| Date |
Text |
| 2021-06-07 14:01:13 | NOTE: |
| | CHRISTINA WARR SEND ME EMAIL ON 06/03/21 LISTING |
| | SEVERAL PROJECTS, INCLUDING THIS ONE 20030974. THERE IS |
| | NOTHING NEW UPLOADED TO PROJECTDOX. CONTRACTOR NEEDS TO |
| | UPLOAD TO PROJECTDOX THE INFORMATION TO ADDRESS THE |
| | COMMENTS BY ALL THE PLAN REVIEWERS. |
| | NOTE: |
| | PROVIDE FDOT APPROVED PERMIT PACKAGE. IF THERE IS NOT |
| | FDOT APPROVED PERMIT PACKAGE THEN ALL THE BUILDING |
| | REVIEW COMMENTS APPLY. SEE COMMENTS BELOW. |
| | |
| | |
| | SECOND BUILDING REVIEW COMMENTS |
| | CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS. |
| | |
| | 1- APPLICATION WAS SUBMITTED AS AN ELECTRICAL PERMIT |
| | ONLY FOR THE INSTALLATION OF 100 AMP ELECTRICAL SERVICE |
| | TO SMALL CELL POLE. BASED ON THE INFORMATION SUBMITTED, |
| | IT LOOKS LIKE A COMMUNICATIONS PERMIT IS REQUIRED. CITY |
| | ORDINANCE NO. 4774-18. |
| | NOTE: PLEASE SEE ZONING AND ENGINEERING COMMENTS. |
| | |
| | RESPONSE. |
| | PLEASE SEE ZONING AND ENGINEERING COMMENTS. |
| | |
| | 2- TITLE SHEET T1 SPECIFIES "INSTALLATION OF PROPOSED |
| | POWER FOR SMALL CELL EQUIPMENT ON PROPOSED METAL POLE". |
| | SCOPE OF WORK IS NOT CLEAR. IS THERE A NEW METAL POLE |
| | OR IS IT EXISTING INSTALLED BY FPL.?. PLANS ALSO SHOW |
| | VERIZON WIRELESS ENCLOSURE ATTACHED TO THE POLE. THERE |
| | ARE NO SPECIFICATIONS FOR THE ATTACHMENT OF THIS |
| | ENCLOSURE TO THE POLE. IS THIS DONE UNDER ANOTHER |
| | PERMIT?. SEC. 107.2.1 CITY AMENDMENTS. |
| | PROVIDE PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR |
| | THE PROPOSED METAL POLE AND VERIZON WIRELESS ENCLOSURE |
| | ATTACHMENT IF THEY ARE PART OF THIS PERMIT. SEC. 1609.1 |
| | FBC-BUILDING. |
| | |
| | RESPONSE: |
| | A) IT IS NOT CLEAR IF A NEW POLE WILL BE INSTALLED OR |
| | NOT. IF NEW POLE IS INSTALLED, THEN PROVIDE COMPLETE |
| | ENGINEERING DETAILS AND SPECIFICATIONS, INCLUDING THE |
| | EFFECTIVE PROJECTIVE AREA OF THE POLE AND PROPOSED |
| | EQUIPMENT TO BE INSTALLED IN IT. |
| | PLANS ALSO SHOW VERIZON WIRELESS ENCLOSURES ATTACHED TO |
| | THE POLE. THERE ARE NO SPECIFICATIONS FOR THE |
| | ATTACHMENT OF THIS ENCLOSURES TO THE POLE. SEC. 1609.1 |
| | FBC-BUILDING. ALSO, PROVIDE ALL THE WIND DESIGN DATA AS |
| | REQUIRED BY SEC. 1603.4 FBC-BUILDING. |
| | |
| | B)PROVIDE POLE MANUFACTURER'S SPECS MEETING THE |
| | ENGINEER'S DESIGN CRITERIA. ENGINEER OF RECORD TO |
| | REVIEW/APPROVED POLE SPECS PRIOR TO SUBMITTAL. SEC. |
| | 107.3.4.1 CITY AMENDMENTS. |
| | |
| | |
| | 3- VALUATION DECLARED IN THE PERMIT APPLICATION IS LOW. |
| | VALUATION TO INCLUDE ALL LABOR, MATERIALS, CONTRACTOR'S |
| | OVERHEAD AND PROFIT AND DESIGN PROFESSIONAL FEES AS |
| | REQUIRED BY SEC. 109.3 CITY AMENDMENTS. UPDATE |
| | VALUATION AS REQUIRED, INCLUDING DESIGN PROFESSIONAL |
| | FEES. |
| | |
| | RESPONSE |
| | NOT ADDRESSED. SCOPE OF WORK IS NOT CLEAR. UNABLE TO |
| | DETERMINE VALUE. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| | QUESTIONS REGARDING THESE COMMENTS, |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |
| | |
| | |
| | |