| 2020-04-10 13:43:40 | 1) THE SURVEY SHOWS A NEW GAS METER BUT THE GAS |
| | APPLICATION STATES THAT THE GENERATOR WILL BE |
| | CONNECTING TO AN EXISTING GAS LINE. CLARIFY. IF A NEW |
| | METER IS TO BE INSTALLED THE DESCRIPTION OF WORK ON THE |
| | GAS SUB APPLICATION SHALL BE REVISED. WPB AMEND. TO FBC |
| | SEC. 107.2.1. |
| | 2) THE GAS PLAN CALLS OUT A TEE ON THE GAS LINE BUT NO |
| | TEE IS SHOWN. CLARIFY. |
| | 3) A SHUTOFF VALVE IS REQUIRED IMMEDIATELY UPSTREAM OF |
| | THE GAS REGULATOR. THE GAS RISER SHOWS IT DOWNSTREAM. |
| | 2017 FBC-FUEL GAS SEC.409.4. |
| | 4) SUBMIT MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR |
| | THE REGULATOR. 2017 FBC-FUEL GAS SEC. 410.1. |
| | 5) THE PLANS INDICATE AN EXISTING GAS METER AND CITY |
| | RECORDS SHOW AN EXISTING GAS SYSTEM FOR THIS ADDRESS. |
| | THE BTU LOAD OF THE EXISTING GAS SYSTEM MUST BE ADDED |
| | INTO THE TOTAL BTU LOAD ON THE SYSTEM TO ENSURE THE |
| | EXISTING SYSTEM IS PROPERLY SIZED. IF UNDERSIZED, THE |
| | EXISTING SYSTEM MUST BE REDONE TO ENSURE A SAFE |
| | OPERATING SYSTEM. SUBMIT A GAS PIPING RISER DIAGRAM |
| | THAT SHOWS THE TYPE OF THE EXISTING APPLIANCES THE BTU |
| | LOAD OF EACH APPLIANCE, THE PIPE SIZE AND TYPE OF PIPE |
| | TO EACH APPLIANCE, AND THE DISTANCE OF THE LONGEST |
| | LENGTH OF PIPING FROM THE POINT OF DELIVERY TO THE MOST |
| | REMOTE OUTLET AND THE LOAD OF THE SECTION. NOTE: IF THE |
| | EXISTING SYSTEM IS LESS THAN A 2 PSI SYSTEM AND THE |
| | SYSTEM PRESSURE IS INCREASED TO 2 PSI, A LINE PRESSURE |
| | REGULATOR IS REQUIRED AT ALL THE EXISTING APPLIANCES. |
| | FGC SECS. 401.4, 401.8, 402.1, 402.2, 402.3 OR FBCR |
| | SECS.G2412.4, G2412.8, G2413.1, G2413.2, G2413.3. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |