| 2020-07-06 08:37:33 | PLUMBING 1ST REVIEW COMMENTS. 20060062 |
| | 1) SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE |
| | MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM |
| | ITS PUMP CURVE AND THE SIMPLIFIED TOTAL DYNAMIC HEAD |
| | CALCULATION IS NO LONGER ALLOWED TO BE USED IN |
| | DETERMINING MAXIMUM SYSTEM FLOW RATE PER ANSI/APSP/ICC |
| | 7 - 2013 SECS. 4.4.9, 4.4.9.1. THE 2013 EDITION |
| | ADDRESSES FLOW RATE IN GALLONS PER MINUTE (GPM). IT |
| | REQUIRES THAT MAXIMUM SYSTEM FLOW RATE DOES NOT EXCEED |
| | THE LISTED MAXIMUM FLOW RATE OF THE SUCTION OUTLET |
| | FITTING ASSEMBLY (DRAIN COVER).THE TDH CALCULATIONS |
| | MUST INCLUDE ALL OF THE SYSTEM COMPONENTS INCLUDING |
| | SUCTION AND RETURN PIPING, FITTINGS, VALVES, HEATER, |
| | FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS EXCEPT |
| | THE PUMP. |
| | |
| | 2) SUBMIT TWO LEGIBLE COPIES OF THE POOL PUMP CURVE. |
| | IDENTIFY ON THE PUMP CURVE WHICH CURVE KEY IS SPECIFIC |
| | TO THE PUMP BEING INSTALLED ON THIS POOL. THIS IS |
| | NEEDED TO CONFIRM THE MAXIMUM SYSTEM FLOW FROM THE TDH |
| | CALCULATIONS. ANSI/APSP/ICC 7 - 2013 SECS. 4.4.9, |
| | 4.4.9.1 |
| | |
| | 3) GENERAL SPEC FOR EQUIPMENT WAS SUBMITTED. INDICATE |
| | WHICH MODEL FOR EACH PIECE OF EQUIPMENT IS BEING USE ON |
| | THIS PROJECT. |
| | |
| | 4) PLEASE REMOVE THE COMMENT THAT AIR TEST IS AN |
| | APPROVED MEANS OF TEST. AIR TESTING IS PROHIBITED ON |
| | PVC PIPING. FBC-PLB 312.1 |
| | |
| | 5) WILL THERE BE A AUTOFILL ON THIS POOL? FBC 107.2.1 |
| | |
| | TIM HUNT |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | (CAP GOVERNMENT) |
| | [email protected] |
| | |