| Date |
Text |
| 2020-04-13 13:47:10 | 1ST REVIEW FBC-2017 MECHANICAL |
| | PERMIT #20040366 |
| | 4/142020 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED |
| | |
| | 1) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES |
| | MANUFACTURER'S SPECIFICATIONS AND INSTALLATION |
| | GUIDELINES FOR THE BOILERS, PUMPS, EXPANSION TANK, |
| | CONTROL VALVES, RELIEF VALVES, CHEMICAL FEEDER, |
| | CHEMICAL NEUTRALIZERS, VENT FLUE AND VENT CAP, |
| | COMBUSTION AIR DUCTS, GAS AND HYDRONIC PIPING, AND THE |
| | GAS REGULATORS AND SHUT OFF VALVES- SECTION 107.2.1 |
| | WPB. REVIEW ALL REQUIRED COMPLIANCES AND UL LISTINGS |
| | FOR THE PRODUCTS AS NOTED ON THE SPECIFICATIONS SHEETS |
| | M101, 102, & 103 AS THEY WILL BE CROSS CHECKED IN THE |
| | 2ND REVIEW. THE DESIGN PROFESSIONAL OF RECORD SHALL |
| | PROVIDE APPROVAL STAMPS ON EACH SUBMITTAL DOC, OR |
| | PROVIDE A STAMPED COVER PAGE WITH AN INDEX LISTING ALL |
| | PRODUCT SUBMITTALS. |
| | |
| | A) PLEASE NOTE THE GAS BOILER SPECIFICATIONS SHALL |
| | INDICATE THAT THE UNITS ARE LISTED IN ACCORDANCE WITH |
| | THE REQUIREMENTS OF ANSI Z21.13 OR UL 795, AND DESIGNED |
| | AND CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF |
| | ASME CSD-1 AND AS APPLICABLE, THE ASME BOILER AND |
| | PRESSURE VESSEL CODE, SECTIONS I, II, IV, V AND IX AND |
| | NFPA 85- SECTION 631.1 FBC FG AND SECTION 1004.1 FBC M. |
| | |
| | B) COMMISSIONING OF THE BOILERS WILL REQUIRED AS NOTED |
| | UNDER ITEM 3.05 ON SHEET M103 WHICH LISTS THE AIR AND |
| | WATER TESTING AND BALANCING. COPIES OF THE TESTING |
| | REPORTS WILL BE REQUIRED FOR FINAL MECHANICAL APPROVAL- |
| | SECTION C408.2 FBC EC. |
| | |
| | C) THE BOILER SPECIFICATIONS SHALL INDICATE THAT THE |
| | UNITS HAVE BEEN TESTED OR WILL BE TESTED TO A MAXIMUM |
| | LEVEL OF 50 PPM OF CARBON MONOXIDE PER OSHA GUIDELINES- |
| | SECTION 1004.2.1 FBC M. |
| | |
| | 2) SHEET M401: PROVIDE THE EFFICIENCY RATINGS OF THE |
| | BOILERS IN THE EQUIPMENT SCHEDULES- SEE TABLE 404,2 FBC |
| | EC. |
| | |
| | 3) M401: VERIFY THE BOILER SERVICE WATER SYSTEM WILL BE |
| | CAPABLE OF AUTOMATIC TEMPERATURE RESET AND AUTOMATIC |
| | VARAIBLE FLUID FLOW- SEE SECTION C403.4.2.2 FBC EC. |
| | |
| | 4) M401: INDICATE THE BOILER TURNDOWN RATIO AS REQUIRED |
| | BYU SECTION C403.4.2.5 FBC EC. |
| | |
| | 5) PLEASE PROVIDE FRONT AND TOP VIEW DRAWINGS OR |
| | DIAGRAMS OF THE BOILERS THAT SHOW A) REQUIRED WORKING |
| | CLEARANCES AS NOTED IN SECTIONS 1004.3 & 1004.3.1 FBC |
| | M. B) POTABLE WATER SUPPLY PIPING CONNECTION AND |
| | LOCATION OF BACKFLOW PREVENTERS AND SHUTOFF VALVES- |
| | SECTIONS 1005.1 & 1005.2. C) WATER DISTRIBUTION PIPING |
| | AND CONNECTIONS AND VALVE LOCATIONS- 1005.2 D) |
| | LOCATIONS AND CONNECTIONS OF SAFETY RELIEF VALVES, |
| | PRESSURE RELIEF VALVES, DISCHARGE PIPING AND DISCHARGE |
| | LOCATIONS- SECTIONS 1006.2,1006.3, 1006.4, 1006.5, |
| | 1006.6, AND 1006.7. E) LOCATION OF THE EXPANSION TANK- |
| | SECTION 1009 FBC M. E) CONNECTION LOCATIONS OF THE GAS |
| | PIPING AND REGULATOR, COMBUSTION AIR DUCTS, AND VENT |
| | DUCT- SECTION 107.2.1 WPB. |
| | |
| | 6) SHEET M501: SHOW THE LOCATION OF THE REQUIRED FLOOR |
| | DRAIN FOR THE BOILERS- SECTION 1004.6 FBC M. |
| | |
| | 7) M501: SHOW THE GAS PIPING RUN INTO THE BOILER ROOM- |
| | SECTION 107.2.1 WPB. |
| | |
| | 8) PROVIDE A GAS ISOMETRIC DRAWING THAT SHOWS THE TYPE |
| | AND DIAMETERS OF PIPING, THE MEASUREMENTS OF EACH CUT |
