| Plan Review Notes For Permit 20061260 |
| Permit Number |
20061260 |
|
| Review Stop |
SIGNATURE |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-07-02 13:16:59 | WIND DESIGN PRESSURES NEED TO BE ELECTRONICALLY SIGNED | | | AND SEALED - ORIGINAL SIGNED AND SEALED DOCUMENTS CAN | | | BE HAND DELIVERED TO THE BUILDING DEPT (LEFT IN A DROP | | | BOX) AND COULD TAKE UP TO 2 TO 3 WEEKS TO GET PROCESSED | | | (LIMITED STAFF - MOST ARE WORKING REMOTELY) = | | | DRAWINGS/DOCUMENTS NEED TO BE DIGITALLY/ELECTRONICALLY | | | SIGNED BY THE ENGINEER OR ARCHITECT TO BE USED IN | | | ELECTRONIC PLAN REVIEW. DRAWINGS/DOCUMENTS DO NOT SHOW | | | IN "ADOBE READER" AS DIGITALLY/ELECTRONICALLY SIGNED. | | | | | | FYI = ENGINEER CANNOT SELF-CERTIFY THE DIGITAL | | | SIGNATURE | | | 668.003(2) AND (3), F.S. | | | (2) A PROFESSIONAL ENGINEER UTILIZING A DIGITAL | | | SIGNATURE TO ELECTRONICALLY SIGN AND SEAL ENGINEERING | | | PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS SHALL HAVE | | | THEIR IDENTITY AUTHENTICATED BY A CERTIFICATION | | | AUTHORITY. | | | |
|