Plan Review Notes
Plan Review Notes For Permit 20031138
Permit Number 20031138
Review Stop P
Sequence Number 1
Notes
Date Text
2020-03-31 17:28:0203/31/20 1ST PLUMBING REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. IS THE TANKLESS ELECTRIC OR GAS AND IF IT IS GOING
 OUTSIDE ELECTRIC, THEY SHOULD BE RATED FOR OUTSIDE
 ELEMENTS WHICH MOST ARE NOT. IF YOU PLAN ON PUTTING IT
 IN AS CASE TO PROTECT IT FROM THE ELEMENTS IT NEEDS TO
 BE APPROVED BY THE MANUFACTURE AND PLEASE SUBMIT
 SPECIFICATIONS FOR UNIT AND OR CASE PER THE WPB
 AMENDMENTS TO THE FBC SEC. 107.2.1 INFORMATION ON
 CONSTRUCTION DOCUMENTS.
  
 2. ON P-3 THE ISOMETRIC ON TOILET AND SHOWER HAS NO
 VENT FOR THE P-TRAP PLEASE WYE OFF BEFORE TOILET TO
 PICK UP LABORATORY AWAY FROM THE WET VENT BATHROOM
 GROUP PER THE 2017 FBC R 3101.2.1.
  
 3. ON P-3 THE ISOMETRIC IT SHOWS A WASHING MACHINE
 WITHOUT NO VENT AND IT MUST RUN A 3? DRAIN LINE PER
 MOST MANUFACTURES SPECIFICATION UNITS. YOU MAY USE AN
 AIR ADMITTANCE VALVE, BUT IT MUST BE A 3? LINE AS WELL
 PER MANUFACTURE SPECIFICATION ON A AIR ADMITTANCE VALVE
 USE PER THE 2017 FBC R 3114.2.
  
 4. THE WASHING MACHINE VALVE OR BOX MUST BE ACCESSIBLE
 WITHOUT MOVE THE UNITS SO PLEASE SHOW THE VALVES ON THE
 SIDE OF WALLS PER THE 2017 FBC R2903.9.3.
  
 5. BACKFLOW DEVICE REQUIRED PER THE CITY OF WEST PALM
 BEACH CROSS CONNECTION PROGRAM AS THIS IS CONSIDERED A
 DUAL DWELLING.
  
 6. A SEPARATE PERMIT AND APPLICATION ARE REQUIRED FOR
 BACKFLOW DEVICE BY A LICENSE CONTRACTOR IN A FORM OF A
 RPZ DEVICE AND CERTIFIED BY THE UTILITIES DEPARTMENT.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 6:30 AM 7:30 / 2:00 PM TO 5:00 PM
 [email protected]
 561-701-6437
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved