| Notes |
| Date |
Text |
| 2020-05-18 08:18:22 | 1) SHOW THE LOCATION OF ALL THE REGULATORS ON THE GAS | | | DRAWING. | | | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE GAS | | | REGULATORS. RREGULATORS INSTALLED ON THE EXTERIOR OF | | | BUILDINGS SHALL BE APPROVED FOR OUTDOOR INSTALLATION. | | | FBC-FUEL GAS SEC.410.1. | | | 3 ) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / | | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | | FBC-2017 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2017 | | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF | | | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. | | | 4) SHOW THE DISTANCE FROM EACH REGULATOR TO THE | | | APPLIANCE AND SIZE EACH LINE FROM THE REGULATOR TO THE | | | APPLIANCE. | | | 5) SUBMIT A FLOOR PLAN THAT SHOWS THE DISTANCE OF THE | | | TANKLESS WATER HEATERS TO ALL OPERABLE DOORS, WINDOWS | | | AND OTHER BUILDING OPENINGS. THE LOCATION OF THE | | | TANKLESS WATER HEATERS SHALL COMPLY WITH THE | | | MANUFACTURER'S INSTALLATION MANUAL. | | | 6) NOTE ON THE GAS RISER WHAT SIZING TABLES ARE BEING | | | USED FOR THE DESIGN OF THE LOW PRESSURE SYSTEM FOR THE | | | CSST AND SCH. 40 PIPE. | | | | | | NOTE: ACCORDING TO CITY RECORDS, A GAS PLAN REVIEW WAS | | | NEVER DONE ON THE MASTER PERMIT AS THERE WAS NO GAS | | | DRAWING SUBMITTED. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | | | | |
|