| Date |
Text |
| 2020-04-10 08:58:07 | A NEW GAS PLAN HAS BEEN SUBMITTED FOR REVIEW. |
| | 1) ) SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE PRESSURE REGULATORS. |
| | REGULATORS INSTALLED ON THE EXTERIOR OF THE BUILDING |
| | SHALL BE APPROVED FOR OUTDOOR INSTALLATION. IDENTIFY ON |
| | THE SPECIFICATION SHEETS WHICH MODEL REGULATOR IS BEING |
| | INSTALLED AND THE ORIFICE SIZE TO ENSURE THE REGULATOR |
| | CAN ACCOMMODATE THE BTU LOAD THROUGH THE REGULATOR.2017 |
| | FGC SEC.410.1, 2017 FBC-RES. SEC. G2421.1. |
| | 2) WHERE CONNECTED TO RIGID PIPING, A UNION SHALL BE |
| | INSTALLED WITHIN 1 FOOT OF EITHER SIDE OF THE MP |
| | REGULATOR. 2017 FBC-FUEL GAS SEC.410.2 (7). |
| | 3) SEDIMENT TRAPS ARE REQUIRED AT THE POOL HEATERS PER |
| | 2017 FBC-GAS SEC. 408.4. |
| | 4) SHOW THE TYPE AND SIZE OF THE PIPE AT THE OULET OF |
| | THE GAS METER. |
| | 5) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE POOL |
| | HEATERS. PROVIDE VERIFICATION & CALCULATIONS AS TO HOW |
| | THE REQUIREMENTS ARE BEING MET. PROVIDE THE CODE |
| | SECTIONS FROM THE GAS CODE THAT YOU ARE USING IN THE |
| | DESIGN OF THE COMBUSTION AIR REQUIREMENTS PER THE 2017 |
| | FBC-FUEL GAS CODE SEC.304.1. |
| | 6) SUBMIT TWO COPIES OF A DETAIL SHOWING THE TYPE OF |
| | VENT, LOCATION, SIZE, TERMINATION POINT, HEIGHT ABOVE |
| | THE ROOF AND ANCHORING DETAILS OF THE GAS VENT(S) FOR |
| | THE POOL HEATERS PER 2017 FBC-FUEL GAS SECS. 502 THRU |
| | 505. |
| | 7) SHT.P-5.8 REFERS TO TABLE 402.4 (5) WHICH IS FOR |
| | SCH. 40 METALLIC PIPE AT 2 PSI. THE GAS RISER ALSO |
| | SHOWS PE PIPE BUT THERE IS NO SIZING TABLE REFERENCED. |
| | SUBMIT THE SIZING TABLE BEING USED FOR THE PE PIPE. |
| | 8) SUBMIT TWO COPIES OF THE MANUFACTURER?S |
| | SPECIFICATION SHEETS / INSTALLATION MANUAL FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA 54, |
| | NFPA 58, AND FBC-2017 FUEL GAS CODE SEC. 402.2, AND |
| | 301.3. GAS APPLIANCES SHALL BE LISTED AND LABELED. THE |
| | INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT |
| | SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC |
| | SEC.305.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |