| Date |
Text |
| 2020-03-16 07:22:45 | PASSED WITH PROVISOS: |
| | |
| | THERE ARE WATER AND SEWER LINES IN THE VICINITY OF |
| | DRIVEWAY PROJECTS. PER CHAPTER 556 OF THE FLORIDA STATE |
| | STATUTES, YOU MUST CALL 811 FOR UTILITY LOCATES AT |
| | LEAST TWO FULL BUSINESS DAYS IN ADVANCE OF ANY |
| | CONSTRUCTION OR DEMOLITION WORK. INFORMATION CAN BE |
| | FOUND HERE: HTTP://WWW.SUNSHINE811.COM/ |
| | |
| | CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB |
| | CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE |
| | BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER), |
| | OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR |
| | EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD |
| | DETAILS ARE ATTACHED. |
| | |
| | PROVISOS FOR DRIVEWAY WITH PAVERS |
| | |
| | IF USING PAVERS IN THE APRON AREA OF THE PROPOSED |
| | DRIVEWAY, YOU MUST EXECUTE A PAVER DRIVEWAY |
| | AGREEMENT.THE PAVER DRIVEWAY AGREEMENT IS A REQUIREMENT |
| | IF PAVERS ARE USED IN THE RIGHT OF WAY PORTION OF THE |
| | DRIVEWAY. THE AGREEMENT MUST BE RECORDED AT PALM BEACH |
| | COUNTY COURTHOUSE - RECORDING DEPT. 4.25. A RECORDED |
| | COPY OF THIS DOCUMENT SHOULD BE FAXED TO (561) |
| | 494-1116. ATTENTION: DRIVEWAY REVIEWER. DOCUMENT NEEDS |
| | TO BE RECORDED PRIOR TO FINAL SIGN OFF. |
| | |
| | THANKS, |
| | |
| | RICK ROSSANO |
| | PROJECT COORDINATOR, WPB ENGINEERING SERVICES, 401 |
| | CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX |
| | 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 |
| | CELL: (561) 246-9525 |
| | FAX: (561) 494-1116 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |