| Date |
Text |
| 2020-04-06 09:42:33 | 1ST REVIEW FBC-2017 PLUMBING |
| | PERMIT #20030953 |
| | 4/6/20 |
| | |
| | CODES IN EFFECT: |
| | |
| | FBC B- FLORIDA BUILDING CODE SIXTH EDITION 2017 |
| | FBC M- FLORIDA MECHANICAL CODE SIXTH EDITION 2017 |
| | FBC EC- FLORIDA ENERGY CONSERVATION CODE SIXTH EDITION |
| | 2017 |
| | FBC FG- FLORIDA FUEL GAS CODE SIXTH EDITION 2017 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE SIXTH EDITION |
| | 2017 |
| | FBC P- FLORIDA PLUMBING CODE SIXTH EDITION 2017 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE SIXTH ADDITION 2017 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC SIXTH |
| | EDITION 2017 |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) SHEET A301, A303: PROVIDE THE REQUIRED DIMENSIONS OF |
| | ALL THE CLEAR FLOOR SPACE DIAGRAMS FOR THE FIXTURES |
| | SHOWN ON THE DRAWINGS- WATER CLOSET- SECTION 604.3.2, |
| | URINALS- 605.3, LAVATORIES AND SINKS- 606.2, SHOWER- |
| | 608.2.2.1, BENCHES -903.2 & 305.3 FBC ACC. |
| | |
| | 2) A301, 303: PROVIDE THE DIAMETERS OF THE TURNING |
| | CIRCLES- SECTION 304.3.1 FBC ACC. |
| | |
| | 3) A301, 303: IT APPEARS THE DOORS WILL SWING INTO THE |
| | REQUIRED CLEAR FLOOR SPACES AT THE SHOWERS AND THE |
| | STEAM ROOM BENCHES- SEE SECTION 603.2.3 EXCEPTION 2 FBC |
| | ACC. |
| | |
| | 4) A301, 303, DETAILS 6 & 2: THE HEIGHT OF THE LAVATORY |
| | FRONT RIM SHALL BE 34"- SECTION 606.3 FBC ACC. A) SHOW |
| | THE HEIGHT OF THE MIRROR BOTTOM EDGE FROM THE FINISHED |
| | FLOOR- SECTION 603.3 FBC ACC. |
| | |
| | 5) A301, 303: THE TOILET AND SHOWER ROOM GRAB BARS |
| | SHALL BE HORIZONTALLY POSITIONED A MINIMUM 33" AND |
| | MAXIMUM 36" ABOVE THE FINISHED FLOORS MEASURED TO THE |
| | TOP OF THE GRIPPING SURFACES- SECTION 609.4 FBC ACC. |
| | PLEASE CORRECT. |
| | |
| | 6) A301, 303: THE SHOWER GRAB BARS SHALL BE SPACED A |
| | MAXIMUM 6" FROM THE ADJACENT WALLS- SECTION 608.3.2 FBC |
| | ACC. |
| | |
| | 7) A301, 303, DETAILS 3 & 8, & 4 & 11: SHOW THE HEIGHTS |
| | OF THE SHOWER CONTROLS ABOVE THE FINISHED SHOWER |
| | FLOORS- SECTION 608.5.2 FBC ACC. A) THE SHOWER SPRAY |
| | UNITS AT 5'7"ARE EXCEEDING THE MAXIMUM 48" MOUNTING |
| | HEIGHTS ABOVE THE FINISHED FLOORS. |
| | |
| | 8) A301, 303, DETAILS 3 & 8, & 4 & 11: INDICATE |
| | COMPLIANCE WITH SECTION 608.6 FBC ACC. A SHOWER SPRAY |
| | UNIT WITH A HOSE 59 INCHES (1500 MM) LONG MINIMUM THAT |
| | CAN BE USED BOTH AS A FIXED-POSITION SHOWER HEAD AND AS |
| | A HAND-HELD SHOWER SHALL BE PROVIDED. THE SHOWER SPRAY |
| | UNIT SHALL HAVE AN ON/OFF CONTROL WITH A NON-POSITIVE |
| | SHUT-OFF. IF AN ADJUSTABLE-HEIGHT SHOWER HEAD ON A |
| | VERTICAL BAR IS USED, THE BAR SHALL BE INSTALLED SO AS |
| | NOT TO OBSTRUCT THE USE OF GRAB BARS. SHOWER SPRAY |
| | UNITS SHALL DELIVER WATER THAT IS 120 DEGREES F |
| | MAXIMUM. |
| | EXCEPTION: A FIXED SHOWER HEAD LOCATED AT 48 INCHES |
| | (1220 MM) MAXIMUM ABOVE THE SHOWER FINISH FLOOR SHALL |
| | BE PERMITTED INSTEAD OF A HAND-HELD SPRAY UNIT IN |
| | FACILITIES THAT ARE NOT MEDICAL CARE FACILITIES, |
| | LONG-TERM CARE FACILITIES, TRANSIENT LODGING GUEST |
| | ROOMS, OR RESIDENTIAL DWELLING UNITS. |
| | |
| | 9) A301, 303, DETAILS 6 & 7: SHOW THE REQUIRED TOE AND |
| | KNEE CLEARANCES AT THE SINK- SECTIONS 306.2 & 306.3 FBC |
| | ACC. |
| | |
| | 10) THE EWC-1 SHALL MEET ACCESSIBILITY REQUIREMENTS AS |
| | OUTLINED IN SECTIONS 305 THROUGH 309 FBC ACC. PROVIDE |
| | DETAILS ON THE PLAN TO SHOW COMPLIANCE AND SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS. |
| | |
| | 11) P0.01: PLEASE INCLUDE THE STEAM GENERATORS IN THE |
| | FIXTURE SCHEDULE AND SUBMIT MANUFACTURER'S |
| | SPECIFICATIONS- SECTION 107.2.1 WPB |
| | |
| | 12) P4.01 & P9.01: BACKFLOW PREVENTERS ARE REQUIRED FOR |
| | THE WATER SUPPLY PIPING TO THE STEAM GENERATORS. PLEASE |
| | INDICATE THEM IN THE DRAWINGS- SECTION 608.3 FBC P. |
| | |
| | 13) P4.01 & P9.01: PLEASE SHOW THE LOCATIONS OF SHUT |
| | OFF VALVES, WATER HAMMER ARRESTORS, MIXING VALVES AND |
| | ANY OTHER REQUIRED WATER CONTROLS- SECTION 107.2.1 WPB |
| | AND SECTIONS 604.9 & 606.2 FBC P. |
| | |
| | 14) P4.01 & P9.01: PLEASE INDICATE HOW TEMPERED WATER |
| | WILL BE REQUIRED TO THE LAVATORIES- SECTION 416.5. |
| | PLEASE NOTE THAT TEMPERATURE LIMITING DEVICES SHALL |
| | CONFORM TO ASSE 1070- SECTION 607.1.2 FBC P, AND WHERE |
| | REQUIRED SHALL BE INSTALLED AT POINT OF USE- SECTION |
| | 607.1.1 |
| | |
| | 15) P4.01, P5.01, & P9.02: THE WATER HEATER DETAIL |
| | INDICATES THE RELIEF VALVE DISCHARGE PIPING DRAINING |
| | INTO A FLOOR DRAIN. THIS DOES NOT APPEAR TO BE |
| | CONSISTENT WITH THE PLUMBING DRAWINGS. PLEASE SHOW HOW |
| | THE PIPING AND PAN DRAIN PIPING WILL BE DISCHARGED TO |
| | THE EXTERIOR OF THE BUILDING- SECTION 504.7.2 FBC P. |
| | |
| | 16) P4.01: REFER TO GENERAL NOTE #2 AND PROVIDE WATER |
| | PIPING AND DWV SPECIFICATIONS ON THE PLANS- SECTIONS |
| | 303.1 & 307.6 FBC P. |
| | |
| | 18) P9.01 & P9.02: SHOW REQUIRED TRAP SEAL PROTECTION |
| | FOR THE FLOOR DRAINS- SECTION 1002.4.1 FBC P. |
| | |
| | 19) P9.02: TD-1 AND THE DRAIN FROM THE MEN'S STEAM |
| | GENERATOR DO NOT APPEAR TO BE MAKING A DRAIN AND VENT |
| | CONNECTION INTO THE SYSTEM- SECTION 107.2.1 WPB. PLEASE |
| | NOTE THAT AN INDIRECT |
| | |
| | 20) P9.02: PLEASE LABEL THE FIXTURES COLLECTING THE |
| | CONDENSATE FROM THE STEAM GENERATORS- SECTION 107.2.1 |
| | WPB. PLEASE NOTE THAT TRAP SEAL PROTECTION MAY BE |
| | REQUIRED- SECTION 1002.4.1 FBC P. |
| | |
| | 21) P9.02: SHOW THE LOCATIONS OF THE REQUIRED SERVICE |
| | SINK AND PROVIDE PLUMBING DETAILS- TABLE 403.1 FBC P. |
| | |
| | 22) P0.01: PROVIDE THE EFFICIENCY RATING OF EWH-1 & 2 |
| | AND SUBMIT MANUFACTURER'S SPECIFICATIONS TO VERIFY |
| | COMPLIANCE- SEETABLE C404.2 FBC EC. |
| | |
| | 23) P4.01: SHOW HOW ACCESS FOR THE SERVICE AND |
| | REPLACEMNT OF THE WATER HEATERS WILL BE PROVIDED- |
| | SECTION 306.1 FBC M. |
| | |
| | 24) P0.01: VERIFY THE CIRCULATION PUMP HAS CONTROLS |
| | THAT WILL TURN OFF THE PUMP WHEN THE WATER IN THE |
| | CIRCULATION LOOP HAS REACHED THE DESIRED TEMPERATURE, |
| | AND WHEN THERE IS NO DEMAND FOR HOT WATER- SECTION |
| | C404.6.1 FBC EC. |
| | |
| | 25) PROVIDE WATER PIPING INSULATION SPECIFICATIONS IN |
| | ACCORDANCE WITH SECTION C404.4 FBC EC. |
| | |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE OLD |
| | SHEETS FROM THE PLAN SETS, BIND THEM TOGETHER |
| | SEPARATELY AND MARK VOID OR OLD ON THEM. PLEASE RETAIN |
| | THEM FOR REFERENCE WITH THE NEW SUBMITTED PLANS. THIS |
| | PROCESS WILL ALSO APPLY TO ANY DOCUMENTS SUCH AS |
| | PRODUCT APPROVALS OR CALCULATIONS BEING REPLACED OR |
| | UPDATED. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |