| Date |
Text |
| 2020-08-10 05:43:03 | 1) SHT.A-0.1 - DETAIL #3 - UNIT 2A - THIS LAYOUT DOES |
| | NOT COMPLY WITH THE FAIR HOUSING ACT DESIGN MANUAL, |
| | CHAPTER 7, PAGE 7.56 & 7.57. THE ONLY FIXTURE PERMITTED |
| | TO BE ADJACENT TO THE SHOWER IS A LAVATORY MOUNTED ON |
| | THE CONTROL WALL BESIDE THE SHOWER AND MAY OVERLAP THE |
| | CLEAR FLOOR SPACE BY A MAXIMUM OF 6 INCHES. THE PORTION |
| | OF THE LAVATORY THAT OVERLAPS THE CLEAR FLOOR SPACE |
| | MUST HAVE KNEE SPACE BELOW OR A REMOVABLE VANITY |
| | CABINET. A 30 INCH WIDE BY 48 INCH DEEP CLEAR FLOOR |
| | SPACE MUST BE PROVIDED PARALLEL TO THE SHOWER AND FLUSH |
| | WITH THE CONTROL WALL. 2ND REQUEST. |
| | 2) THE PRESSURE CYLINDER FOR THE ELEVATOR SHALL BE |
| | PROTECTED IN ACCORDANCE WITH 2017 FBC-BUILDING |
| | SEC.3011. I COULD NOT FIND THIS DETAIL ON THE PLANS. |
| | PLEASE SUBMIT THE SPECIFIC PAGE WHERE THIS DETAIL CAN |
| | BE FOUND. 2ND REQUEST. |
| | 3) FIRESTOPPING DETAILS HAVE BEEN SUBMITTED FOR METAL |
| | PIPE THROUGH RATED WALLS AND FLOORS. IF PVC PIPE IS TO |
| | BE INSTALLED, SUBMIT FIRESTOPPING ASSEMBLY DETAILS FOR |
| | THE PVC PIPE THROUGH RATED FLOORS AND WALLS.WPB AMEND. |
| | TO FBC SEC. 107.2.1, 107.3.5.1.1. |
| | 4) SHT. P7.2 - DETAIL #1 - A MAXIMUM OF 10 FIXTURE |
| | UNITS SHALL BE VENTED BY A 1 1/2 INCH VENT PER |
| | FBC-PLUMBING TABLE 906.1.AS DRAWN, 15 FIXTURE UNITS ARE |
| | BEING VENTED BY THE 1 1/2 INCH VENT. REFER TO |
| | FBC-PLUMBING TABLE 709.1 FOR FIXTURE UNIT VALUE FOR A |
| | BATHROOM GROUP. |
| | 5) SHT. P7.3 - THE HOSE BIBBS SHALL BE EQUIPPED WITH |
| | SEPARATE SHUTOFF VALVES PER FBC-PLUMBING SEC.606.2 (2). |
| | 6) SHT. P7.3 - PROVIDE RISER TAGS FOR THE 1 1/2 INCH |
| | LINE UP TO THE 2ND & 3RD FLOOR UNITS AND FOR THE 4 INCH |
| | SANITARY FROM THE 2ND & 3RD FLOOR UNITS. WPB AMEND. TO |
| | FBC SEC. 107.3.5.1.3. |
| | 7) SHT. P7.4 - UNIT 2A - #1208 - RISER 2SA2 APPEARS TO |
| | BE LABELED AS 2S2A ON SHT. P5.2.. CLARIFY. |
| | 8) SHT. P7.4 - UNIT 2A - #1208 - RISER 2V2A APPEARS TO |
| | BE LABELED AS 2V2D ON SHT. P2.1. CLARIFY. |
| | 9) SHT.P7.4 - UNIT 1A - #'S 1206 & 1207 - FIRST FLOOR |
| | SANITARY - THE KITCHEN SINK IS DISCHARGING INTO THE |
| | HORIZONTAL WET VENT. ONLY FIXTURES WITHIN THE BATHROOM |
| | GROUP SHALL CONNECT TO THE WET VENTED HORIZONTAL BRANCH |
| | DRAIN. THE KITCHEN SINK SHALL CONNECT TO THE 4 INCH |
| | HORIZONTAL DRAIN DOWNSTREAM OF THE SHOWER.FBC-PLUMBING |
| | SEC.912.1. |
| | 10) SHT. P7.4 - UNIT 2B - #1205 - FIRST FLOOR SANITARY |
| | - THE SHOWER AND WATER CLOSET ARE NOT VENTED.THE |
| | LAVATORY DRAIN & VENT SHALL BE LOCATED BETWEEN THE |
| | WATER CLOSET AND THE SHOWER. FBC PLUMBING SEC. 901.2, |
| | 11) SHT. P7.4 - THE 2 INCH SANITARY LINE FOR THE PET |
| | WASH GOES NOWHERE. SHOW THE CONTINUATION AND |
| | TERMINATION POINT OF THIS LINE AND IDENTIFY IT WITH A |
| | RISER TAG IF APPLICABLE. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 12) SHT. P7.4 - VENT RISER V1B SHOWN AT THE PET WASH IS |
| | NOT SHOWN ON SHT. P2.1 - CLARIFY. |
| | 13) SHT. P7.4 - UNIT 2B - #1204 - MASTER BATH - VENT |
| | VTB APPEARS TO BE LABELED AS 2V2B ON SHT. P2.1. |
| | CLARIFY. |
| | 14) SHT. P7.4 - UNIT 2B - #1205 - HALL BATH - RISER |
| | 2V2B APPEARS TO BE LABELED AS V2B ON SHT. P2.1.THIS |
| | ALSO OCCURS ON THE 2ND AND 3RD FLOOR PLAN ON P2.1. |
| | CLARIFY. |
| | 15) SHT. P7.5 - UNIT 2B -#1204 - HALL BATH - RISER 2V2B |
| | APPEARS TO BE LABELED AS V2B ON SHT. P2.1. THIS ALSO |
| | OCCURS ON THE 2ND AND 3RD FLOOR PLAN ON P2.1. CLARIFY. |
| | 16) SHT. P7.5 - UNIT 2B - #1204 - RISER S2B IS NOT |
| | SHOWN ON SHT. P2.1 - CLARIFY. |
| | 17) SHT. P7.5 - UNIT 2B -#1204 - HALL BATH - FIRST |
| | FLOOR SANITARY - THE SHOWER AND WATER CLOSET ARE NOT |
| | VENTED.THE LAVATORY DRAIN & VENT SHALL BE LOCATED |
| | BETWEEN THE WATER CLOSET AND THE SHOWER. FBC PLUMBING |
| | SEC. 901.2, |
| | 18) SHT. P7.5 - UNIT 2A -#1201 - MASTER BATH - RISER |
| | LABELED AS V2A APPEARS TO BE LABELED AS 2V2D ON SHT. |
| | P2.1. CLARIFY. |
| | 19) SHT. P7.5 - UNIT 2A - #1201 -MASTER BATH - RISER |
| | LABELED AS S2A APPEARS TO BE LABELED AS 2S2A ON SHT. |
| | P2.1. THIS ALSO OCCURS ON THE 2ND & 3RD FLOORS. ALSO, |
| | THE VENT RISER FOR MASTER BATH LAVATORY IS NOT SHOWN ON |
| | THE PLAN VIEW FOR THE 2ND AND 3RD FLOORS. CLARIFY |
| | 20) SHT. P7.5 - UNIT 2A - #1201 - HALL BATH - THE |
| | SHOWER AND WATER CLOSET ARE NOT VENTED.THE LAVATORY |
| | DRAIN & VENT SHALL BE LOCATED BETWEEN THE WATER CLOSET |
| | AND THE SHOWER. FBC PLUMBING SEC. 901.2, |
| | 21) SHT. P7.5 - UNIT 2A - #1201 - HALL BATH - RISER |
| | LABELED AS 2V2A APPEARS TO BE LABELED AS V2A ON SHT |
| | P2.1. THIS ALSO OCCURS ON THE 2ND AND 3RD FLOORS. |
| | CLARIFY. |
| | 22) SHT. P7.5 - UNIT 2A - #1201 - RISER LABELED AS 2S2A |
| | APPEARS TO BE LABELED AS S2A ON SHT. P2.1. THIS ALSO |
| | OCCURS IN THE SAME UNIT ON THE 2ND & 3RD FLOORS. |
| | CLARIFY. |
| | 23) SHT. P7.6 - RISER S1A - THE SHOWER AND WATER CLOSET |
| | ARE NOT VENTED.THE LAVATORY DRAIN & VENT SHALL BE |
| | LOCATED BETWEEN THE WATER CLOSET AND THE SHOWER. FBC |
| | PLUMBING SEC. 901.2, |
| | 24) SHT. P7.7 - UNIT 2A - RISER S2A - THE SHOWER AND |
| | WATER CLOSET ARE NOT VENTED.THE LAVATORY DRAIN & VENT |
| | SHALL BE LOCATED BETWEEN THE WATER CLOSET AND THE |
| | SHOWER. FBC PLUMBING SEC. 901.2. |
| | 25) SHT. P7.7 - UNIT 2A - RISER 2SA2 FOR THE MASTER |
| | BATH APPEARS TO BE LABELED AS 2S2A ON SHT. P5.2 - |
| | CLARIFY. |
| | 26) CHECK ALL THE RISER TAGS ON THE PLAN VIEW SHEETS |
| | AGAINST THE SANITARY RISER DIAGRAMS TO ENSURE THE RISER |
| | TAGS CORRELATE THROUGH EACH FLOOR. REFER TO SHEETS |
| | P2.1, P7.4, P7.5, P7.6 & P7.7. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 27) SHT. P7.8 - UNIT 2B - RISER S2B - 2ND & 3RD FLOOR - |
| | THE SHOWER AND WATER CLOSET IN THE HALL BATH ARE NOT |
| | VENTED.THE LAVATORY DRAIN & VENT SHALL BE LOCATED |
| | BETWEEN THE WATER CLOSET AND THE SHOWER. FBC PLUMBING |
| | SEC. 901.2, |
| | 28) SHT. P7.8 - UNIT 2B - RISER S2B - THE KITCHEN SINK |
| | IS DISCHARGING INTO THE HORIZONTAL WET VENT. ONLY |
| | FIXTURES WITHIN THE BATHROOM GROUP SHALL CONNECT TO THE |
| | WET VENTED HORIZONTAL BRANCH DRAIN. THE KITCHEN SINK |
| | SHALL CONNECT TO THE 4 INCH HORIZONTAL DRAIN DOWNSTREAM |
| | OF THE SHOWER.FBC-PLUMBING SEC.912.1. |
| | 29) SHT.P7.8 - DETAIL #1 - RISERS 2V2B & V2B - A |
| | MAXIMUM OF 10 FIXTURE UNITS SHALL BE VENTED BY A 1 1/2 |
| | INCH VENT PER FBC-PLUMBING TABLE 906.1.AS DRAWN, 15 |
| | FIXTURE UNITS ARE BEING VENTED BY THE 1 1/2 INCH VENT. |
| | REFER TO FBC-PLUMBING TABLE 709.1 FOR FIXTURE UNIT |
| | VALUE FOR A BATHROOM GROUP. |
| | 30) PLEASE IDENTIFY THE TUBS AS TUBS ON THE RISER |
| | DIAGRAMS AND NOT AS SHOWERS. |
| | 31) SUBMIT A CONDENSATE RISER FOR REVIEW. SIZING SHALL |
| | COMPLY WITH FBC-PLUMBING SEC.314. |
| | 32) THE SANITARY RISERS SHOW THE DIRECTION OF FLOW AT |
| | SEVERAL AREAS OF THE RISERS. REVISE THE RISERS TO |
| | REFLECT CORRECT DIRECTION OF FLOW. |
| | 33) SUBMIT A WATER HEATER PAN DRAIN RISER FOR |
| | REVIEW.WPB AMEND. TO FBC SEC. 107.2.1. |
| | 34) IF A SUMP PUMP WILL BE INSTALLED IN THE ELEVATOR |
| | SUMP, THE INSTALLATION SHALL COMPLY WITH FBC-PLUMBING |
| | SEC.1003.4. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |