| Date |
Text |
| 2020-04-10 10:42:40 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SIXTH EDITION (2017) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) IF SUBMITTING PAPER DOCUMENTS, THEN SUBMIT A WIND |
| | LOAD CHART WITH THE ENGINEER'S ORIGNAL SEAL AND |
| | SIGNATURE. IF SUBMITTING ELECTRONICALLY THE ENGINEER'S |
| | DIGITAL SIGNATURE IS REQUIRED. FAC 61G15-23.003 |
| | |
| | 2) SUBMIT A DRAWING THAT SHOWS THE LOCATION OF THIS |
| | UNIT IN THE BUILDING. IS IT AN END UNIT,ETC? IT IS |
| | NUMBERED 201, IS IT ON THE SECOND FLOOR? ARE ANY OF THE |
| | OPENINGS LOCATED IN THE CORNERS (ZONE 5) ? FBC 107.2.1 |
| | |
| | 3) THIS IS A FOUR STORY BUILDING AND THE PRESSURES |
| | INDICATED ARE FOR A BUILDING HEIGHT OF 15 FEET. YOU |
| | NEED TO USE THE PRESSURES FOR A FOUR STORY BUILDING. |
| | FBC CHAPTER 16 |
| | |
| | 4) I DON'T KNOW WHAT THE SHUTTER GLASS SEPARATION THAT |
| | YOU FILLED IN ON THE SHUTTER SCHEDULE OF 21/8 AND 27/8 |
| | MEANS. THE PRODUCT APPROVAL HAS 3" GLASS SEPARATION. |
| | FBC 107.2.1 |
| | |
| | 5) THE SUBSTRATE COLUMN WAS LEFT BLANK ON THE SHUTTER |
| | SCHEDULE. THIS IS NEEDED TO DETERMINE THE ANCHOR TYPE |
| | TO USE IN THE ANCHOR SPACING TABLES ON PAGES 13 AND 14 |
| | OF THE PRODUCT APPROVAL. FBC 107.2.1 |
| | |
| | 6) ON THE SHUTTER SCHEDULE UNDER SHUTTER MOUNTING 3A IS |
| | LISTED. THERE IS NO MOUNT TYPE 3A IN THE ANCHOR SPACING |
| | TABLES. INDICATE THE MOUNT TYPE THAT CORRESPONDS WITH |
| | THE ANCHOR SPACING TABLES IN THE PRODUCT APPROVAL ON |
| | THE SHUTTER SCHEDULE. |
| | |
| | 7) CIRCLE THE ITEMS IN THE ANCHOR SPACING TABLES THAT |
| | ARE APPLICABLE TO YOUR PROJECT. FBC 107.2.1 |
| | |
| | |
| | |
| | |