| 2020-03-11 09:01:17 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION |
| | MANUAL FOR THE OIL-GUARD SYSTEM. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 2) SHT. P000 - PUMP SCHEDULE - A FULL OPEN VALVE IS |
| | REQUIRED ON THE DISCHARGE SIDE OF THE CHECK VALVE IN |
| | THE PUMP OR EJECTOR DISCHARGE PIPING BETWEEN THE PUMP |
| | OR EJECTOR AND THE GRAVITY DRAINAGE SYSTEM. |
| | FBC-PLUMBING SEC. 712.2,1113.1.4. |
| | 3) SHOW THE DIMENSIONS OF THE SUMP PIT ON SHT.P000. THE |
| | SUMP PIT SHALL COMPLY WITH FBC-PLUMBING SEC.1113.1.2 AS |
| | A MINIMUM. |
| | 4) THERE ARE TWO COPIES OF SHT. P000. REMOVE THE OLD |
| | SHEET FROM THIS SUBMITTAL. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 5) SHT. P000 - SHOW THE REQUIRED FULL OPEN VALVE ON THE |
| | SUMP DETAIL. |
| | 6) SHTS. P101 & P102 - SOME OF THE STORM DRAINS ARE |
| | SHOWN AS 6 INCH ON THE PLAN VIEW YET THE STORM |
| | ISOMETRIC TYPICAL DECK DRAIN SECTION ONLY SHOWS 4 INCH |
| | PIPE. CLARIFY. |
| | 7) SHT. P102 - THERE IS A NOTE AT EACH STAIRWELL THAT |
| | STATES "SHEET FLOW DOWN TO FIRST LEVEL FROM COVERED |
| | STAIRWELL.REFERENCE CIVIL PLANS FOR STORM DRAINAGE." |
| | THERE IS NO INFORMATION REGARDING THIS ON THE CIVIL |
| | DRAWINGS IN THIS SUBMITTAL. CLARIFY THIS NOTE.WPB |
| | AMEND. TO FBC SEC. 107.2.1. |
| | 8) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION |
| | MANUAL FOR THE SUMP PUMP. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 9) SHT. P000 - SUMP PUMP DETAIL STILL SHOWS THE PUMP |
| | DISCHARGE LINE DIRECTLY CONNECTED TO THE STORM SYSTEM. |
| | THIS DISCHARGE LINE SHALL BE INDIRECTLY CONNECTED TO |
| | THE SANITARY SYSTEM PER FBC-PLUMBING SEC.301.6. |
| | 10) THE SANITARY LINE THAT THE PUMP IS DISCHARGING TO |
| | APPARENTLY HAS BEEN ABANDONED AND IS CAPPED OFF PER ONE |
| | OF MY FIELD INSPECTORS. RESEARCH SHALL BE DONE AND |
| | DOCUMENTATION SUBMITTED ON THIS LINE AND VERIFIED BY |
| | THE DESIGN PROFESSIONAL AND CONTRACTOR THAT THIS LINE |
| | IS STILL ACTIVE.WPB AMEND. TO FBC SEC. 107.2.1. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |