| Date |
Text |
| 2020-08-29 13:04:34 | IN SIZING A GAS LINE FOR THE ADDITION OF A NEW |
| | APPLIANCE WE MUST LOOK AT THE EXISTING GAS SYSTEM. IF |
| | WE CHANGE THE GAS PIPING SYSTEM WE MUST MAKE SURE THAT |
| | THE ENTIRE SYSTEM CAN CONTINUE TO OPERATE CORRECTLY. WE |
| | CANNOT JUST TIE INTO AN EXISTING GAS LINE WITHOUT |
| | RESIZING THE ENTIRE SYSTEM. BELOW IS A LIST OF ITEMS |
| | THAT MUST BE INCLUDED IN THE SUBMITTALS FOR AN ADDITION |
| | OF AN APPLIANCE TO AN EXISTING GAS LINE. |
| | |
| | 1) PROVIDE THE EXISTING SYSTEMS OPERATING PRESSURE. |
| | |
| | 2) IF NEEDED TO UPGRADE THE OPERATING PRESSURE, PLEASE |
| | PROVIDE NEW OPERATING PRESSURE OF SYSTEM. |
| | |
| | 3) PROVIDE THE NEW LONGEST LENGTH USED TO SIZE THE |
| | ENTIRE GAS SYSTEM. |
| | |
| | 4) PROVIDE THE GAS TABLES THAT WERE USED TO SIZE THE |
| | ENTIRE GAS SYSTEM. |
| | |
| | 5) PROVIDE A CLEAR DIAGRAM SHOWING THE ATTACHMENT POINT |
| | WHERE THE NEW LINE CONNECTS TO THE EXISTING GAS LINE. |
| | PLEASE KEEP IN MIND THAT THE PIPING FROM THE GAS METER |
| | TO THIS CONNECTION POINT MUST BE SIZED FOR THE ENTIRE |
| | GAS SYSTEM, INCLUDING BOTH THE EXISTING GAS LINE AND |
| | THE NEW GAS LINE TO THE NEW APPLIANCE. |
| | |
| | 6) PROVIDE A LEGIBLE DRAWING SHOWING EACH APPLIANCE, |
| | PIPE SIZES, TYPE OF MATERIAL FOR PIPING, DISTANCES, |
| | SHUT OFF VALVES AND REGULATORS. THE DRAWING MUST |
| | INCLUDE CUSTOMERS NAME AND ADDRESS OF PROJECT. THE |
| | DESIGNER OF THE SYSTEM MUST SIGN AND DATE EACH DRAWING. |
| | |
| | 7) PROVIDE SPEC SHEETS FOR ALL NEW APPLIANCES WITH THE |
| | BTU?S OF EACH APPLIANCE CLEARLY MARKED. |
| | |
| | 8) PROVIDE SPEC SHEETS FOR NEW REGULATORS INSTALLED. |
| | FBC FS 107.2.1 |
| | |
| | MICHAEL EDWARDS |
| | MECHANICAL EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL. 33401 |
| | 561-805-6728 |
| | [email protected] |
| | |