF THE PROJECT. | | | | | | |
|