| 2020-04-28 19:12:40 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | ELEVATION CERTIFICATE COMMENTS |
| | |
| | 1) THE LATITUDE AND LONGITUDE SPECIFIED ON THE |
| | ELEVATION CERTIFICATE IS NOT CORRECT. THE COORDINATES |
| | PROVIDED ARE FOR A POINT OFF THE COAST OF MIAMI. PLEASE |
| | CORRECT. FBC 107.1.2 |
| | |
| | 2) THE COMMENT SECTION SHOULD REFERENCE THE |
| | FLOODPROOFING CERTIFICATE. |
| | |
| | FLOODPROOFING CERTIFICATE COMMENTS |
| | |
| | 1) THE LAYOUT OF THE REVISED FLOODPROOFING CERTIFICATE |
| | THAT WAS SUBMITTED HAS THE MAP INFORMATION FROM THE |
| | PREVIOUS FIRM WITH THE BFE SPECIFIED IN NAVD 88. THE |
| | CURRENT MAP INFORMATION AND BFE (NAVD 88) SHOULD BE |
| | USED IN ORDER TO BE CONSISTANT WITH THE ELEVATION |
| | CERTIFICATE. A COPY OF THE FINAL FORM WITH O.M.B. |
| | APPROVAL IS REQUIRED. |
| | |
| | FLOODPROOFING CERTIFICATE FOR NON-RESIDENTIAL |
| | STRUCTURES |
| | INSTRUCTIONS FOR COMPLETING THE FLOODPROOFING |
| | CERTIFICATE FOR NON-RESIDENTIAL STRUCTURES |
| | TO RECEIVE CREDIT FOR FLOODPROOFING, A COMPLETED |
| | FLOODPROOFING CERTIFICATE FOR NON-RESIDENTIAL |
| | STRUCTURES IS REQUIRED FOR NON-RESIDENTIAL AND BUSINESS |
| | BUILDINGS IN THE REGULAR PROGRAM COMMUNITIES, LOCATED |
| | IN ZONES A1- A30, AE, AR, AR DUAL, AO, AH, AND A WITH |
| | BFE. |
| | IN ORDER TO ENSURE COMPLIANCE AND PROVIDE REASONABLE |
| | ASSURANCE THAT DUE DILIGENCE HAD BEEN APPLIED IN |
| | DESIGNING AND CONSTRUCTING FLOODPROOFING MEASURES, THE |
| | FOLLOWING INFORMATION MUST BE PROVIDED WITH THE |
| | COMPLETED FLOODPROOFING CERTIFICATE: |
| | 1- PHOTOGRAPHS OF SHIELDS, GATES, BARRIERS, OR |
| | COMPONENTS DESIGNED TO PROVIDE FLOODPROOFING PROTECTION |
| | TO THE STRUCTURE. |
| | 2- WRITTEN CERTIFICATION THAT ALL PORTIONS OF THE |
| | STRUCTURE BELOW THE BFE THAT WILL RENDER IT WATERTIGHT |
| | OR SUBSTANTIALLY IMPERMEABLE TO THE |
| | PASSAGE OF WATER AND MUST PERFORM IN ACCORDANCE WITH |
| | TITLE 44 CODE OF FEDERAL REGULATIONS (44 CFR 60.3 |
| | (C)(3)). |
| | 3- A COMPREHENSIVE MAINTENANCE PLAN FOR THE ENTIRE |
| | STRUCTURE TO INCLUDE BUT NOT LIMITED TO: |
| | 4- EXTERIOR ENVELOPE OF THE STRUCTURE |
| | 5- ALL PENETRATIONS TO THE EXTERIOR OF THE STRUCTURE |
| | 6- ALL SHIELDS, GATES, BARRIERS, OR COMPONENTS DESIGNED |
| | TO PROVIDE FLOODPROOFING PROTECTION TO THE STRUCTURE |
| | 7- ALL SEALS OR GASKETS FOR SHIELDS, GATES, BARRIERS, |
| | OR COMPONENTS |
| | 8- LOCATION OF ALL SHIELDS, GATES, BARRIERS, AND |
| | COMPONENTS AS WELL AS ALL ASSOCIATED HARDWARE, AND ANY |
| | MATERIALS OR |
| | SPECIALIZED TOOLS NECESSARY TO SEAL THE STRUCTURE. |