| 2020-06-29 13:22:53 | 1A) THE GRADING PLAN INDICATES THE FLOOR ELEVATION OF |
| | THE EXISTING BUILDING AT 12.08 FEET. THE PLAN DOES NOT |
| | INDICATE IF THIS ELEVATION IS IN NGVD OR NAVD88? THE |
| | NEW PAVILION FINISH FLOOR ELEVATION IS NOT GIVEN. ) |
| | BOTH BUILDINGS ARE IN AN AE FLOOD ZONE. |
| | |
| | 1B) ARTICLE XVII ORDINANCES ARTICLE XVII FLOOD |
| | PREVENTION & CONTROL. |
| | FBC BUILDING 1612 AND CITY OF WPB CODE OF SECTION |
| | 94-546. STRUCTURE IS LOCATED IN AN "A" FLOOD ZONE. A |
| | FLOOD ELEVATION CERTIFICATE WILL BE REQUIRED. PLEASE |
| | REVIEW CITY ORDINANCE FOR THE CITY REQUIREMENTS REQUIRE |
| | AN ADDITIONAL 6 INCHES/ (12 INCHES OF ELEVATION IF |
| | PERMIT APPLICATION AFTER SEPT. 12/2016, |
| | AFTER OCT. 11/ 2017 AN ADDITIONAL ONE FOOT OF FREE |
| | BOARD WILL BE REQUIRED OR (2) FEET ABOVE BASE FLOOD. |
| | AFTER OCT. 11/ 2017 THE BUILDING DEPARTMENT WILL HAVE |
| | ADOPTED THE NEW FLOOD MAPS AND ALSO IN TOUGHS MAPS THE |
| | NAVD 88 ELEVATIONS. YOU CAN GO TO THE WEBSITE: |
| | WWW.NGS.NOAA.GOV/TOOLS/VERTCON/VERTCON.HTML FOR |
| | CONVERSIONS. |
| | |
| | 1C) DURING THE PERMITTING OF THIS STRUCTURE THERE WILL |
| | BE REQUIRED (3) DIFFERENT FLOOD ZONE CERTIFICATES |
| | REQUIRED: |
| | (1) A FLOOD ZONE CERTIFICATE IS REQUIRED AS PART OF THE |
| | PLAN REVIEW DOCUMENTS WITH THE PROPOSED FINISH FLOOR |
| | HEIGHT. W. P. B. ADMINISTRATIVE CODE 107.3.5.1.1 |
| | BUILDING MINIMUM PLAN REVIEW CRITERIA FOR COMMERCIAL |
| | BUILDINGS. ( 8) FLOOD REQUIREMENTS ELEVATIONS, |
| | ENCLOSURES, FLOOD DAMAGE-RESISTANT MATERIALS. |
| | (2) ONCE THE FIRST FLOOR SLAB IS POURED THE 2ND |
| | ELEVATION CERTIFICATE IS REQUIRED. W. P. B. |
| | ADMINISTRATIVE CODE 110.3 REQUIRED INSPECTIONS 1.2 |
| | FLOOR/ SLAB INSPECTION. IN FLOOD HAZARD AREAS, UPON |
| | PLACEMENT OF THE LOWEST FLOOR, INCLUDING BASEMENT, AND |
| | PRIOR TO FURTHER VERTICAL CONSTRUCTION, THE ELEVATION |
| | CERTIFICATION, REQUIRED IN SECTION 1612.5, SHALL BE |
| | SUBMITTED TO THE BUILDING OFFICIAL. |
| | |
| | (2) BEFORE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY |
| | OR A CERTIFICATE OF COMPLETION THE 3RD FLOOD ZONE |
| | CERTIFICATE IS REQUIRED WITH THE HEIGHT OF ALL EXTERIOR |
| | ATTENDANTS A/C PADS OR OTHER SLABS FOR GENERATORS. |
| | W. P. B. ADMINISTRATIVE CODE 110.3 REQUIRED INSPECTIONS |
| | (6) FINAL INSPECTION. TO BE MADE AFTER THE BUILDING IS |
| | COMPLETED AND READY FOR OCCUPANCY. 6.1. LOWEST FLOOR |
| | ELEVATION. IN FLOOD HAZARD AREAS, AS PART OF THE FINAL |
| | INSPECTION, A FINAL CERTIFICATION OF THE LOWEST FLOOR |
| | ELEVATION SHALL BE SUBMITTED TO THE AUTHORITY HAVING |
| | JURISDICTION. |
| | |
| | |