| | LENGTH OF PIPE, THE TOTAL DEVELOPED LENGTH OF THE |
| | PIPING RUN FROM THE POINT OF DELIVERY AT THE METER TO |
| | THE MOST REMOTE OUTLET IN THE BUILDING AND TO THE |
| | BOILERS; GAS DELIVERY PRESSURE OF THE SYSTEM AT THE |
| | METER AND AT EACH STEPDOWN REGULATOR; LOCATIONS OF |
| | REQUIRED SHUTOFF VALVES, AND THE BTUH LOADS OF THE NEW |
| | BOILERS, AND ALL OTHER GAS-FIRED APPLIANCES AND |
| | EQUIPMENT BEING SERVED BY THE SYSTEM- SECTIONS 402.2 |
| | AND 402.3 FBC FG. PLEASE INDICATE WHICH PIPE SIZING |
| | TABLES WERE USED IN THE DESIGN- SECTION 402.3. |
| | A) CONCERNING THE REGULATORS PLEASE REFER TO SECTIONS |
| | 410.1, 410.2, & 410.3 FBC FG FOR LINE AND MP REGULATOR |
| | INSTALLATION AND VENTING REQUIREMENTS. PLEASE VERIFY |
| | SUBMITTALS ARE COMPLIANT AND SHOW ALL REGULATOR AND |
| | SHUTOFF VALVES IN THE ISOMETRIC DRAWING, AND REGULATOR |
| | VENT RUNS AND TERMINATION LOCATIONS WHERE REQUIRED. |
| | |
| | 9) PROVIDE A VENT FLUE DIAGRAM THAT SHOWS THE LENGTHS |
| | OF THE CONNECTORS, HORIZONTAL AND VERTICAL RUN LENGTHS, |
| | TOTAL RUN LENGTH OF THE SYSTEM, AND LOCATIONS OF |
| | OFFSETS, FITTINGS ETC. PER THE NOTES ON SHEET M102 THE |
| | PROPOSED SYSTEM REQUIRES ENGINEERED SIZING CALCULATIONS |
| | WHICH SHALL ACCOMPANY THE VENTING DIAGRAM- SEE SECTION |
| | 506.6.9.3 FBC FG. PLEASE INDICATE THE "VENTING |
| | APPLIANCE CATEGORY" - I, II, III, OR IV THAT THE SYSTEM |
| | IS BEING DESIGNED FOR, AND IF THE SYSTEM IS POSITIVE OR |
| | NEGATIVE AND PRODUCES CONDENSATION- SEE SECTION 202 FBC |
| | FG. CURRENTLY, A THOROUGH REVIEW OF THE SYSTEM CANNOT |
| | BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND ADDITIONAL |
| | SPECIFICATIONS AND INFORMATION- SECTION 107.2.1 WPB. |
| | PLEASE REFER BACK TO COMMENT #1 FOR SUBMITTAL |
| | REQUIREMENTS AND REQUIRED UL LISTING AND LABELING. A) |
| | M502: REFER TO SECTION 503.8 FBC FG, AND SHOW THE |
| | REQUIRED CLEARANCES FROM THE VENT FLUE TERMINATION TO |
| | MECHANICAL AND GRAVITY AIR INTAKES OR ANY OPERABLE |
| | OPENINGS INTO THE BUILDING. |
| | |
| | 10) PROVIDE A COMBUSTION AIR DUCT DIAGRAM THAT SHOWS |
| | THE LENGTHS OF THE CONNECTORS, HORIZONTAL AND VERTICAL |
| | RUN LENGTHS, TOTAL RUN LENGTH OF THE SYSTEM, AND |
| | LOCATIONS OF OFFSETS, FITTINGS ETC.- SECTION 304.1 AND |
| | 304.11 FBC FG. CURRENTLY, A THOROUGH REVIEW OF THE |
| | SYSTEM CANNOT BE ACCOMPLISHED WITHOUT THE DIAGRAM, AND |
| | ADDITIONAL SPECIFICATIONS AND INFORMATION- SECTION |
| | 107.2.1 WPB. PLEASE REFER BACK TO COMMENT #1 FOR |
| | SUBMITTAL REQUIREMENTS AND REQUIRED UL LISTING AND |
| | LABELING. |
| | |
| | 11) M201: THE SCOPE OF WORK NOTES INDICATE DEMOLITION |
| | OF AIR CONDITIONING UNITS, DUCTS, TERMINAL BOXES ETC. |
| | HOWEVER THE DRAWINGS TO NOT SHOW ANY AC DEMOLITION OR |
| | REWORK. PLEASE PROVIDE THE DRAWINGS- SECTION 107.2.1 |
| | WPB. |
| | |
| | 12) M401: PLEASE PLACE A NOTE THAT THE WELDER'S |
| | CETIFICATES AND WELDING PROCEDURES SHALL BE ONSITE AT |
| | TIME OF INSPECTION- SECTION 107.2.1 WPB. |
| | |
| | 13) PROVIDE UL LISTED FIRE STOPPING ASSEMBLIES FOR THE |
| | PENETRATIONS OF THE VENT FLUE, AND COMBUSTION AIR DUCTS |
| | HROUGH THE FIRE RATED WALLS AND FLOOR CEILING |
| | ASSEMBLIES- SECTION 714 FBC B. |
| | |
| | 14) INDICATE THE TYPE AND THICKNESSES OF THE BOILER |
| | SERVICE WATER PIPING INSULATIONS AND PROVIDE A PRODUCT |
| | SUBMITTAL- SEE TABLE C403.2.10 FBC EC. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |