2020-03-16 07:22:45PASSED WITH PROVISOS:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF
 DRIVEWAY PROJECTS. PER CHAPTER 556 OF THE FLORIDA STATE
 STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES AT
 LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY
 CONSTRUCTION OR DEMOLITION WORK. INFORMATION CAN BE
 FOUND HERE: HTTP://WWW.SUNSHINE811.COM/
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAILS ARE ATTACHED.
  
 PROVISOS FOR DRIVEWAY WITH PAVERS
  
 IF USING PAVERS IN THE APRON AREA OF THE PROPOSED
 DRIVEWAY, YOU MUST EXECUTE A PAVER DRIVEWAY
 AGREEMENT.THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT
 IF PAVERS ARE USED IN THE RIGHT OF WAY PORTION OF THE
 DRIVEWAY. THE AGREEMENT MUST BE RECORDED AT PALM BEACH
 COUNTY COURTHOUSE - RECORDING DEPT. 4.25. A RECORDED
 COPY OF THIS DOCUMENT SHOULD BE FAXED TO (561)
 494-1116. ATTENTION: DRIVEWAY REVIEWER. DOCUMENT NEEDS
 TO BE RECORDED PRIOR TO FINAL SIGN OFF.
  
 THANKS,
  
 RICK ROSSANO
 PROJECT COORDINATOR, WPB ENGINEERING SERVICES, 401
 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX
 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098
 CELL: (561) 246-9525
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved