2022-01-03 16:25:11FAILED
  
 1) THE SUBMITTED COMMUNICATION FACILITY PLACEMENT
 PERMIT - CITY RIGHTS-OF-WAY MUST BE APPROVED PRIOR TO
 THIS PERMIT BEING APPROVED. SOME OF THE COMMENTS BELOW
 ARE INCLUDED ON THE PLACEMENT PERMIT REVIEW AS WELL AS
 WITH THIS PERMIT.
  
 2) THE SURVEY AND ENGINEERING SITE PLANS NEED TO SHOW
 THE ENTIRE UNDERGROUND ELECTRIC PATH. THE SURVEY NEEDS
 TO SHOW THE RIGHT-OF-WAY LINE FOR THE ENTIRE LENGTH OF
 THE INSTALLATION SO THAT STAFF CAN VERIFY THAT THE
 UNDERGROUND ELECTRIC IS FULLY WITHIN THE RIGHT-OF-WAY.
  
 3) PROVIDE CROSS SECTIONS OF THE LOCATION OF THE
 UNDERGROUND ELECTRIC FOR THE FULL LENGTH OF THE
 INSTALLATION ALONG 55TH STREET. THERE UNDERGROUND
 ELECTRIC MUST BE CLEARLY SHOWN AVOIDING THE STREET TREE
 ROOT SYSTEMS AND ANY INFRASTRUCTURE THAT IT CROSSES
 (EXAMPLE THE SANITARY LINE SHOWN ON THE SURVEY).
  
 4) SHEET E5, UTILITY ROUTING / GROUNDING PLAN SHOWS A
 WIRELESS FACILITY DESIGN THAT DOES NOT COMPLY WITH CITY
 STANDARDS. NOTE: A COMPLIANT FACILITY IS SHOWN ON
 SHEETS E2, E3 AND C3.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446