| 2020-06-15 15:30:01 | 2ND REVIEW FBC-2017 PLUMBING |
| | PERMIT #20030953 |
| | 6/15/20 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | THE 1ST REVIEW COMMENTS LISTED BELOW WILL BE MARKED AS |
| | COMPLIED OR FAILED. NOTES ARE PROVIDED FOR FAILED |
| | COMMENTS. |
| | |
| | 1) FAILED. SHEET A301, A303: PROVIDE THE REQUIRED |
| | DIMENSIONS OF ALL THE CLEAR FLOOR SPACE DIAGRAMS FOR |
| | THE FIXTURES SHOWN ON THE DRAWINGS- WATER CLOSET- |
| | SECTION 604.3.2, URINALS- 605.3, LAVATORIES AND SINKS- |
| | 606.2, SHOWER- 608.2.2.1, BENCHES -903.2 & 305.3 FBC |
| | ACC. CLEAR FLOOR SPACES FOR SHOWERS NOT PROVIDED. |
| | |
| | 2) FAILED. A301, 303: PROVIDE THE DIAMETERS OF THE |
| | TURNING CIRCLES- SECTION 304.3.1 FBC ACC. DIAMETERS |
| | PROVIDED HOWEVER THE CIRCLES ARE OVERLAPPING THE URINAL |
| | PARTITIONS. PLEASE SHOW THE KNEE AND TOES CLEARANCES AT |
| | THE PARTITONS- SECTION 304.3.1 FBC ACC. |
| | |
| | 3) FAILED. A301, 303: IT APPEARS THE DOORS WILL SWING |
| | INTO THE REQUIRED CLEAR FLOOR SPACES AT THE SHOWERS AND |
| | THE STEAM ROOM BENCHES- SEE SECTION 603.2.3 EXCEPTION 2 |
| | FBC ACC. CLEAR FLOOR SPACE DIAGRAMS BEYOND THE ARCS OF |
| | THE DOOR SWINGS ARE SHOWN OVERLAPPING THE SHOWER |
| | THRESHOLDS WHICH IS NON-COMPLIANT PER SECTION 305.2 FBC |
| | ACC- CHANGES IN LEVEL ARE NOT ALLOWED. |
| | |
| | 4) COMPLIED. A301, 303, DETAILS 6 & 2: THE HEIGHT OF |
| | THE LAVATORY FRONT RIM SHALL BE 34"- SECTION 606.3 FBC |
| | ACC. A) SHOW THE HEIGHT OF THE MIRROR BOTTOM EDGE FROM |
| | THE FINISHED FLOOR- SECTION 603.3 FBC ACC. |
| | |
| | 5) FAILED. A301, 303: THE TOILET AND SHOWER ROOM GRAB |
| | BARS SHALL BE HORIZONTALLY POSITIONED A MINIMUM 33" AND |
| | MAXIMUM 36" ABOVE THE FINISHED FLOORS MEASURED TO THE |
| | TOP OF THE GRIPPING SURFACES- SECTION 609.4 FBC ACC. |
| | PLEASE CORRECT. MAXIMUM HEIGHT PROVIDED, THE REQUIRED |
| | MINIMUM 33? DIMENSION WAS NOT PROVIDED. |
| | |
| | 6) COMPLIED. A301, 303: THE SHOWER GRAB BARS SHALL BE |
| | SPACED A MAXIMUM 6" FROM THE ADJACENT WALLS- SECTION |
| | 608.3.2 FBC ACC. |
| | |
| | 7) FAILED. A301, 303, DETAILS 3 & 8, & 4 & 11: SHOW THE |
| | HEIGHTS OF THE SHOWER CONTROLS ABOVE THE FINISHED |
| | SHOWER FLOORS- SECTION 608.5.2 FBC ACC. A) THE SHOWER |
| | SPRAY UNITS AT 5'7"ARE EXCEEDING THE MAXIMUM 48" |
| | MOUNTING HEIGHTS ABOVE THE FINISHED FLOORS. THE |
| | CONTROLS TO BE CENTERED AND ABOVE THE MAXIMUM 48? |
| | HEIGHT. PLEASE SEE SECTION 608.5.2 AND FIGURE 608.5.3 |
| | FBC ACC. |
| | |
| | 8) COMPLIED A301, 303, DETAILS 3 & 8, & 4 & 11: |
| | INDICATE COMPLIANCE WITH SECTION 608.6 FBC ACC. A |
| | SHOWER SPRAY UNIT WITH A HOSE 59 INCHES (1500 MM) LONG |
| | MINIMUM THAT CAN BE USED BOTH AS A FIXED-POSITION |
| | SHOWER HEAD AND AS A HAND-HELD SHOWER SHALL BE |
