| Plan Review Notes For Permit 20060313 |
| Permit Number |
20060313 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-06-25 14:57:07 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SIXTH EDITION (2017) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE PREFAB GENERATOR PAD ENGINEERING IS FOR THE 32 | | | KW GENERAC GENERATOR. THE PERMIT APPLICATION IS FOR A | | | 22KW GENERATOR. SUBMIT MATCHING DOCUMENTS. FBC 107 | | | | | | 2) THE GENERATOR PAD ENGINEERING IS REQUIRED TO BE | | | DIGITALLY SIGNED BY THE ENGINEER. FS 471 AND FAC 61G15 |
|