Plan Review Notes
Plan Review Notes For Permit 20060772
Permit Number 20060772
Review Stop G
Sequence Number 1
Notes
Date Text
2020-08-13 17:12:2008/13/2019 2ND GAS/ REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
  
 1. PE PIPE SHALL BE INSTALLED OUTDOOR ONLY IT SHALL NOT
 BE USED WITHIN OR UNDER ANY SLAB PER THE 2017 FC SEC.
 404.17.1. THE METHOD PROVIDED IS NOT APPROVED, THE
 PROHIBITION ON PIPING WITHIN A SLAB IS APPLICABLE TO
 ALL SLABS WITHOUT EXCEPTION.
  
 2. ON SHEET 045 YOU HAVE A COMMENT UNDER NATURAL GAS,
 THIRD ON DOWN IT SHOULD SAY 2.0 PSI NOT 2.0 INCH W.C.
 PLEASE CHANGE PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 3. PLEASE PROVIDED A DETAILED BTU'S SCHEDULE FOR
 APPLIANCE AND LABEL EACH UNIT WITH MODEL TYPE
 ACCORDINGLY ON ISOMETRIC PAGE (LIST THE BTU LOAD OF
 EACH APPLIANCE AND THE TOTAL BTU LOAD ON THE SYSTEM)
 PER THE WPB AMENDMENTS TO THE FBC SEC.107.2.1
 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 4. PLEASE LABEL EACH TYPE OF PIPE ON ISOMETRIC PER THE
 WPB AMENDMENTS TO THE FBC SEC.107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 5. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2017 FBC RES.
 SECS. G2413.4.1, G2413.4.2.
  
 6. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS-STEEL TUBING (IF APPLICABLE) FOR
 EACH PIPE SIZE PER THE WPB AMENDMENTS TO THE FBC
 SEC.107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 7. SHOW THE LOCATION OF ALL MP (STEP-DOWN) REGULATORS.
 A LISTED SHUTOFF VALVE SHALL BE INSTALLED IMMEDIATELY
 AHEAD OF EACH MP REGULATOR PER THE 2017 FBC RES. SEC.
 G2420.4.
  
 8. A GAS GRILL IS LABELED FOR OUTSIDE USE AND IT SEEMS
 TO BE IN A COVERED PATIO, IF SO PLEASE PROVIDE
 MANUFACTURES RECOMMENDATION FOR A VENTILATION HOOD PER
 THE 2017 FBC RES. SEC. G2408.1.
  
 9. SHOW IN A DIAGRAM HOW THE VENTING DIAGRAMS FOR THE
 GAS GRILL IN A CABINET ON YOUR PLAN AND LOCATION AS PER
 MANUFACTURES SPECIFICATION PER THE 2017 SECTION 503 FBC
 FG.
  
 10. SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 PRESSURE REGULATORS. REGULATORS INSTALLED ON THE
 EXTERIOR OF THE BUILDING SHALL BE APPROVED FOR OUTDOOR
 INSTALLATION PER THE 2017 FBC RES. SEC. G2421.1.
  
 11. PLEASE SHOW ALL UNIONS IN FRONT OF REGULATOR 1? OF
 EITHER SIDE PER THE 2017 FBC RES. SEC G2421.2.
  
 12. PLEASE LABEL THE SHUTOFF VALVE ON GAS ISOMERIC PER
 THE 2017 FBC RES. SEC. G2401.1.3.
  
 13. SHOW DRIP LEG ON EQUIPMENT INSTALLED PER THE 2017
 FBC RES. SEC. G2419.2.
  
 14. A SUB GAS PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1.
  
 15. IF GAS UNITS REQUIRE CONDENSATE AND THEY NEED TO BE
 1' AWAY FROM STRUCTURE PER THE 2017 FBC SEC R318.5.
  
 16. SUBMIT ON THE HOUSE PLAN SHOWING THE LOCATION OF
 THE TANKLESS WATER HEATER AND THE LOCATION AND DISTANCE
 OF ANY OPERABLE DOORS OR WINDOWS IN RELATION TO THE
 WATER HEATER. THE LOCATION OF THE WATER HEATER SHALL
 COMPLY WITH THE MANUFACTURER'S INSTALLATION
 INSTRUCTIONS. THE HOUSE PLAN CAN BE HAND-DRAWN PER THE
 WPB AMENDMENTS TO THE FBC SEC. 107.2.1. INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved