| Date |
Text |
| 2021-02-16 09:20:07 | ADDITION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | 3RD REVIEW |
| | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 |
| | 1) ROOFING PRODUCT APPROVAL FOR THIS ROUND OF REVIEW |
| | DOES NOT INCLUDE THE INSTALLATION DETAILS ONLY THE |
| | FRONT PAGES - PREVIOUS COMMENT = ON THE ROOFING PRODUCT |
| | APPROVAL - PLEASE CIRCLE THE SYSTEM TO BE USED - IF |
| | NEEDED PROVIDE SIGNED AND SEALED ADDITIONAL ATTACHMENT |
| | DETAILS FROM AN ENGINEER OR ARCHITECT FOR ZONES 2 AND 3 |
| | REQUIRING HIGHER WIND PRESSURES THAN THE PRODUCT |
| | APPROVAL WILL ALLOW ( SEE LIMITATION NUMBER 7 IN THE |
| | PRODUCT APPROVAL). |
| | 2) ROOFING SYSTEMS MAY BE DEFERRED SUBMITTALS BY |
| | LISTING ITEMS TO BE DEFERRED ON THE CONSTRUCTION |
| | DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. FOR THE |
| | PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE |
| | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| | SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE |
| | TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |