Plan Review Notes
Plan Review Notes For Permit 20030968
Permit Number 20030968
Review Stop B
Sequence Number 3
Notes
Date Text
2021-06-07 11:29:48EMAIL FROM CHRISTINA WARR (REAL ESTATE PROJECT MANAGER)
 DATED 06/03/21 STATES THAT "THE METAL POLE WILL BE
 INSTALLED UNDER THE ROW PERMIT ISSUED BY FDOT. THE
 ENCLOSURE ATTACHED TO THE POLE IS ALSO PERMITTED UNDER
 A SEPARATE ROW PERMIT WHICH HAS BEEN ISSUED BY FDOT.
 THESE APPLICATIONS ARE ONLY FOR THE ELECTRICAL
 CONNECTION TO THE POLE."
  
 NOTE:
 PROVIDE FDOT APPROVED PERMIT PACKAGE. IF THERE IS NOT
 FDOT APPROVED PERMIT PACKAGE THEN ALL THE BUILDING
 REVIEW COMMENTS APPLY. SEE COMMENTS BELOW.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  
  
  
 HI JULIO,
 I NOTICED YOU MADE THE SAME COMMENTS TO SEVERAL OF
 VERIZON?S ELECTRICAL PERMIT PROJECTS, SO I WANTED TO
 ADDRESS THEM AS A WHOLE. THIS PERTAINS TO THE FOLLOWING
 PROJECTS:
  
 20030966
 20030968
 20101190
 20101364
 21020848
 20030970
 20030971
 20030974
  
 1) ORIGINAL COMMENT:
 VALUATION DECLARED IN THE PERMIT APPLICATION IS LOW.
 RESPONSE:
 THE SCOPE OF WORK IS ONLY FOR THE ELECTRICAL CONNECTION
 TO THE POLE. TOTAL VALUATION IS $1,800. THE
 INSTALLATION OF THE POLE IS NOT INCLUDED IN THIS
 PERMIT. THE POLE INSTALLATION AND DIRECTIONAL BORE IS
 APPROVED UNDER A SEPARATE FDOT PERMIT.
 2) ORIGINAL COMMENT:
 APPLICATION WAS SUBMITTED AS AN ELECTRICAL PERMIT ONLY
 FOR THE INSTALLATION OF 100 AMP ELECTRICAL SERVICE TO
 SMALL CELL POLE. BASED ON THE INFORMATION SUBMITTED, IT
 LOOKS LIKE A COMMUNICATIONS PERMIT IS REQUIRED. CITY
 ORDINANCE NO. 4774-18.
 RESPONSE:
 THE RIGHT-OF-WAY PERMITS HAVE BEEN APPROVED AND ISSUED
 BY FDOT. THESE APPLICATIONS ARE ONLY FOR THE ELECTRICAL
 CONNECTION TO THE POLE.
 3) ORIGINAL COMMENT:
 TITLE SHEET T1 SPECIFIES "INSTALLATION OF PROPOSED
 POWER FOR SMALL CELL EQUIPMENT ON PROPOSED METAL POLE".
 SCOPE OF WORK IS NOT CLEAR. IS THERE A NEW METAL POLE
 OR IS IT EXISTING INSTALLED BY FPL? PLANS ALSO SHOW
 VERIZON WIRELESS ENCLOSURE ATTACHED TO THE POLE. THERE
 ARE NO SPECIFICATIONS FOR THE ATTACHMENT OF THIS
 ENCLOSURE TO THE POLE. IS THIS DONE UNDER ANOTHER
 PERMIT? SEC. 107.2.1 CITY AMENDMENTS.
 PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR THE
 PROPOSED METAL POLE AND VERIZON WIRELESS ENCLOSURE
 ATTACHMENT IF THEY ARE PART OF THIS PERMIT.
 RESPONSE:
 THE METAL POLE WILL BE INSTALLED UNDER THE ROW PERMIT
 ISSUED BY FDOT. THE ENCLOSURE ATTACHED TO THE POLE IS
 ALSO PERMITTED UNDER A SEPARATE ROW PERMIT WHICH HAS
 BEEN ISSUED BY FDOT. THESE APPLICATIONS ARE ONLY FOR
 THE ELECTRICAL CONNECTION TO THE POLE.
  
 COULD YOU PLEASE REVIEW THESE PERMITS WITH THIS
 INFORMATION?
  
 THANK YOU,
 CHRISSY
  
 CHRISTINA WARR
 REAL ESTATE PROJECT MANAGER
 [email protected]
 C. 815-405-3664
 WWW.SMARTLINKGROUP.COM
  
  
  
  
  
 SECOND BUILDING REVIEW COMMENTS
 CODE: FBC 6TH EDITION (2017) AND CITY AMENDMENTS.
  
 1- APPLICATION WAS SUBMITTED AS AN ELECTRICAL PERMIT
 ONLY FOR THE INSTALLATION OF 100 AMP ELECTRICAL SERVICE
 TO SMALL CELL POLE. BASED ON THE INFORMATION SUBMITTED,
 IT LOOKS LIKE A COMMUNICATIONS PERMIT IS REQUIRED. CITY
 ORDINANCE NO. 4774-18.
 NOTE: PLEASE SEE ZONING AND ENGINEERING COMMENTS.
  
 RESPONSE.
 PLEASE SEE ZONING AND ENGINEERING COMMENTS.
  
 2- TITLE SHEET T1 SPECIFIES "INSTALLATION OF PROPOSED
 POWER FOR SMALL CELL EQUIPMENT ON PROPOSED METAL POLE".
 SCOPE OF WORK IS NOT CLEAR. IS THERE A NEW METAL POLE
 OR IS IT EXISTING INSTALLED BY FPL.?. PLANS ALSO SHOW
 VERIZON WIRELESS ENCLOSURE ATTACHED TO THE POLE. THERE
 ARE NO SPECIFICATIONS FOR THE ATTACHMENT OF THIS
 ENCLOSURE TO THE POLE. IS THIS DONE UNDER ANOTHER
 PERMIT?. SEC. 107.2.1 CITY AMENDMENTS.
 PROVIDE PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR
 THE PROPOSED METAL POLE AND VERIZON WIRELESS ENCLOSURE
 ATTACHMENT IF THEY ARE PART OF THIS PERMIT. SEC. 1609.1
 FBC-BUILDING.
  
 RESPONSE:
 A) IT IS NOT CLEAR IF A NEW POLE WILL BE INSTALLED OR
 NOT. IF NEW POLE IS INSTALLED, THEN PROVIDE COMPLETE
 ENGINEERING DETAILS AND SPECIFICATIONS, INCLUDING THE
 EFFECTIVE PROJECTIVE AREA OF THE POLE AND PROPOSED
 EQUIPMENT TO BE INSTALLED IN IT.
 PLANS ALSO SHOW VERIZON WIRELESS ENCLOSURES ATTACHED TO
 THE POLE. THERE ARE NO SPECIFICATIONS FOR THE
 ATTACHMENT OF THIS ENCLOSURES TO THE POLE. SEC. 1609.1
 FBC-BUILDING. ALSO, PROVIDE ALL THE WIND DESIGN DATA AS
 REQUIRED BY SEC. 1603.4 FBC-BUILDING.
  
 B)PROVIDE POLE MANUFACTURER'S SPECS MEETING THE
 ENGINEER'S DESIGN CRITERIA. ENGINEER OF RECORD TO
 REVIEW/APPROVED POLE SPECS PRIOR TO SUBMITTAL. SEC.
 107.3.4.1 CITY AMENDMENTS.
  
  
 3- VALUATION DECLARED IN THE PERMIT APPLICATION IS LOW.
 VALUATION TO INCLUDE ALL LABOR, MATERIALS, CONTRACTOR'S
 OVERHEAD AND PROFIT AND DESIGN PROFESSIONAL FEES AS
 REQUIRED BY SEC. 109.3 CITY AMENDMENTS. UPDATE
 VALUATION AS REQUIRED, INCLUDING DESIGN PROFESSIONAL
 FEES.
  
 RESPONSE
 NOT ADDRESSED. SCOPE OF WORK IS NOT CLEAR. UNABLE TO
 DETERMINE VALUE.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]