| | PROVIDED. THE SHOWER SPRAY UNIT SHALL HAVE AN ON/OFF |
| | CONTROL WITH A NON-POSITIVE SHUT-OFF. IF AN |
| | ADJUSTABLE-HEIGHT SHOWER HEAD ON A VERTICAL BAR IS |
| | USED, THE BAR SHALL BE INSTALLED SO AS NOT TO OBSTRUCT |
| | THE USE OF GRAB BARS. SHOWER SPRAY UNITS SHALL DELIVER |
| | WATER THAT IS 120 DEGREES F MAXIMUM. EXCEPTION: A FIXED |
| | SHOWER HEAD LOCATED AT 48 INCHES (1220 MM) MAXIMUM |
| | ABOVE THE SHOWER FINISH FLOOR SHALL BE PERMITTED |
| | INSTEAD OF A HAND-HELD SPRAY UNIT IN FACILITIES THAT |
| | ARE NOT MEDICAL CARE FACILITIES, LONG-TERM CARE |
| | FACILITIES, TRANSIENT LODGING GUEST ROOMS, OR |
| | RESIDENTIAL DWELLING UNITS. |
| | |
| | 9) COMPLIED. A301, 303, DETAILS 6 & 7: SHOW THE |
| | REQUIRED TOE AND KNEE CLEARANCES AT THE SINK- SECTIONS |
| | 306.2 & 306.3 FBC ACC. |
| | |
| | 10) PARTIALLY COMPLIED. THE EWC-1 SHALL MEET |
| | ACCESSIBILITY REQUIREMENTS AS OUTLINED IN SECTIONS 305 |
| | THROUGH 309 FBC ACC. PROVIDE DETAILS ON THE PLAN TO |
| | SHOW COMPLIANCE AND SUBMIT MANUFACTURER'S |
| | SPECIFICATIONS. THE CUT SHEET FOR THE DF DOES NOT |
| | INDICATE THE FIXTURE IS ADA OR FL. ACCESSIBILITY CODE |
| | COMPLIANT. PLEASE PLACE NOTES ON THE PLANS TO INDICATE |
| | THE MINIMUM TWO ACCESSIBLE DRINKING FOUNTAINS ARE BEING |
| | PROVIDED ON THE SAME FLOOR AS THE NEW OCCUPANCY- |
| | SECTION 211.2 A& 211.3 FBC ACC. |
| | |
| | 11) COMPLIED P0.01: PLEASE INCLUDE THE STEAM GENERATORS |
| | IN THE FIXTURE SCHEDULE AND SUBMIT MANUFACTURER'S |
| | SPECIFICATIONS- SECTION 107.2.1 WPB. |
| | |
| | 12) PARTIALLY COMPLIED P4.01 & P9.01: BACKFLOW |
| | PREVENTERS ARE REQUIRED FOR THE WATER SUPPLY PIPING TO |
| | THE STEAM GENERATORS. PLEASE INDICATE THEM IN THE |
| | DRAWINGS- SECTION 608.3 FBC P. PLEASE INDICSTE WHICH |
| | TYPE OF BACKFLOW PREVENTER DEVICE WILL BE PROVIDED AND |
| | ADD THE MAKE AND MODEL TO THE FIXTURE OR DEVICE |
| | SCHEDULE. |
| | |
| | 13) FAILED. P4.01 & P9.01: PLEASE SHOW THE LOCATIONS OF |
| | SHUT OFF VALVES, WATER HAMMER ARRESTORS, MIXING VALVES |
| | AND ANY OTHER REQUIRED WATER CONTROLS- SECTION 107.2.1 |
| | WPB AND SECTIONS 604.9 & 606.2 FBC P. IN RESPONSE TO |
| | THIS COMMENT THE AOR REFERS TO THE FIXTURE SCHEDULE. |
| | PLEASE PROVIDE LOCATIONS AND SYMBOLS ON THE SHEETS FOR |
| | THE WATER HAMMER ARRESTORS FOR WATER SUPPLY LINES TO |
| | THE BOTTLE FILLER, LAVATORIES, URINALS, FLUSHOMETER |
| | VALVERS, AND ICE MAKER. A BACKFLOW PREVENTER IS ALSO |
| | REQUIRED FOR THE ICE MAKER WATER LINE. |
| | |
| | 14) COMPLIED. P4.01 & P9.01: PLEASE INDICATE HOW |
| | TEMPERED WATER WILL BE REQUIRED TO THE LAVATORIES- |
| | SECTION 416.5. PLEASE NOTE THAT TEMPERATURE LIMITING |
| | DEVICES SHALL CONFORM TO ASSE 1070- SECTION 607.1.2 FBC |
