| Date |
Text |
| 2020-09-29 17:15:02 | WEST PALM BEACH DEVELOPMENT SERVICES-CONSTRUCTION |
| | SERVICES/ BUILDING DIVISION |
| | 2017 FBC- BUILDING PLAN REVIEW |
| | W. P. B. PERMIT: 20061052 |
| | ADD: 3200 ELECTRONICS WAY |
| | CONT: CLEAR SPAN STRUCTURES |
| | TEL: 561-803-8100 / GLENN BLOUNT |
| | E-MAIL: [email protected] |
| | |
| | 2017 FLORIDA BUILDING CODE W 2017 WEST PALM BEACH |
| | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| | ADMINISTRATION |
| | |
| | 3RD REVIEW |
| | DATE: TUES. SEPT. 29TH/ 2020 |
| | ACTION: |
| | |
| | 1-4) COMPLIED. |
| | . |
| | 4) 2ND REQUEST. THIS REVIEW THE NUCOR DRAWINGS PACKAGE |
| | OF 14 AND ONE OF 36 PLUS THE PRODUCT APPROVALS FOR THE |
| | ROOF AND WALL SYSTEMS. ROOF ZONE 3 IS 6 FEET 9 INCHES |
| | IN THE DIRECTION OF THE RIDGE. |
| | IN THE PACKAGE OF 36 PLANS PLAN 15 OF 36 IS THE ROOF |
| | PLAN WITH ROOF ZONES. SHEET 9 OF 14 SET OF PLANS SHOWS |
| | THE ROOF PURLIN SPACING. THE SPACING STARTS FROM THE |
| | EDGE OF THE ROOF WITH 2 FEET TO THE NEXT PURLIN THEN A |
| | SPACE OF 3 FEET 9 INCHES AND A SECOND SPACE OF 3 FEET |
| | NINE INCHES. |
| | |
| | THE ROOFING PRODUCT APPROVAL FL. 4891.1-R8 PAGE 2 OF 3 |
| | INDICATES THE ROOFING SYSTEMS (3) WITH VICE LOCK 360 |
| | WITH SUPPORTS AT 24 INCHES ON CENTER IS GOOD FOR 108.8 |
| | PSF. THE SAME VISE LOCK 360 WITH SUPPORTS AT 5FEET IS |
| | GOOD FOR 59.3PSF. IT WOULD APPEAR ANOTHER PURLIN IS |
| | NEEDED IN THE CORNER OF THE BUILDING FOR ROOF ZONE 3. |
| | THE SAME SITUATION MAY OCCUR IN WALL ZONE 5 THE WALL |
| | END ZONE. SHEET 11OF 36, SHEET 9 OF 14 AND PRESSURES |
| | FOR THE END ZONE DO NOT MAKE IT. PLEASE ALSO NOTE THE |
| | SHOP DRAWING STAMP OF APPROVAL BLOCKS OUT THE BOTTOM |
| | SPAN ON ALL SHEETS RIGHT SIDE OF THE BUILDING, ASSUMING |
| | THE LEFT SIDE WILL HAVE THE SAME SPACING. |
| | CALLED NUCOR ABOUT THIS ISSUE, SPOKE TO RUSS MILFORD |
| | PROJECT MANAGER HE SAID THE ENGINEER ANDREW JOHNSON |
| | WOULD GET BACK TO ME. |
| | |
| | 5) BUILDING PROVISO: BUILDINGS WITH WELDED OR BOLTED |
| | CONNECTIONS, THE CONTRACTOR IS REQUIRED TO PROVIDE WELD |
| | PROCEDURE SPECIFICATIONS & WELDER OPERATOR PERFORMANCE |
| | QUALIFICATION RECORDS IN ACCORDANCE WITH THE REFERENCED |
| | STANDARDS AT TIME OF INSPECTION FOR FIELD WIELDING, ON |
| | THE JOB-SITE WIELDING. THIRD PARTY CERTIFICATION WILL |
| | BE REQUIRED. |
| | 2017 FBC-B 2204.1 WELDING |
| | 1. WELD PROCEDURES SPECIFICATIONS |
| | 2. QUALIFICATIONS OF WELDING PERSONAL |
| | 2017 FBC-B 2204.2 BOLTING. |
| | IF FURTHER CLARIFICATION AND OR QUESTIONS IS REQUIRED, |
| | PLEASE CONTACT THE CHIEF BUILDING INSPECTOR KEN CONRAD |
| | AT |
| | 561-805-6666. |
| | |
| | BUILDING PROVISO:6) DELEGATED ENGINEERING. 61G15-30.003 |
| | ENGINEERING DOCUMENT CLASSIFICATION. FL 61G-15-30.006 |
| | (3) THE DELEGATED ENGINEER SHALL FORWARD THE DELEGATED |
| | ENGINEERING DOCUMENTS TO THE ENGINEER OF RECORD FOR |
| | REVIEW. |
| | |
| | |
| | 7-9) COMPLIED. |
| | |
| | 10) A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR |
| | PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | PLEASE NOTE WE ARE WORKING FROM HOME BECAUSE OF COVID |
| | 19 |
| | IF YOU WOULD LIKE TO CONTACT ME, MY CELL NUMBER IS |
| | 561-718-9724. |
| | |
| | JAMES A. WITMER BN, PX, SFP, CBO |
| | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| | BUILDING DIVISION / DEVELOPMENT SERVICES DEPARTMENT |
| | 401 CLEMATIS ST. WEST PALM BEACH. FL 33402 |
| | TEL: 561-805-6717 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |
| | |
| | |