| 2020-10-07 15:32:53 | 10/07/20 3RD PLUMBING REVIEW **DENIED** WITH COMMENTS |
| | |
| | NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS |
| | TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE |
| | GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS. |
| | |
| | 1. THE SANITARY RISER DIAGRAM, SOME ITEMS NEED |
| | CORRECTIONS AS FOLLOW; |
| | |
| | A. SHEET P 7.5 2VD, 2V2C, 2V2D, V1A, AND V2A BATHROOM |
| | SHOWER IS NOT VENTED CORRECTLY, PLEASE REFER TO 2V2A |
| | FOR A CORRECT METHOD, PER THE 2017 FBC SEC. P910.1. |
| | |
| | B. SHEET P7.6 SHOWER ON S2A AND 2SA2 NEED TO BE VENTED |
| | BETWEEN SHOWER AND WATER CLOSET WITH LAV RISER PER THE |
| | 2017 FBC SEC. P910.1. |
| | |
| | C. SHEET P7.7 SHOWER ON 2V2A NEEDS TO BE VENTED BETWEEN |
| | SHOWER AND WATER CLOSET WITH LAV RISER, REFER TO S1A |
| | FOR A CORRECT METHOD, PER THE 2017 FBC SEC. P910.1. |
| | |
| | D. SHEET P7.8 THE DIRECTION OF FLOW FROM BRANCH TO THE |
| | SHOWER IS NOT CORRECT ON 2S2B AND S2B PER THE 2017 FBC |
| | SEC. P706.1. SHOWER ON 2S2B AND S2B NEED TO BE VENTED |
| | BETWEEN THE SHOWER AND WATER CLOSET WITH A LAV RISER |
| | PER THE 2017 FBC SEC. P910.1. |
| | |
| | E. SHEET P7.9 THE DIRECTION OF FLOW FROM BRANCH TO THE |
| | SHOWER IS NOT CORRECT ON S2C AND 2S2C PER THE 2017 FBC |
| | SEC. P706.1. SHOWER ON S2C AND 2S2C NEED TO BE VENTED |
| | BETWEEN THE SHOWER AND WATER CLOSET WITH A LAV RISER |
| | PER THE 2017 FBC SEC. P910.1. |
| | |
| | F. SHEET P7.10 THE DIRECTION OF FLOW FROM BRANCH TO THE |
| | SHOWER IS NOT CORRECT ON S2D AND 2S2D PER THE 2017 FBC |
| | SEC. P706.1. SHOWER ON S2D AND 2S2D NEED TO BE VENTED |
| | BETWEEN THE SHOWER AND WATER CLOSET WITH A LAV RISER |
| | PER THE 2017 FBC SEC. P910.1. SHOWER S2D WAS CHANGED ON |
| | THE 2ND FLOOR BUT NOT ON 3RD AND IT NEEDS TO BE MOVED |
| | TO THE BATHROOM GROUP OF V2D PER THE 2017 FBC. SEC. |
| | P706.1. |
| | |
| | 2. SHEET P7.3 THEIR OS A DRY VENT AT THE END OF THE |
| | BATHROOM UPSTREAM FROM WATER FOUNTAIN THAT IS NOT |
| | REQUIRED AS IT CAN NOT BE MADE A WET VENT YOU CAN |
| | DELETE IT PER THE 2017 FBC SEC. P317. |
| | |
| | PLEASE NOTE IF YOU WOULD SEND ME YOUR CORRECTION BY |
| | EMAIL I WILL REVIEW AND REDLINE BEFORE YOU UPLOAD THEM |
| | TO PROJECTDOC TO HAVE CORRECTIONS REFLECT WHAT THE |
| | COMMENT REQUEST. |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION & |
| | REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS |
| | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL |
| | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE |
| | REVISION, MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO |
| | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED |
| | COOPERATION. |
| | |
| | LUIS A. CRESPO |
| | PLUMBING PLAN EXAMINER / INSPECTOR |
| | EMAIL: [email protected] OFFICE: 561 805-6720 |
| | |