| Plan Review Notes For Permit 20030198 |
| Permit Number |
20030198 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-03-16 16:55:23 | SFR ALTERATION | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | | | | CORRECTIONS NEEDED - FBC WPB AMENDMENTS 107 | | | 1) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE | | | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE | | | PRODUCT APPROVALS FOR THE NEW EXTERIOR DOORS AND | | | WINDOWS. | | | 2) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE | | | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE | | | PRODUCT APPROVALS FOR THE ROOFING SYSTEMS (SHINGLES AND | | | LOW SLOPE ROOFING). | | | 3) PLEASE SHOW THE STAIR HANDRAIL REQUIREMENTS AND | | | DETAILS TO COMPLY WITH FBC R311.7.8 | | | 4) PLEASE SHOW THE WINDOW SIZES (WIDTH AND HEIGHT). | | | SHOW THAT THE BEDROOM WINDOWS MEET EMERGENCY EGRESS | | | REQUIREMENTS PER FBC R310.1 | | | 5) PLEASE SHOW THE 2ND FLOOR EXTERIOR DECK (ROOFING) | | | SLOPE TO COMPLY WITH FBC R905.11.1 | | | 6) PLEASE SHOW THE 2ND FLOOR EXTERIOR DECK (ROOF) DRAIN | | | TO COMPLY WITH FBC R903.4 AND THE OVERFLOW DRAINAGE TO | | | COMPLY WITH FBC R903.4.1 | | | 7) PLEASE SHOW THE NAILING AND LAPPING REQUIREMENTS FOR | | | THE 2X'S JOINED TOGETHER TO CREATE BEAMS (30' LONG | | | DOUBLE JOIST) AND POST (4 AND 5 2X'S) | | | 8) PLEASE PROVIDE A SIGNED AND SEALED SOIL REPORT OR | | | PROVIDE A NOTE ON THE DRAWING FOR THE BEARING CAPACITY | | | OF THE SOIL. FBC R401.4 | | | | | | |
|