| | P, AND WHERE REQUIRED SHALL BE INSTALLED AT POINT OF |
| | USE- SECTION 607.1.1. |
| | |
| | 15) COMPLIED. P4.01, P5.01, & P9.02: THE WATER HEATER |
| | DETAIL INDICATES THE RELIEF VALVE DISCHARGE PIPING |
| | DRAINING INTO A FLOOR DRAIN. THIS DOES NOT APPEAR TO BE |
| | CONSISTENT WITH THE PLUMBING DRAWINGS. PLEASE SHOW HOW |
| | THE PIPING AND PAN DRAIN PIPING WILL BE DISCHARGED TO |
| | THE EXTERIOR OF THE BUILDING- SECTION 504.7.2 FBC P. |
| | |
| | 16) COMPLIED. P4.01: REFER TO GENERAL NOTE #2 AND |
| | PROVIDE WATER PIPING AND DWV SPECIFICATIONS ON THE |
| | PLANS- SECTIONS 303.1 & 307.6 FBC P. |
| | |
| | 18) FAILED. P9.01 & P9.02: SHOW REQUIRED TRAP SEAL |
| | PROTECTION FOR THE FLOOR DRAINS- SECTION 1002.4.1 FBC |
| | P. TRAP PRIMERS FOR THE FLOOR DRAINS (FD-1) AND THE |
| | TRENCH DRAINS (TD-1, TD-2, & TD-3) NOT SHOWN IN THE |
| | ISOMETRIC. PLEASE NOTE FD-1 IS NOT IN THE FIXTURE |
| | SCHEDULE. |
| | |
| | 19) COMPLIED. P9.02: TD-1 AND THE DRAIN FROM THE MEN'S |
| | STEAM GENERATOR DO NOT APPEAR TO BE MAKING A DRAIN AND |
| | VENT CONNECTION INTO THE SYSTEM- SECTION 107.2.1 WPB. |
| | |
| | 20) FAILED. P9.02: PLEASE LABEL THE FIXTURES COLLECTING |
| | THE CONDENSATE FROM THE STEAM GENERATORS- SECTION |
| | 107.2.1 WPB. PLEASE NOTE THAT TRAP SEAL PROTECTION MAY |
| | BE REQUIRED- SECTION 1002.4.1 FBC P. INDIRECT WASTE |
| | RECEPTORS NOT IN THE FIXTURE SCHEDULE. |
| | |
| | 21) PARTIALLY COMPLIED. P9.02: SHOW THE LOCATIONS OF |
| | THE REQUIRED SERVICE SINK AND PROVIDE PLUMBING DETAILS- |
| | TABLE 403.1 FBC P. PLEASE PLACE A NOTE ON THE PLAN |
| | INDICATING SERVICE SINK LOCATION. |
| | |
| | 22) COMPLIED. P0.01: PROVIDE THE EFFICIENCY RATING OF |
| | EWH-1 & 2 AND SUBMIT MANUFACTURER'S SPECIFICATIONS TO |
| | VERIFY COMPLIANCE- SEE TABLE C404.2 FBC EC. |
| | |
| | 23) COMPLIED. P4.01: SHOW HOW ACCESS FOR THE SERVICE |
| | AND REPLACEMENT OF THE WATER HEATERS WILL BE PROVIDED- |
| | SECTION 306.1 FBC M. |
| | |
| | 24) COMPLIED. P0.01: VERIFY THE CIRCULATION PUMP HAS |
| | CONTROLS THAT WILL TURN OFF THE PUMP WHEN THE WATER IN |
| | THE CIRCULATION LOOP HAS REACHED THE DESIRED |
| | TEMPERATURE, AND WHEN THERE IS NO DEMAND FOR HOT WATER- |
| | SECTION C404.6.1 FBC EC. |
| | |
| | 25) COMPLIED. PROVIDE WATER PIPING INSULATION |
| | SPECIFICATIONS IN ACCORDANCE WITH SECTION C404.4 FBC |
| | EC. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD |
| | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER |
| | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN |
| | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS |
| | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS |
| | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR |
| | UPDATED. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |