| Plan Review Notes For Permit 20040233 |
| Permit Number |
20040233 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-04-23 10:39:01 | SFR ADDITION | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PLEASE SHOW ROOF SLOPE TO COMPLY WITH FBC R905.9.1 | | | 2) SURVEY PROVIDED NEEDS TO BE ELECTRONICALLY SIGNED BY | | | THE SURVEYOR TO BE USED IN ELECTRONIC PLAN REVIEW. | | | 3) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT | | | (GEOTECHNICAL REPORT) FROM AN ARCHITECT OR ENGINEER FOR | | | THE SOIL BEARING CAPACITY. FBC R401.4 | | | 4) IN THE ROOFING PRODUCT APPROVALS - PLEASE CIRCLE THE | | | PRODUCTS TO BE USED, THE ROOFING SYSTEMS TO BE USED | | | ETC.. PLEASE PROVIDE SIGNED AND SEALED ADDITIONAL | | | ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR | | | ROOFING ZONES 2 AND 3 WHICH MAY REQUIRE HIGHER | | | PRESSURES THAN THE PRODUCT APPROVAL ROOFING SYSTEM | | | USED. (SEE PRODUCT APPROVALS). | | | 5) PLEASE PROVIDE THE FRONT PAGES FOR THE OVERHEAD DOOR | | | PRODUCT APPROVAL. | | | 6) PLEASE SHOW ALL ROOF SLOPES. | | | |
|