| 2020-05-14 16:36:42 | 2ND REVIEW FBC-2017 FUEL GAS |
| | PERMIT #20040366 |
| | 5/14/2020 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED |
| | BASED ON THE RESUMBITTED PLANS AND THE NARRATIVE |
| | RESPONSES BY THE ENGINEER OF RECORD, THE 1ST REVIEW |
| | COMMENTS LISTED BELOW WILL BE MARKED AS PASSED OR |
| | FAILED. |
| | |
| | 1) FAILED. GAS DRAWING DOES NOT SHOW TOTAL DEVELOPED |
| | LENGTH OF THE SYSTEM, TYPE OF PIPINGS, TOTAL BTUH GAS |
| | LOAD OF THE SYSTEM, CUT LENGTHS OF PIPINGS, DELIVERY |
| | PRESSURES AT THE METER AND AT REGULATORS, GAS PIPE |
| | SIZING TABLES, LOCATIONS OF DRIP LEGS, UNIONS. PROVIDE |
| | A GAS ISOMETRIC DRAWING THAT SHOWS THE TYPE AND |
| | DIAMETERS OF PIPING, THE MEASUREMENTS OF EACH CUT |
| | LENGTH OF PIPE, THE TOTAL DEVELOPED LENGTH OF THE |
| | PIPING RUN FROM THE POINT OF DELIVERY AT THE METER TO |
| | THE MOST REMOTE OUTLET IN THE BUILDING AND TO THE |
| | BOILERS; GAS DELIVERY PRESSURE OF THE SYSTEM AT THE |
| | METER AND AT EACH STEPDOWN REGULATOR; LOCATIONS OF |
| | REQUIRED SHUTOFF VALVES, AND THE BTUH LOADS OF THE NEW |
| | BOILERS, AND ALL OTHER GAS-FIRED APPLIANCES AND |
| | EQUIPMENT BEING SERVED BY THE SYSTEM- SECTIONS 402.2 |
| | AND 402.3 FBC FG. PLEASE INDICATE WHICH PIPE SIZING |
| | TABLES WERE USED IN THE DESIGN- SECTION 402.3. |
| | A) FAILED. CONCERNING THE REGULATORS PLEASE REFER TO |
| | SECTIONS 410.1, 410.2, & 410.3 FBC FG FOR LINE AND MP |
| | REGULATOR INSTALLATION AND VENTING REQUIREMENTS. PLEASE |
| | VERIFY SUBMITTALS ARE COMPLIANT AND SHOW ALL REGULATOR |
| | AND SHUTOFF VALVES IN THE ISOMETRIC DRAWING, AND |
| | REGULATOR VENT RUNS AND TERMINATION LOCATIONS WHERE |
| | REQUIRED. |
| | |
| | 2) PASSED-DEFERRED SUBMITTALS. PROVIDE A SUBMITTAL |
| | PACKAGE THAT INCLUDES MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION GUIDELINES FOR THE BOILERS, PUMPS, |
| | EXPANSION TANK, CONTROL VALVES, RELIEF VALVES, CHEMICAL |
| | FEEDER, CHEMICAL NEUTRALIZERS, VENT FLUE AND VENT CAP, |
| | COMBUSTION AIR DUCTS, GAS AND HYDRONIC PIPING, AND THE |
| | GAS REGULATORS AND SHUT OFF VALVES- SECTION 107.2.1 |
| | WPB. REVIEW ALL REQUIRED COMPLIANCES AND UL LISTINGS |
| | FOR THE PRODUCTS AS NOTED ON THE SPECIFICATIONS SHEETS |
| | M101, 102, & 103 AS THEY WILL BE CROSS CHECKED IN THE |
| | 2ND REVIEW. THE DESIGN PROFESSIONAL OF RECORD SHALL |
| | PROVIDE APPROVAL STAMPS ON EACH SUBMITTAL DOC, OR |
| | PROVIDE A STAMPED COVER PAGE WITH AN INDEX LISTING ALL |
| | PRODUCT SUBMITTALS. |
| | |
| | A) PASSED-DEFERRED SUBMITTALS. PLEASE NOTE THE GAS |
| | BOILER SPECIFICATIONS SHALL INDICATE THAT THE UNITS ARE |
| | LISTED IN ACCORDANCE WITH THE REQUIREMENTS OF ANSI |
| | Z21.13 OR UL 795, AND DESIGNED AND CONSTRUCTED IN |
| | ACCORDANCE WITH THE REQUIREMENTS OF ASME CSD-1 AND AS |
| | APPLICABLE, THE ASME BOILER AND PRESSURE VESSEL CODE, |
| | SECTIONS I, II, IV, V AND IX AND NFPA 85- SECTION 631.1 |
| | FBC FG AND SECTION 1004.1 FBC M |
| | |
| | 3) FAILED. REFER TO SECTIONS 406.4, THROUGH 406.6 FBC |
| | FG AND PROVIDE A GAS PIPING TESTING PROCEDURE ON THE |
| | PLAN. |
| | |
| | 4) MECH COMMENT #9) FAILED. A) THE VENT SIZING |
| | CALCULATIONS WERE NOT PROVIDED- SECTION 501.14 FBC FG. |
| | B) SHEETS M-301 & M-903 SHOW THE VENT FLUE FREESTANDING |
| | ABOVE THE ROOF. SHEET M-501 INDICATES THE VENT TO BE IN |
| | A CHIMNEY ENCLOSURE- WHICH IS IT? , IF THE VENT IS |
| | FREESTANDING, SHOW THE ACTUAL HEIGHT OF THE VENT FLUE |
| | ABOVE THE ROOF AND PROVIDE ENGINEERING FOR ANCHORING |
| | THE FLUE TO THE ROOF STRUCTURE TO RESIST WIND |
| | PRESSURES- SECTION 301.15- FBC M. C) INDICATE THE |
| | REQUIRED CLEARANCE FROM THE VENT PENETRATION TO THE |
| | COMBUSTIBLE ROOFING MATERIAL. D) PROVIDE A SUBMITTAL |
| | FOR THE VENT FLUES AND COMBUSTION AIR DUCTS OR REQUEST |
| | DEFERRED. PROVIDE A VENT FLUE DIAGRAM THAT SHOWS THE |
| | LENGTHS OF THE CONNECTORS, HORIZONTAL AND VERTICAL RUN |
| | LENGTHS, TOTAL RUN LENGTH OF THE SYSTEM, AND LOCATIONS |
| | OF OFFSETS, FITTINGS ETC. PER THE NOTES ON SHEET M102 |
| | THE PROPOSED SYSTEM REQUIRES ENGINEERED SIZING |
| | CALCULATIONS WHICH SHALL ACCOMPANY THE VENTING DIAGRAM- |
| | SEE SECTION 506.6.9.3 FBC FG. PLEASE INDICATE THE |
| | "VENTING APPLIANCE CATEGORY" - I, II, III, OR IV THAT |
| | THE SYSTEM IS BEING DESIGNED FOR, AND IF THE SYSTEM IS |
| | POSITIVE OR NEGATIVE AND PRODUCES CONDENSATION- SEE |
| | SECTION 202 FBC FG. CURRENTLY, A THOROUGH REVIEW OF THE |
| | SYSTEM CANNOT BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND |
| | ADDITIONAL SPECIFICATIONS AND INFORMATION- SECTION |
| | 107.2.1 WPB. PLEASE REFER BACK TO COMMENT #1 FOR |
| | SUBMITTAL REQUIREMENTS AND REQUIRED UL LISTING AND |
| | LABELING. A) M502: REFER TO SECTION 503.8 FBC FG AND |
| | SHOW THE REQUIRED CLEARANCES FROM THE VENT FLUE |
| | TERMINATION TO MECHANICAL AND GRAVITY AIR INTAKES OR |
| | ANY OPERABLE OPENINGS INTO THE BUILDING. |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |